Perencanaan Jaringan Distribusi Air Bersih Untuk Pemenuhan Kebutuhan Air Bersih di P.T.Nusantara Energi Indonesia dan Sekitarnya

Prasetyo, Alit Rachmad Joko (2025) Perencanaan Jaringan Distribusi Air Bersih Untuk Pemenuhan Kebutuhan Air Bersih di P.T.Nusantara Energi Indonesia dan Sekitarnya. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2036201013_Undergraduate_Thesis.pdf] Text
2036201013_Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (7MB) | Request a copy

Abstract

Pada Port Site P.T. NEI ditemukan masalah bahwa disana tidak terjangkau oleh jaringan air bersih karena lokasi yang jauh dari pemukiman penduduk dan sulitnya medan untuk sampai di lokasi.Melihat dari alasan tersebut dilakukan perencanaan jaringan distribusi air bersih, meliputi analisis kebutuhan air, sistem distribusi, dan bangunan pengolah air (WTP). Kebutuhan air yang dilayani didasarkan dari proyeksi penduduk, kebutuhan komersial dan industri dengan hasil kebutuhan air sebesar 71,54 m3/jam.Total sambungan pipa sebanyak 26 sambungan dengan total panjang 25 km dan total node sebanyak 27. Pada perencanaan jaringan pipa menggunakan jenis pipa PE dengan Ø140 mm dan Ø80 mm. Perencanaan ini menggunakan kombinasi 3 pompa hidup dan 1 cadangan pada intake dengan head 25,5 m dan debit sebesar 24 m3/jam .Hasil yang diperoleh adalah kecepatan aliran rata-rata sebesar 0,5 m/s dan rata-rata pressure sebesar 18,68 m. Dari hasil perhitungan reservoir didapat volume sebesar 344,64 m3, maka dari itu di rencanakan reservoir dengan dimensi 8 x 8 x 5 m dilengkapi pengatur level air.Perlu adanya pemeliharaan dan SOP pada jaringan perpipaan yang sudah direncanakan dengan tujuan untuk meminimalisir kebocoran atau kerusakan yang tidak di inginkan.
=====================================================================================================================================
At the Port Site of P.T. NEI, it was found that the site was not accessible by clean water networks due to its remote location from residential areas and the difficult terrain to reach the site. Considering these reasons, a clean water distribution network plan was developed, including an analysis of water needs, distribution systems, and water treatment plants (WTP). The water demand being served is based on population projections, commercial, and industrial needs, resulting in a total water demand of 71.54 m³/hour. The total number of pipeline connections is 26, with a total length of 25 km and a total of 27 nodes. In the pipeline network planning, PE pipes with diameters of Ø140 mm and Ø80 mm were used. This planning uses a combination of 3 operational pumps and 1 standby pump at the intake with a head of 25.5 m and a flow rate of 24 m³/hour. The results obtained are an average flow velocity of 0.5 m/s and an average pressure of 18.68 m. From the reservoir calculation results, the volume obtained is 344.64 m³, therefore a reservoir with dimensions of 8 x 8 x 5 m is planned, equipped with a water level regulator. Maintenance and standard operating procedures (SOPs) are required for the planned piping network to minimize leaks or unwanted damage.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Air Besih, Distribusi, Kebutuhan Air , WTP, EPANET 2.2
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD395 Reservoirs (water supply)
T Technology > TD Environmental technology. Sanitary engineering > TD481 Water distribution systems
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Alit Rachmad Joko Prasetyo
Date Deposited: 05 Aug 2025 09:22
Last Modified: 05 Aug 2025 09:22
URI: http://repository.its.ac.id/id/eprint/127229