Optimasi Sistem Pltmh Studi Kasus Sungai Di Desa Duren Kecamatan Gading Kabupaten Probolinggo

Kurniwati, Luluk (2022) Optimasi Sistem Pltmh Studi Kasus Sungai Di Desa Duren Kecamatan Gading Kabupaten Probolinggo. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 01111840000015-Undergraduate_Thesis.pdf] Text
01111840000015-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy

Abstract

Desa Duren Kecamatan Gading memiliki sumber listrik berupa pembangkit listrik tenaga mikrohidro. Tidak maksimalnya pemanfaatan Sumberdaya alam, sistem pembagian daya listrik dan managemen ekonomi menuntut adanya analisis dengan melakukan optimasi untuk mendapatkan sistem dengan hasil yang optimum, serta analisis ekonomi yang jelas sehingga diharapkan menghasilkan value yang dapat meningkatkan hasil sumber energi terbarukan serta menaikkan taraf hidup masyarakat. Dalam melakukan analisis potensi, penentuan sistem pembagian energi dan perhitungan analisis ekonomi memerlukan data pengukuran debit serta wawancara dengan masyarakat. Optimasi sistem dilakukan dengan menggunakan metode Particle Swarm Optimization (PSO) untuk melakukan pembagian daya yang layak terhadap jumlah kartu keluarga. Metode Particle Swarm Optimization (PSO) dipilih karena akurasi yang cukup tinggi. Pemilihan turbin yang cocok didasarkan pada head serta debit dan analisis ekonomi menggunakan perhitungan dengan Net Present Value, Internal Rate of Return dan back period serta simulasi dengan program HOMER. Berdasarkan optimasi yang dilakukan didapatkan hasil adanya potensi energi Mikrohidro yang terdapat di Desa Duren, potensi baru pada sungai mencapai 50 titik. Turbin yang cocok untuk debit serta beda ketinggian pada sungai di Desa Duren adalah turbin jenis vortex saja karena hanya memiliki beda ketinggian 2-3 m. Analisa daya yang dihasilkan dari pengukuran daya mikrohidro adalah 4862 Watt dengan pembagian dari tipe kombinasi PSOCO dengan P sebesar 340 Watt dan n sejumlah 14 keluarga dengan eror sebesar 0. Atau dari tipe kombinasi Sungkono dengan P sebesar 530,73 Watt dan dengan n sejumlah 9 dengan eror sebesar 0. Berdasarkan perhitungan ekonomi dengan iuran Rp10.000 per bulan Net Present Value dan Internal Rate of Return menunjukan angka positif serta back period dalam jangka waktu 4 tahun 3,5 bulan.
=================================================================================================================================
Duren Village, Probolinggo regency, has a power source in the form of a PLTMH. Inadequate utilization of natural resources, power sharing systems and economic management require an analysis by optimizing to obtain a system with optimum results, as well as a clear economic analysis so that it is expected to produce value that can increase the yield of renewable energy sources and raise the standard of living of the community. In carrying out the potential analysis, determining the energy distribution system and calculating the economic analysis, it requires data on discharge measurements and interviews with the community. System optimization is carried out using the Particle Swarm Optimization (PSO) method to perform a proper power distribution for the number of households. The Particle Swarm Optimization (PSO) method was chosen because of its high accuracy. The selection of a suitable turbine is based on the head and discharge and economic analysis using calculations with NPV IRR and back period and simulation with the HOMER program. Based on the optimization carried out, it was found that the potential for micro-hydro energy in Duren Village, the new potential in the river reached 50 points. The turbine which is suitable for the discharge and height difference on the river in Duren Village is a vortex type turbine only because it only has a height difference of 2-3 m. The power analysis generated from the measurement of micro hydro power is 4862 Watt with the division of the PSOCO combination type with P of 340 Watt and n of 14 families with an error of 0. Or from the Sungkono combination type with P of 530.73 Watt and with n of 9 with an error of 0. Based on economic calculations with a contribution of IDR 10,000 per month, the NPV and IRR show positive numbers and a back period of 4 years and 3.5 months.

Item Type: Thesis (Other)
Uncontrolled Keywords: Homer, Mikrohidro, Optimasi, PSO, Vortex, Mikrohidro, Optimization
Subjects: Q Science > QC Physics
Divisions: Faculty of Science and Data Analytics (SCIENTICS) > Physics > 45201-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 09 Oct 2025 06:01
Last Modified: 09 Oct 2025 06:01
URI: http://repository.its.ac.id/id/eprint/128538

Actions (login required)

View Item View Item