Utama, Frendy Satria (2025) Penilaian Risiko Teknis Pembangunan Jaringan Kabel Laut 20 KV Di Pulau Tunda Banten (Studi Kasus : PLN UID Banten). Masters thesis, Institute Teknologi Sepuluh November.
|
Text
6032232119-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (6MB) | Request a copy |
Abstract
Pembangunan jaringan kabel laut 20 KV di Pulau Tunda merupakan proyek strategis untuk meningkatkan keandalan pasokan listrik. Proyek ini menghadapi risiko teknis signifikan yang memerlukan manajemen risiko terstruktur. Penelitian ini bertujuan untuk mengidentifikasi, menganalisis, dan memprioritaskan strategi mitigasi risiko teknis menggunakan kombinasi metode Failure Mode and Effects Analysis (FMEA), Fault Tree Analysis (FTA), dan Analytical Hierarchy Process (AHP). Hasil FMEA mengidentifikasi sepuluh mode kegagalan teknis, dengan tiga risiko teratas berdasarkan nilai Risk Priority Number (RPN) adalah: Kegagalan sambungan (jointing) kabel (RPN 345,31 - kategori Extreme), Keterlambatan perbaikan/logistik (RPN 294,00 - kategori High), dan Kerusakan mekanis kabel bawah laut (RPN 231,56 - kategori High). Temuan ini menunjukkan bahwa aspek teknis dan operasional manusia, terutama proses jointing dan kesiapan logistik, merupakan titik kritis utama. Analisis FTA terhadap risiko kritis (R4, R10, R1) menunjukkan bahwa akar penyebab kegagalan sangat dipengaruhi oleh faktor manusia dan operasional, seperti ketidaksesuaian prosedur pemasangan, penggunaan material splicing yang tidak standar, serta keterbatasan logistik dan birokrasi perizinan yang kompleks. Melalui AHP, kriteria mitigasi yang paling dominan adalah Keandalan Sistem Kelistrikan (bobot 0,3389) dan Pengendalian Risiko Eksternal (bobot 0,2777). Berdasarkan pembobotan ini, strategi mitigasi yang paling efektif dan diprioritaskan secara global adalah Penetapan Zona Larangan Labuh dan Sosialisasi kepada Masyarakat (bobot global 0,3722), diikuti oleh Pemasangan Concrete Mattress (bobot global 0,3138). Strategi ini menekankan pentingnya perlindungan fisik yang dikombinasikan dengan peran regulasi dan partisipasi masyarakat. Penelitian ini memberikan kontribusi signifikan berupa kerangka kerja mitigasi risiko teknis yang terstruktur dan terprioritaskan, yang dapat menjadi panduan bagi PLN UID Banten untuk menjamin pelaksanaan proyek yang aman, efisien, dan berkelanjutan di lingkungan maritim yang kompleks.
==================================================================================================================================
The construction of a 20 kV submarine cable network in Tunda Island is a strategic project to enhance the reliability of the electricity supply. This project faces significant technical risks that require structured risk management. This study aims to identify, analyze, and prioritize technical risk mitigation strategies using a combination of Failure Mode and Effects Analysis (FMEA), Fault Tree Analysis (FTA), and the Analytical Hierarchy Process (AHP). The FMEA results identified ten technical failure modes, with the top three risks based on the Risk Priority Number (RPN) being: Cable jointing failure (RPN 345.31 - Extreme category), Repair/logistics delay (RPN 294.00 - High category), and Mechanical damage to the submarine cable (RPN 231.56 - High category). These findings indicate that human technical and operational aspects, particularly the jointing process and logistical readiness, are the main critical points. The FTA analysis of the critical risks (R4, R10, R1) revealed that the root causes of failure are heavily influenced by human and operational factors, such as non-compliance with installation procedures, the use of non-standard splicing materials, and limitations in logistics and complex administrative bureaucracy. Through AHP, the most dominant mitigation criteria were found to be Electrical System Reliability (weight 0.3389) and External Risk Control (weight 0.2777). Based on this weighting, the most effective and globally prioritized mitigation strategy is the Establishment of Anchor Prohibition Zones and Community Socialization (global weight 0.3722), followed by the Installation of Concrete Mattress (global weight 0.3138). This strategy emphasizes the importance of physical protection combined with regulatory and community participation roles. This research provides a significant contribution in the form of a structured and prioritized technical risk mitigation framework, which can serve as a guide for PLN UID Banten to ensure the safe, efficient, and sustainable execution of the project in a complex maritime environment.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | Risiko Teknis, Kabel Laut, FMEA, FTA, AHP, Jaringan 20 KV, Pulau Tunda Technical Risks, Submarine Cable, FMEA, AHP, 20 KV Network, Tunda Island. |
| Subjects: | T Technology > T Technology (General) > T56.8 Project Management |
| Divisions: | Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT) |
| Depositing User: | Frendy Satria Utama |
| Date Deposited: | 23 Dec 2025 02:39 |
| Last Modified: | 23 Dec 2025 02:39 |
| URI: | http://repository.its.ac.id/id/eprint/129046 |
Actions (login required)
![]() |
View Item |