Endrianto, Ennol (2009) Tinjauan Teknis Penggunaan HRSG Pada PLTG Gilimanuk. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
4205100042-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (26MB) | Request a copy |
Abstract
Selama ini, walaupun pulau Bali mempunyai pembangkit listrik sendiri, akan tetapi untuk memenuhi kebutuhan listrik di pulau Bali masih membutuhkan pasokan listrik dari pembangkit dari pulau Jawa. Hal itu disebabkan karena pembangkit listrik di pulau Bali tersebut masih kurang dalam memenuhi kebutuhan pulau Bali. Di Bali kenaikan beban puncak yang terjadi pada malam hari tersebut besarnya mencapai 455 MW, beban puncak tersebut hanya dapat di suplai daya sebesar 330 MW oleh pembangkit yang ada di Bali, sedangkan sisanya mengandalkan daya dari pulau Jawa melalui kabel bawah laut sebesar 200 MW sehingga pasokan listrik pulau Bali masih aman di kisaran 530 MW. Dengan melihat perkembangan tersebut, maka tuntutan akan adanya unit unit pembangkit sebagai pusat penghasil energi listrik terimbas untuk berkembang. Dalam tugas akhir ini untuk membantu penambahan daya pada pembangkit listrik di pulau Bali dilakukan dengan cara peningkatan e.fisiensi. Yaitu dengan cara combine cycle dengan memanfaatkan gas buang dari gas turbin yang kemudian panas tersebut dimanfaatkan untuk memanaskan HRSG, kemudian nantinya dari HRSG tersebut dapat diketahui besarnya tekanan yang akan dimanfaatkan untuk mengerakkan Steam Turbin yaitu sebesar 9 Mpa,dan suhu sebesar 513 °C. Dalam pemanfoatan gas huang tersebut juga dapat diketahui perencanaan tube-tube untuk desain HRSG. Dari hasil keluaran HRSG tersebut dapat dihasilkan penambahan daya yaitu sebesar 110 MW sehingga daya total combyne cycle mencapai 243 MW. Penambahan daya tersebut, selain dengan pemanfaatan gas huang, juga dibantu dengan adanya additional firing agar suhu gas huang dapat memanaskan air menjadi uap superheated Banyaknya bahan bakar HSD yang dibutuhkan untuk additional firing yaitu 1851, 6 kg/jam
====================================================================================================================================
So far, even though the island of Bali has its own power plant, but to meet the electricity needs on the island of Bali still requires electricity supply from power plants from the island of Java. This is because the power plants on the island of Bali are still insufficient to meet the needs of the island of Bali. In Bali, the increase in peak load that occurs at night is as large as 455 MW, the peak load can only be supplied by 330 MW of power by the existing power plant in Bali, while the rest relies on power from the island of Java through undersea cables of 200 MW so that the electricity supply on the island of Bali is still safe at around 530 MW. By seeing these developments, the demand for power plant units as centers for producing electrical energy is affected to develop. In this final project to help increase the power of power plants on the island of Bali is done by increasing efficiency. Namely by using a combine cycle by utilizing exhaust gas from the gas turbine which is then used to heat the HRSG, then later from the HRSG it can be known the amount of pressure that will be used to drive the Steam Turbine which is 9 Mpa, and a temperature of 513 °C. The utilization of Huang gas also provides insight into the tube design for the HRSG. The HRSG output can generate an additional power of 110 MW, bringing the total combyne cycle power to 243 MW. This additional power, in addition to Huang gas utilization, is also supported by additional firing to heat water into superheated steam. The amount of HSD fuel required for additional firing is 1851.6 kg/hour.
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | RSSP 621.194 End t-1 2009 (weeding) |
| Uncontrolled Keywords: | Combyne cycle, gas buang, steam turbin, desain HRSG, penambahan daya; Combyne cycle, exhaust gas, steam turbine, HRSG design, addition of energy |
| Subjects: | T Technology > TJ Mechanical engineering and machinery > TJ254.7 Combustion chambers T Technology > TJ Mechanical engineering and machinery > TJ263 Heat exchangers T Technology > TJ Mechanical engineering and machinery > TJ263.5 Boilers (general) |
| Divisions: | Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis |
| Depositing User: | EKO BUDI RAHARJO |
| Date Deposited: | 19 Dec 2025 08:47 |
| Last Modified: | 19 Dec 2025 08:47 |
| URI: | http://repository.its.ac.id/id/eprint/129109 |
Actions (login required)
![]() |
View Item |