Analisis Penentuan Siklus Jadwal Pekerja Di Wilayah Kerja PT KPI Unit Cilacap Kilang RFCC Pada Tahap Dekontaminasi Turn Around

Melano, Fauzan Desta (2026) Analisis Penentuan Siklus Jadwal Pekerja Di Wilayah Kerja PT KPI Unit Cilacap Kilang RFCC Pada Tahap Dekontaminasi Turn Around. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032241114-Master_Thesis.pdf] Text
6032241114-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (3MB) | Request a copy

Abstract

Turn Around (TA) merupakan aktivitas pemeliharaan berkala yang sangat krusial di kilang minyak, termasuk di Kilang RFCC PT Kilang Pertamina Internasional (PT KPI) Unit Cilacap, dimana tahap dekontaminasi menjadi salah satu tahapan kritis yang menuntut penjadwalan kerja efektif untuk meminimalkan kelelahan dan risiko keselamatan kerja. Penelitian ini bertujuan menganalisis dan menentukan siklus kerja optimal bagi pekerja selama tahap dekontaminasi dengan mempertimbangkan aspek kesehatan fisik dan beban kerja mental. Studi ini membandingkan dua pola kerja yang pernah diterapkan, yaitu shift 12 jam (pola 2:1) dan Person In Charge (PIC), dengan mengintegrasikan empat pendekatan: analisis tekanan darah pekerja sebagai indikator fisiologis, NASA Task Load Index (NASA-TLX) untuk menilai beban kerja mental, Multidimensional Fatigue Inventory (MFI-20) untuk mengukur tingkat kelelahan multidimensi, dan Fuzzy Analytical Hierarchy Process (F-AHP) untuk menentukan alternatif terbaik. Hasil penelitian menunjukkan adanya perbedaan signifikan antara pola 2:1 dan PIC, dimana rata-rata Weighted Workload (WWL) pekerja pada siklus 2:1 adalah 74,31 (kategori tinggi) dan meningkat menjadi 87,12 (kategori sangat tinggi) pada siklus PIC. Hasil MFI juga menunjukkan peningkatan kelelahan dari rata-rata 48,18 (kategori sedang) pada siklus 2:1 menjadi 67,89 (kategori tinggi) pada siklus PIC. Analisis F-AHP menempatkan siklus kerja 2:1 sebagai alternatif terbaik dengan bobot prioritas 0,324. Temuan ini merekomendasikan penerapan siklus 2:1 sebagai pola kerja paling optimal untuk menjaga produktivitas, keselamatan, serta kesejahteraan pekerja, sekaligus menjadi acuan bagi pengembangan kebijakan kerja berbasis bukti dalam kegiatan TA serupa di industri minyak dan gas
====================================================================================================================================
Turn Around (TA) is a periodic maintenance activity that plays a critical role in refinery operations, including at the RFCC Refinery of PT Kilang Pertamina Internasional (PT KPI) Unit Cilacap, where the decontamination stage represents one of the most crucial phases requiring effective work scheduling to minimize fatigue and occupational safety risks. This study aims to analyze and determine the optimal work cycle for employees during the decontamination phase by considering both physical health and mental workload aspects. Two previously implemented work patterns were evaluated, namely the 12-hour shift (2:1 pattern) and the Person In Charge (PIC) system, through the integration of four approaches: blood pressure analysis as a physiological indicator, the NASA Task Load Index (NASA-TLX) to assess mental workload, the Multidimensional Fatigue Inventory (MFI-20) to measure multidimensional fatigue levels, and the Fuzzy Analytical Hierarchy Process (F-AHP) to determine the most suitable alternative. The findings reveal a significant difference between the two patterns, with the average Weighted Workload (WWL) of workers under the 2:1 cycle recorded at 74.31 (high category), which increased to 87.12 (very high category) under the PIC cycle. Similarly, the MFI results indicate an increase in fatigue levels from an average of 48.18 (moderate category) in the 2:1 cycle to 67.89 (high category) in the PIC cycle. The F-AHP analysis further confirms the 2:1 work cycle as the optimal alternative with a priority weight of 0.324. These results recommend adopting the 2:1 work cycle as the most effective pattern to sustain productivity, ensure safety, and promote worker well-being, while also providing evidence-based guidance for policy development in similar TA operations within the oil and gas industry.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Turn Around, dekontaminasi, siklus kerja, kelelahan kerja, keselamatan kerja.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Fauzan Desta Melano
Date Deposited: 08 Jan 2026 07:45
Last Modified: 08 Jan 2026 07:45
URI: http://repository.its.ac.id/id/eprint/129383

Actions (login required)

View Item View Item