Nugraha, Rifqi (2022) Risk Analysis Of Work Accident On Tuntang Bridge’s Erection Girder, Semarang – Demak Section 2 Toll Road Project With Task Demand Assessment (TDA) Method. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
03111840000121-Undregraduate_thesis.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
Abstract
Keselamatan dan Kesehatan Kerja merupakan suatu hal yang sangat penting di dunia konstruksi karena bersinggungan langsung dengan pekerja, perhitungan potensi risiko yang salah dapat mengakibatkan terjadinya kecelakaan kerja terutama kepada para pekerja,di Indonesia sendiri kecelakaan kerja pada pekerjaan erection girder masih sering terjadi, sekitar 6 insiden terkait kecelakaan kerja pada pekerjaan erection girder terjadi dalam kurun waktu 2017-2021 maka tugas akhir ini dibuat dengan judul “Analisis Risiko Kecelakaan Kerja Pada Pekerjaan Erection Girder PCI Jembatan Tuntang Proyek Tol Semarang-Demak Seksi 2” Menggunakan metode Task Demand Assessment (TDA) untuk meminimalisir kecelakaan kerja dalam pekerjaan erection girder jembatan. Berdasarkan hasil dari penelitian ini didapatkan empat buah risiko yang memiliki potensi tertinggi diantaranya adalah crane collapse saat pengangkatan girder dengan accident point senilai 39,6 point, sling terputus saat pengangkatan girder dengan accident point senilai 37,6 point, girder collapse dengan accident point senilai 42,8 point, dan kegagalan struktur spreader beam dengan accident point senilai 41,2 point, risiko tersebut ditimbulkan oleh beberapa faktor diantaranya, faktor risiko penggunaan alat pelindung diri (APD), kecepatan angin, kesehatan pekerja, pergerakan pekerja, setting alat kerja, dan kredibilitas pekerja.
======================================================================================================================================
Occupational Safety and Health is a very important thing in the construction world because it is in direct contact with workers. An incorrect calculation of potential risks can result in work accidents, especially for workers. In Indonesia alone, work accidents on erection girder work are still common. There are around 6 incidents related to work accidents on erection girder work that occurred in the period 2017–2021. This final project was made with the title Risk Analysis of Work Accidents at PCI Erection Girder Work on the Tuntang Bridge Semarang-Demak Toll Project Section 2. Using the Task Demand Assessment (TDA) Method to minimize accidents at work in bridge girder erection work. This research was conducted using the Task Demand Assessment (TDA) method. The TDA method was used to quantify the potential risk of work accidents with the characteristics of work activities and worker behavior factors on the project. Based on the results of this study, there were four risks that had the highest potential, including crane collapse when lifting the girder with an accident point of 39.6 points, a broken sling when lifting the girder with an accident point of 37.6 points, and girder collapse with an accident point of 42.8 points, and the failure of the spreader beam structure with an accident point of 41.2 points, the risk is caused by several factors including, risk factors for using personal protective equipment (PPE), wind speed, worker health, worker movement, setting of work tools, and worker credibility.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Erection Girder, Faktor Risiko, Keselamatan dan Kesehatan Kerja, Risiko, Task Demand Assessment, Girder Erection, Occupational Safety and Health, Risk, Risk Factors, Task Demand Assessment |
| Subjects: | H Social Sciences > HE Transportation and Communications > HE5614.2 Traffic safety |
| Divisions: | Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses |
| Depositing User: | Mr. Marsudiyana - |
| Date Deposited: | 14 Jan 2026 01:23 |
| Last Modified: | 14 Jan 2026 01:23 |
| URI: | http://repository.its.ac.id/id/eprint/129580 |