Sidoarjo merupakan salah satu kabupaten di Jawa Timur yang memiliki kekuatan ekonomi berupa pusat-pusat kawasan industri. Hal tersebut menyebabkan daerah yang awalnya berupa tambak dan lahan kosong berubah fungsi menjadi kawasan perindustrian. Salah satu pusat industri adalah kawasan pabrik minuman yang berlokasi di Sepanjang, Sidoarjo. Kawasan tersebut menempati lahan seluas 12 ha dengan kondisi tutupan lahan relatif kedap. Hal ini menyebabkan terjadinya peningkatan limpasan air terutama pada saat terjadi hujan. Peningkatan kuantitas limpasan ini berdampak pada terjadinya genangan dan banjir di sekitar kawasan. Oleh karena itu, perlu diimbangi dengan perencanaan sistem drainase yang baik. Hasil pengamatan kondisi di lapangan menunjukkan bahwa terjadi genangan dan banjir di kawasan pabrik. Permasalahan tersebut disebabkan oleh beberapa hal yaitu kapasitas saluran drainase utama kawasan yang tidak mampu mengalirkan debit limpasan dan terjadinya backwater di hilir saluran akibat tingginya muka air pada saluran utama kawasan. Kondisi tersebut menjadi alasan utama harus dilakukan perencanaan ulang sistem drainase untuk mengatasi permasalahan yang terjadi. Tahap pertama dalam merencanakan ulang sistem drainase kawasan pabrik adalah dengan melakukan studi lapangan dan studi literatur untuk mengidentifikasi dan menentukan kesenjangan antara kondisi eksisting dan ideal. Proses selanjutnya adalah pengumpulan data-data meliputi data hidrologi berupa data curah hujan, data peta lokasi (peta tata guna lahan dan layout kawasan pabrik), serta data hidrolika berupa penampang saluran eksisting (dimensi dan elevasi). Setelah data-data dikumpulkan, maka dilakukan analisis hidrologi untuk mendapatkan debit banjir rencana sebagai dasar evaluasi sistem drainase eksisting sehingga dapat diketahui apakah sistem drainase eksisting dapat menampung dan mengalirkan debit rencana yang telah diperhitungkan. Jika saluran tidak mampu menampung debit rencana, maka dilakukan perencanaan ulang dimensi saluran drainase dan fasilitas pendukung drainase berupa kolam tampung yang dilengkapi dengan pintu air dan pompa. Berdasarkan hasil analisis, terjadinya genangan dan banjir di dalam kawasan pabrik disebabkan sistem drainase yang tidak mampu menampung debit rencana yang terjadi. Sehingga, dibutuhkan perencanaan ulang pada sistem drainase dalam kawasan pabrik dengan merevitalisasi semua salurannya menggunakan U-Ditch. Pada Tugas Akhir ini direncanakan sistem drainase dengan menggunakan 2 outlet yaitu Outlet A dan Outlet B yang mengalirkan air hujan dalam kawasan pabrik ke kolam tampung untuk menampung air terlebih dahulu sebelum dibuang ke saluran luar kawasan (Avfour Botokan). Hasil analisis hidrologi dari curah hujan rencana untuk periode ulang 5 tahun adalah sebesar 128,7 mm dengan besar debit rencana pada Outlet A adalah 0,4387 m3/det dan pada Outlet B adalah 0,7753 m3/det. Terdapat 2 buah kolam tampung yang direncanakan yaitu kolam tampung A dengan volume tampungan 1.600 m3 dan kolam tampung B dengan volume tampungan 1.358,4 m3 yang dilengkapi dengan pintu air dan pompa dengan kapasitas masing-masing adalah sebesar 0,2 m3/det dan 0,5 m3/det.
================================================================================================================================
Sidoarjo is one of the regencies in East Java that has economic strength in the form of industrial area centers. This causes the areas which were originally in the form of the aquaculture areas and vacant land to turn into an industrial area. One of the industrial area centers is a beverage factory which located in Sepanjang, Sidoarjo. The area occupies an area with 12 ha with impermeable land cover conditions. This causes an increase in water runoff, especially when it rains. This increase in runoff quality has an impact on the occurrence of inundation and flooding around the area. Therefore, a good drainage system is needed to overcome this. The results of the observations in the field showed that there were inundation and flooding in the area. These problems are caused by several things the capacity of the main drainage channel in the area that is not able to drain the runoff discharge and the occurrence of backwater at downstream due to the high-water level in the main channel area. This condition is the main reason for redesign the drainage system to overcome the problems that occur. The first stage in redesigning the drainage system of the factory area is to conduct field studies and literature studies to identify and determine the gap between the existing and the ideal conditions. The next process is to collect the required data including hydrological data in the form of rainfall data, location map data (land use maps and the factory area layout), and the hydraulic data in the form of cross-section of existing channels (dimensions and elevation). After the data are collected, a hydrological analysis is carried out to obtain the planned flood discharge as the basis for evaluating the existing drainage system, so that it can be seen whether the existing drainage system can accommodate and drain the calculated planned discharge. If the channel is unable to accommodate the planned discharge, then the dimensions of the drainage channel and drainage support facilities are carried out in the form of planning the reservoir equipped with a floodgate and a water pump. Based on the results of the analysis, the occurrence of inundation and flooding in the factory area was caused by the drainage system that was not able to accommodate the planned discharge. So that, it is necessary to redesign the drainage system in the factory area by revitalizing all the channels using U-Ditch. In this final project, a drainage system is planned to use 2 outlets, namely Outlet A and Outlet B which drains the rainfall that flows in the factory area to the reservoir to collect water before being discharge into a channel outside the area (Avfour Botokan). The results of the hydrological analysis of the planned rainfall for the 5-year return period is 128,7 mm with the planned discharge at Outlet A is 0,4387 m3/s and at Outlet B is 0,7753 m3/s. There are 2 reservoirs planned, namely Reservoir A with storage volume of 1.600 m3 and Reservoir B with a storage volume of 1.358,4 m3 equipped with floodgate and water pumps with capacities of 0,2 m3/s and 0,5 m3/s.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Drainase, Genangan, Banjir, Kolam Tampung, Sidoarjo, Drainage, Inundation, Flooding, Reservoir, Sidoarjo. |
| Subjects: | T Technology > TE Highway engineering. Roads and pavements > TE215 Drainage |
| Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
| Depositing User: | Mr. Marsudiyana - |
| Date Deposited: | 15 Jan 2026 07:55 |
| Last Modified: | 15 Jan 2026 07:55 |
| URI: | http://repository.its.ac.id/id/eprint/129661 |
Actions (login required)
![]() |
View Item |