Putri, Amirahhanan Shiyamirahmah (2022) Perkuatan Talud Di Area Galian Dan Timbunan Dan Sistem Subdrainage Lapangan Sepak Bola Pada Pembangunan Kompleks Sekolah Sepak Bola Sukabumi. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
03111840000157-Undregraduate_thesis.pdf Restricted to Repository staff only Download (41MB) | Request a copy |
Abstract
Rencana pembangunan Sekolah Sepak Bola seluas 3,8 Ha yang berlokasi di Kabupaten Sukabumi, Jawa Barat, memiliki topografi eksisting yang tidak rata (menurun). Oleh sebab itu, pekerjaan galian dan timbunan harus dilakukan untuk memperoleh elevasi area dalam kompleks seperti yang direncanakan. Sebagai akibatnya, terbentuk beberapa talud antar area yaitu Talud 1 (antara Area 1 dan 2) setinggi 4,80 m, Talud 2 (antara Area 2 dan 3) setinggi 7,20 m, dan Talud 3 (antara Area 3 dan batas lahan) setinggi 12,57 m. Salah satu fasilitas sekolah yaitu Gedung Akademi direncanakan berada di antara Area 2 dan 3 sehingga harus dilakukan pemotongan Talud 2. Dengan demikian, bagian belakang Gedung tersebut berada pada galian sedalam 6,00 m. Selain itu, galian yang dilakukan tersebut mengakibatkan jalan eksisting yang ada di luar kompleks berada pada elevasi 4,32 m di atas area. Perencanaan lapangan sepak bola juga memerlukan sistem subdrainage agar lapangan bebas dari genangan air hujan. Stabilitas Talud 1, 2, dan 3 yang direncanakan dianalisis dengan menggunakan program bantu, dan harga SF yang diperoleh masing-masing 0,31, 0,49, dan 0,24. Untuk meningkatkan stabilitasnya (SF ≥ 1,5), talud diperkuat dengan menggunakan alternatif micropile atau geotextile dengan kekuatan Tult = 150 kN/m. Sedangkan untuk perencanaan dinding penahan pada sisi belakang Gedung Akademi dan sisi jalan, alternatif perkuatan yang igunakan adalah secant pile atau soldier pile. Kesetimbangan gaya yang bekerja pada dinding dianalisis untuk menentukan panjang dan kebutuhan angkur agar deformasi yang terjadi tidak lebih dari 0,5% tinggi dinding. Sistem subdrainage lapangan direncanakan menggunakan pipa HDPE perforated corrugated untuk mengalirkan hujan rencana setinggi 165,30 mm. Dari hasil analisis, diketahui bahwa Talud 1 memerlukan 23 tiang micropile 400 mm x 400 mm atau 18 lapis geotextile masing-masing 2 lembar; Talud 2 memerlukan 8 tiang micropile 300 mm x 300 mm atau 6 lapis geotextile; Talud 3 memerlukan 62 tiang micropile 450 mm x 450 mm atau 50 lapis geotextile. Sedangkan, dinding Gedung Akademi memerlukan secant pile ukuran 800 mm sepanjang 12,50 m atau soldier pile dengan profil W 14x16x550 sepanjang 12,50 m, dan dinding sisi jalan memerlukan secant pile ukuran 800 mm sepanjang 15,00 m atau soldier pile dengan profil W 14x14,5x132 sepanjang 11,00 m. Berdasarkan pertimbangan biaya material yang lebih ekonomis, alternatif perkuatan yang disarankan yaitu geotextile untuk lereng dan secant pile berangkur untuk dinding. Untuk kebutuhan subdrainage pada lapangan sepak bola diperlukan pipa ukuran 10 cm yang dipasang pada jarak setiap 2,00 m.
===============================================================================================================================
There’s a development of a Soccer Academy with a site area of 3,80 hectares located in Sukabumi Regency, West Java on a hillside terrain. Therefore, cut and fill work will be carried out to obtain several planned elevations within the complex. As a result, slopes will be formed between areas, namely Slope 1 (between Area 1 and 2) with 4,80 m height, Slope 2 (between Area 2 and 3) with 7,20 m height, and Slope 3 (between Area 3 and site boundary) with 12,57 m height. One of the school facilities, the Academy Building is planned between Area 2 and Area 3 so Slope 2 will be cut. Therefore, rear side of Academy Building will face a soil thickness of 6,00 m. Beside that, the excavation work will cause the existing road next to school complex located 4,32 m higher than the area. Soccer fields planning also require subdrainage system to avoid puddles. Slope 1, 2, and 3 stability was analyzed using software and SF obtained was 0,31, 0,49, and ,24 respectively. To improve the safety factor (SF ≥ 1,50), the slopes are stabilized using micropile or geotextile with Tult = 150 kN/m. As for embedded wall planning of Academy Building and roadside, compared wall reinforcements are secant pile and soldier pile. The equilibrium of forces acting on the wall is analyzed to determine the length and need for anchorage so that the deformation that occurs is less than 0 5% of the wall height. The planned field ubdrainage system is using perforated corrugated HDPE pipe to drain the design rainwater fall as high as 165,30 mm. Based on the carried-out analysis, the result show that Slope 1 requires 23 piles of 400 mm x 400 mm micropiles or 18 layers geotextile with double leafs each; Slope 2 requires 8 piles of 300 mm x 300 mm micropiles or 6 layers of geotextile. Slope 3 requires 62 piles of 450 mm x 450 mm micropiles or 50 layers of geotextile. Whereas Academy Building Wall requires 800 mm sized secant pile with a 12,50 m length or W14x16x550 soldier pile with a 12,50 m length, and the roadside wall requires 800 mm sized secant pile with a 15,00 m length or W14x14,5x132 soldier pile with an 11,00 m length. Considering economical benefit, the suggested reinforcement is geotextile for slopes and anchored secant piles for walls. Meanwhile, the pipe size required for soccer field subdrainage is 10 cm sized pipe arranged with 2,00 m spacing.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | geotextile, micropile, secant pile, soldier pile, subdrainage, geotextile, micropile, secant pile, soldier pile, subdrainage |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA749 Soil stabilization |
| Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
| Depositing User: | Mr. Marsudiyana - |
| Date Deposited: | 19 Jan 2026 01:26 |
| Last Modified: | 19 Jan 2026 01:26 |
| URI: | http://repository.its.ac.id/id/eprint/129687 |
Actions (login required)
![]() |
View Item |