Studi Perencanaan Pembangkit Listrik Tenaga Air (PLTA) Pada Bendungan Bendo, Dusun Bendo, Desa Ngindeng, Kecamatan Sawoo, Kabupaten Ponorogo

Winoto, Hari Winoto (2026) Studi Perencanaan Pembangkit Listrik Tenaga Air (PLTA) Pada Bendungan Bendo, Dusun Bendo, Desa Ngindeng, Kecamatan Sawoo, Kabupaten Ponorogo. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 5012201029-Undergraduate_Thesis.pdf] Text
5012201029-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (6MB) | Request a copy

Abstract

Bendungan Bendo terletak di Kabupaten Ponorogo, bendungan tersebut direncanakan sebagai penyedia air untuk irigasi, air baku dan pembangkit listrik tenaga air. Penggunaan energi listrik di Jawa Timur khususnya Kabupaten Ponorogo yang terus mengalami peningkatan sejak pasca pandemi 2020. Pembangunan Bendungan Bendo sebagai Pembangkit Listrik Tenaga Air (PLTA) menjadi salah satu alternatif untuk mensuplai keperluan listrik ke masyarakat khususnya di daerah Ponorogo, selain itu juga sebagai alternatif solusi dalam penyediaan energi baru dan terbarukan (EBT). Bendungan Bendo Ponorogo ini mempunyai potensi besar untuk dimanfaatkan oleh masyarakat sekitar seperti kebutuhan air baku, irigasi, dan untuk Pembangkit Listrik Tenaga Air (PLTA). Pemilihan lokasi studi dikarenakan bendungan terletak di daerah yang konturnya curam dengan tinggi jatuh bruto 71,10 m, kurang tersedianya akses listrik, dan memiliki debit yang besar sehingga berpotensi untuk difungsikan sebagai PLTA. Dalam perencanaan pembangkit listrik tenaga air (PLTA) di Bendungan Bendo analisis awal yang dilakukan adalah analisis debit dimana debit inflow berasal dari debit kebutuhan air irigasi dan direncanakan debit andalan PLTA sebesar 0,75 m3/detik. Perencanaan bangunan sipil pada PLTA yang meliputi bangunan intake, pipa pesat (penstock), surge tank, dan powerhouse yang menghasilkan kehilangan energi 4,51 m, sehingga tinggi jatuh efektif didapatkan 66,59 m. Total kehilangan energi tidak melebihi syarat kehilangan energi maksimum yaitu sebesar 7,11 m, sehingga perencanaan PLTA dapat dikatakan layak. Pada perencanaan PLTA ini digunakan satu unit turbin Francis dengan nilai efisiensi sebesar 0,865, yang mampu menghasilkan daya listrik sebesar 848,409 kW serta energi listrik tahunan sebesar 6.174.806,341 kWh. Berdasarkan kapasitas daya yang dihasilkan, PLTA tersebut termasuk dalam kategori Pembangkit Listrik Tenaga Air Minihidro (PLTMH) dengan klasifikasi head menengah. Diharapkan, hasil perencanaan PLTA Bendungan Bendo beserta fasilitas pendukungnya ini dapat menjadi acuan atau referensi dalam proses pembangunan PLTA Bendungan Bendo di masa mendatang.
==================================================================================================================================
Bendo Dam is located in Ponorogo District, it is planned as a provider of water for irrigation, raw water and hydroelectric power. The use of electrical energy in East Java, especially Ponorogo Regency, has continued to increase since post-pandemic 2020. The construction of the Bendo Dam as a Hydropower Plant (PLTA) is one alternative to supply electricity needs to the community, especially in the Ponorogo area, as well as an alternative solution in providing new and renewable energy (EBT). Bendo Dam has significant potential to be utilized for various purposes such as raw water supply, irrigation, and hydroelectric power generation. The study site was selected due to its steep topography with a gross head of 71.10 m, limited access to electricity, and relatively large discharge, making it suitable for hydroelectric development. In the planning of the hydroelectric power plant at Bendo Dam, the initial analysis focused on discharge calculation, where the inflow discharge was determined based on irrigation water requirements, and the dependable discharge for the PLTA was set at 0.75 m³/s. The civil structures of the PLTA, including the intake, penstock, surge tank, and powerhouse, were designed with a total head loss of 4.51 m, resulting in an effective head of 66.59 m. The total energy loss does not exceed the maximum allowable limit of 7.11 m, indicating that the PLTA design is feasible. The planned PLTA utilizes one unit of Francis turbine with an efficiency of 0,865, capable of generating an electric power output of 848,409 kW and an annual energy production of 6.174.806,341 kWh. Based on the generated capacity, the power plant is categorized as a Mini Hydropower Plant (PLTMH) with a medium-head classification. It is expected that the design of the Bendo Dam Hydroelectric Power Plant and its supporting facilities can serve as a reference for future PLTA development in the area.

Item Type: Thesis (Other)
Uncontrolled Keywords: Bendungan Bendo, Irigasi, PLTA, Tinggi Jatuh, Turbin; Bendo Dam, Hydroelectric Power Plant (PLTA), Head, Irrigation, Turbine.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Hari Winoto
Date Deposited: 23 Jan 2026 09:17
Last Modified: 23 Jan 2026 09:17
URI: http://repository.its.ac.id/id/eprint/130264