ARUM, ZULAIKHA PUSPITA (2016) MODIFIKASI GEDUNG PARKIR DAN KANTOR PT. PELINDO II MENGGUNAKAN STRUKTUR BAJA CASTELLATED BEAM DAN KOLOM CONCRETE FILLED STEEL TUBE. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
3113106001-Undergraduate_Theses.pdf - Published Version Download (14MB) | Preview |
Abstract
Baja merupakan alternatif bangunan tahan gempa yang sangat
baik. Jika dibandingkan dengan struktur beton, baja dinilai memiliki
sifat daktilitas yang dapat dimanfaatkan pada saat struktur memikul
beban akibat gempa. Pada balok kebanyakan struktur bangunan dengan
material baja menggunakan profil baja solid. Profil solid ini sudah
digunakan sejak awal perkembangan era struktur baja. Seiring dengan
perkembangannya dan mulai ditemukannya castellated beam ,
penggunaan profil baja mulai lebih beragam. Tetapi dibandingkan
dengan profil baja solid, profil castellated bisa menjadi solusi praktis
dalam pengerjaan konstruksi, karena karakteristiknya yang cukup
menguntungkan. Untuk struktur kolom baja kekhawatiran stabilitas
lokal dan global mencegah tabung baja telanjang dari mengembangkan
kekuatan penuh, kolom komposit awalnya disarankan. Ada berbagai
macam jenis kolom komposit dari berbagai penampang, tetapi yang
paling umum digunakan dan dipelajari adalah tabung baja berintikan
beton. Sebuah beton penuh concrete filled steel tube (CFT) dibentuk
dengan mengisi tabung baja dengan beton. Pada perhitungan struktur
gedung ini mengacu pada Standar Perencanaan Ketahanan Gempa
Untuk Struktur Bangunan Gedung SNI 03-1726-2012, Tata Cara
Perencanaan Struktur Baja Untuk Struktur Bangunan Gedung SNI 03-
1729-2015, dan Peraturan Pembebanan Indonesia Untuk Bangunan
Gedung PPIUG 1987. Dan dalam menganalisis strukturnya ditinjau
dengan pengaruh beban gempa dinamik dengan menggunakan program
bantu SAP 2000.
Dari analisa dan hasil perhitungan diperoleh hasil, yaitu: tebal
pelat atap, plat lantai dan plat parkir 9 cm, dimensi balok induk parkir
CB563.200.9.14, dimensi balok induk kantor CB500.200.8.13, dimensi
balok induk atap CB395.175.7.11, dimensi kolom lantai 1-3
HSS800.800.25.25, dimensi kolom lantai 4-6 HSS700.700.22.22,
dimensi kolom lantai 7-9 HSS600.600.16.16, tebal plat spsw 3 mm, dan
balok spsw menggunakan WF 800x300x16x30. Sambungan struktur
utama direncanakan sebagai sambungan kaku dengan baut A-325.
Perencanaan pondasi menggunakan tiang pancang beton pracetak
dimensi 50x50cm dengan kedalaman 17 m. Sloof ukuran 40 cm x 60 cm
dengan tulangan utama tarik 5D16 dan tekan 3D16 dan tulangan geser
Ø12-200.========== Steel is an alternative to earthquake resistant buildings is excellent.
When compared with the structure of concrete , steel is considered to
have ductility properties that can be utilized when the structure of the
burden caused by the earthquake . At block most material structure with
steel using solid steel profiles . This solid profile has been used since the
beginning of the era of the development of the steel structure . Along
with its development and begin the discovery of castellated beams, steel
profiles use began more diverse . But compared to the profile of solid
steel , castellated profile could be a practical solution in the
construction , because its characteristics are quite favorable.
Structural steel columns for local and global stability concerns
prevent bare steel tube from developing full power , composite columns
originally suggested . There are various types of composite columns of
various cross-section , but the most commonly used and studied is cored
steel tube concrete . A full concrete concrete filled steel tube ( CFT ) is
formed by filling a steel tube with concrete . In the calculation of the
structure of this building refers to the Earthquake Resilience Planning
Standards To SNI 03-1726-2012 Building Structures , Steel Structures
Planning Procedures For SNI 03-1729-2015 Building Structure and
Regulation of Indonesian Loading To Building PPIUG 1987. And in
analyze its structure is reviewed by the dynamic effect of seismic load by
using auxiliary program SAP in 2000 .
From the analysis and the calculation of results, namely : a thick
slab roof , floor plate and plate 9 cm parking , parking CB563.200.9.14
beam dimensions , dimensional beam CB500.200.8.13 office , the dimensions of the roof beam CB395.175.7.11 , column dimensions HSS800.800.25.25 for 1-3 storey , column dimensions HSS700.700.22.22 for 4-6 storey , column dimensions HSS600.600.16.16 for 7-9 storey , spsw plate thickness 3 mm , and beam spsw using WF 800x300x16x30. The main structure is planned as a connection rigid connection with bolts A- 325. Foundation design using precast concrete piles 50x50cm dimensions with a depth of 17 m .
Sloof size 40 cm x 60 cm with the main reinforcement pull 5D16 and 3D16 press and shear reinforcement Ø12-200 .
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Gempa, Struktur baja, Castellated Beam, Concrete Filled Steel Tube, Earthquake, Steel Structure. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction T Technology > TH Building construction |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | - Davi Wah |
Date Deposited: | 04 Jan 2017 08:08 |
Last Modified: | 26 Dec 2018 03:26 |
URI: | http://repository.its.ac.id/id/eprint/1305 |
Actions (login required)
View Item |