UPAYA EFISIENSI BIAYA DEPARTEMEN KONTRUKSI DALAM PILOT PROJECT PEMASANGAN ANODE MELALUI METODE VALUE STREAM MAPPING DAN LEAN SIX SIGMA

WIRATMAJA, I WAYAN (2016) UPAYA EFISIENSI BIAYA DEPARTEMEN KONTRUKSI DALAM PILOT PROJECT PEMASANGAN ANODE MELALUI METODE VALUE STREAM MAPPING DAN LEAN SIX SIGMA. Masters thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
9113202826-Master_theses.pdf - Published Version

Download (2MB) | Preview

Abstract

PT KLO sebagai perusahaan yang bergerak di bisnis minyak dan gas bumi memiliki kewajiban untuk mempertahankan integritas anjungan lepas pantai. Hal ini adalah bagian dari ketaatan kepada peraturan Pemerintah untuk menjaga keselamatan anjungan lepas pantai (Keputusan Direktur Jenderal Minyak dan Gas Bumi Nomor: 84.K/38/DJM/1998 Departemen Pertambangan Dan energi Republik Indonesia Direktur Jenderal Minyak Dan Gas Bumi mengenai Pedoman Dan Tatacara Pemeriksaan keselamatan Kerja Atas Instalasi Anjungan lepas Pantai). Mengacu hasil survey tahun 2012, diperlukan proses penggantian anode sebanyak 700-an dan diharapkan akan dapat diselesaikan sebelum tahun 2018. Departemen Konstruksi diharapkan memberikan upaya efisiensi biaya, terutama dalam efisiensi penggunaan DSV(diving support vessel). Penerapan proses value stream mapping berbasis lean six sixma akan menghilangkan non value added dari proses, sumber daya, waktu dan peralatan. Dengan melakukan value stream mapping dan lean six sigma, pilot project anode installation telah berhasil menerapkan perbaikan proses pemasangan 24 titik sacrificial anode di 7 anjungan lepas pantai menggunakan tug boat ( kapal tunda) dan SRP (scuba respiration package ). Terobosan lean six sigma ini mampu memberikan efiesiensi sebesar $ 277,440 untuk pemasangan 24 titik sacrificial anode. Penerapan selanjutnya adalah selain sebagai alternatif proyek utama penggantian anode, saat ini juga diterapkan sebagai alat survey untuk kebutuhan sertifikasi anjungan lepas pantai . ============================================================ PT KLO is a company engaged in the oil and natural gas business, has an obligation to maintain the integrity of offshore platforms. This is part of obedience to government regulations to ensure integrity of the offshore platform safety (Decision of the Director General of Oil and Gas No. 84.K / 38 / DJM / 1998 Ministry of Mining and Energy of the Republic of Indonesia Director General of Oil and Gas of the Guidelines and Procedures for Work Safety Check Offshore Platform Installation). Referring to the results of the Anode survey conducted in 2012, the number of Anode replacement will be as much as 700 each and plan to complete before 2018. Departement of Construction had requested to provide cost efficiency efforts, especially in the efficient use of DSV (diving support vessels). Application of the value stream mapping process based lean six sixma will eliminate nonvalue added processes, resources, time and equipment. By conducting value stream mapping and lean six sigma process pilot project anode installation has successfully implemented the installation improvement process of 24 points sacrificial anode at 7 platform using tugboat and SRP (scuba respiration package). This breakthrough is capable of providing actual efficiency amount to $277,440 for each installation of sacrificial anodes 24 points. Next implementation is the major anode replacement project as an alternatif, nowadays is applied, as a tool to survey offshore certification needs.

Item Type: Thesis (Masters)
Uncontrolled Keywords: pilot project anode installation, tug boat, DSV (diving support vessels), value stream mapping, lean six sigma
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Magister Management Technology
Depositing User: Mrs Anis Wulandari
Date Deposited: 05 Jan 2017 02:43
Last Modified: 27 Dec 2018 08:36
URI: http://repository.its.ac.id/id/eprint/1316

Actions (login required)

View Item View Item