Alifia, Chintya (2024) Studi Alternatif Perencanaan Alokasi Air Bendungan Bener Kabupaten Purworejo, Jawa Tengah. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
2036201069-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (34MB) | Request a copy |
Abstract
Bendungan Bener terletak di Desa Guntur, Kecamatan Bener, Kabupaten Purworejo, Jawa Tengah. bendungan ini direncanakan memiliki kapasitas sebesar 100,94 m³ dan bertujuan untuk mengairi lahan pertanian seluas 15.519 hektar serta menyediakan pasokan air baku sebesar 1.500 liter per detik. Meski pembangunan Bendungan Bener dijadwalkan selesai pada tahun 2023, proyek ini masih berlangsung dan diperkirakan akan selesai dalam beberapa tahun ke depan. Perencanaan alokasi air yang efektif menjadi penting mengingat kebutuhan dan permintaan layanan air yang terus meningkat. Analisis menunjukkan bahwa pada tahun 2024, jumlah penduduk yang harus dilayani adalah 1.159.689 jiwa dengan kebutuhan air baku sebesar 2,51 m³ per detik. Untuk kebutuhan air irigasi, alternatif 1 dengan pola tanam padi- padi-palawija dengan intensitas 278% memerlukan 18,59 m³ per detik, sementara alternatif 2 dengan pola tanam padi-padi-palawija dengan intensitas 223% memerlukan 24,33 m³ per detik. metode BCR digunakan untuk menentukan alternatif yang paling menguntungkan, di mana nilai BCR untuk alternatif 1 dan 2 masing-masing adalah 1,1 dan 1,03 dengan selisih pendapatan sebesar Rp 146.542.872.794,86. Oleh karena itu, alternatif 1 dipilih sebagai perencanaan yang paling efisien. Analisis lebih lanjut menggunakan aplikasi WEAP menunjukkan bahwa Bendungan Bener dapat memenuhi kebutuhan air pada tahun yang diproyeksikan, yaitu tahun 2023 hingga 2042, meskipun masih terjadi defisit di beberapa bulan tertentu.
================================================================================================================================
Bener Dam is located in Guntur Village, Bener District, Purworejo Regency, Central Java. This dam is planned to have a capacity of 100.94 m³ and aims to irrigate 15,519 hectares of agricultural land and provide a raw water supply of 1,500 liters per second. Although the construction of the Bener Dam is scheduled to be completed in 2023, the project is still ongoing and is expected to be completed in the next few years. Effective air allocation planning is important considering the increasing need and demand for air services. Analysis shows that in 2024, the population to be served is 1,159,689 people with a raw water requirement of 2.51 m³ per second. For irrigation water needs, alternative 1 with a rice-rice- secondary crops planting pattern with an intensity of 278% requires 18.59 m³ per second, while alternative 2 with a rice-rice-secondary crops planting pattern with an intensity of 223% requires 24.33 m³ per second. The BCR method is used to determine the most profitable alternative, where the BCR values for alternatives 1 and 2 are 1.1 and 1.03 respectively with a revenue difference of Rp 146,542,872,794.86. Therefore, alternative 1 is chosen as the most efficient planning. Further analysis using the WEAP application shows that the Bener Dam can meet air needs in the projected years, namely 2023 to 2042, although there is still a deficit in certain months.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Air Baku (Raw Water), BCR, Bendungan (Dam), Irigasi (Irrigation), Software WEAP (WEAP Software) |
| Subjects: | T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs T Technology > TC Hydraulic engineering. Ocean engineering > TC424 Water levels T Technology > TC Hydraulic engineering. Ocean engineering > TC812 Irrigation |
| Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
| Depositing User: | Chintya Alifia |
| Date Deposited: | 27 Feb 2026 02:09 |
| Last Modified: | 27 Feb 2026 02:09 |
| URI: | http://repository.its.ac.id/id/eprint/132649 |
Actions (login required)
![]() |
View Item |