Laporan magang industri 20 Januari 2025- 20 Mei 2025 di PT. PAL Indonesia

Anugraheni, Elsa Novytria (2025) Laporan magang industri 20 Januari 2025- 20 Mei 2025 di PT. PAL Indonesia. Project Report. s.n., [s.l.]. (Unpublished)

[thumbnail of 2038221075- Project_Report.pdf] Text
2038221075- Project_Report.pdf - Accepted Version
Restricted to Repository staff only

Download (3MB) | Request a copy

Abstract

Laporan magang ini membahas simulasi penjadwalan produksi parsial pada proyek High Pressure Heater (HPH) di PT PAL Indonesia menggunakan metode Critical Path Method (CPM). Permasalahan utama dalam proyek adalah keterlambatan pengadaan material impor yang menyebabkan beberapa aktivitas produksi tidak dapat berjalan sesuai jadwal. Oleh karena itu, dilakukan identifikasi aktivitas yang masih dapat dikerjakan berdasarkan ketersediaan material lokal dan material yang telah tersedia. Metode CPM digunakan untuk menyusun urutan pekerjaan, menentukan jalur kritis, serta menghitung estimasi waktu penyelesaian proyek secara simulatif. Analisis dilakukan melalui tahapan forward pass dan backward pass guna mengetahui aktivitas yang memiliki kelonggaran waktu (float) dan aktivitas yang bersifat kritis terhadap penyelesaian proyek. Hasil simulasi menunjukkan bahwa penjadwalan parsial mampu membantu perusahaan tetap menjalankan proses produksi secara efisien meskipun terdapat keterlambatan material. Selain itu, estimasi Work in Progress (WIP) dapat digunakan untuk memantau beban kerja dan progres produksi selama proses berlangsung sehingga pengelolaan sumber daya menjadi lebih optimal.
================================================================================================================================
This internship report discusses the simulation of partial production scheduling for the High Pressure Heater (HPH) project at PT PAL Indonesia using the Critical Path Method (CPM). The main issue in the project was the delay in imported material procurement, causing several production activities to be postponed. Therefore, an identification process was carried out to determine activities that could still be performed based on the availability of local and existing materials. The CPM method was applied to arrange work sequences, determine the critical path, and estimate the project completion time through simulation. The analysis was conducted using forward pass and backward pass calculations to identify activities with float time and activities that critically affect project completion. The simulation results indicate that partial scheduling can help the company maintain production efficiency despite material delays. In addition, the estimated Work in Progress (WIP) can be utilized to monitor workload and production progress, enabling more effective resource management during the production process.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Penjadwalan Produksi, Critical Path Method (CPM), Work in Progress (WIP), High Pressure Heater (HPH), Simulasi Produksi Parsial, Production Scheduling, Partial Production Simulation
Subjects: T Technology > TS Manufactures > TS157.5 Production scheduling
Divisions: Faculty of Vocational > Mechanical Industrial Engineering (D4)
Depositing User: Elsa Novytria Anugraheni
Date Deposited: 20 May 2026 00:32
Last Modified: 20 May 2026 00:32
URI: http://repository.its.ac.id/id/eprint/133244