Hernita, Faradiba Dwi (2026) Integrasi Total Quality Management (TQM) Dan Building Information Modelling (BIM) Untuk Meningkatkan Pengelolaan Mutu Proyek Konstruksi. Masters thesis, Institut Teknologi Sepuluh Nopember.
|
Text
6032232098-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (3MB) | Request a copy |
Abstract
Penelitian ini bertujuan untuk menyusun model integrasi Total Quality Management (TQM) dan Building Information Modelling (BIM) berbasis Lean Management dan Teknologi 4.0 dalam mendukung peningkatan pengelolaan mutu proyek konstruksi pada proyek pembangunan Ibu Kota Nusantara (IKN). Penelitian dilakukan melalui identifikasi prinsip TQM, dimensi BIM, Teknologi 4.0, elemen Last Planner System (LPS), dan aspek mutu proyek konstruksi yang meliputi defect reduction, rework minimization, waste register, dan performance quality. Metode penelitian menggunakan pendekatan deskriptif kualitatif dan kuantitatif melalui studi literatur, observasi proyek, penyusunan matriks integrasi, penyebaran kuesioner kepada 12 responden ahli, analisis Content Validity Ratio (CVR), serta Focus Group Discussion (FGD). Hasil penelitian menunjukkan bahwa integrasi TQM–BIM memiliki pengaruh positif terhadap pengelolaan mutu proyek konstruksi. Integrasi paling dominan diperoleh pada integrasi BIM 4D dengan Percent Plan Complete (PPC Evaluation), BIM Workflow dengan Pull Planning, serta pengambilan keputusan berbasis data melalui BIM 5D dan constraint management. Model integrasi yang dihasilkan mampu mendukung collaborative planning, monitoring proyek berbasis data real-time, dan continuous improvement dalam pengelolaan mutu proyek konstruksi. Selain itu, implementasi model memiliki peluang besar untuk mendukung digital construction pada proyek IKN, meskipun masih terdapat tantangan terkait integrasi sistem mutu digital, kesiapan sumber daya manusia, dan koordinasi antar stakeholder proyek.
===============================================================================================================================
This study aims to develop an integration model of Total Quality Management (TQM) and Building Information Modelling (BIM) based on Lean Management and Industry 4.0 Technology to improve construction project quality managementin the development project of Indonesia’s New Capital City (IKN). The research was conducted through the identification of TQM principles, BIM dimensions, Industry 4.0 Technology, Last Planner System (LPS) elements, and construction project quality aspects consisting of defect reduction, rework minimization, waste register, and performance quality. The research method employed qualitative and quantitative descriptive approaches through literature review, project observation, integration matrix development, questionnaire distribution to 12 expert respondents, Content Validity Ratio (CVR) analysis, and Focus Group Discussion (FGD). The results indicate that the integration of TQM–BIM has a positive impact on construction project quality management. The most dominant integrations were BIM 4D with Percent Plan Complete (PPC Evaluation), BIM Workflow with Pull Planning, and data-based decision making through BIM 5D and constraint management. The proposed integration model supports collaborative planning, real-time project monitoring, and continuous improvement in construction project quality management. Furthermore, the implementation of the model provides significant opportunities to support digital construction in the IKN project, although several challenges remain regarding digital quality system integration, human resource readiness, and stakeholder coordination.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | Total Quality Management (TQM), Building Information Modeling (BIM), Teknologi 4.0, Lean Management, Pengelolaan Mutu Proyek Konstruksi, Total Quality Management (TQM), Building Information Modelling (BIM), Industry 4.0 Technology, Lean Management, Construction Project Quality Management. |
| Subjects: | T Technology > T Technology (General) > T55 Industrial Safety T Technology > T Technology (General) > T56.8 Project Management T Technology > T Technology (General) > T58.6 Management information systems |
| Divisions: | Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT) |
| Depositing User: | Faradiba Dwi Hernita |
| Date Deposited: | 01 Jul 2026 01:00 |
| Last Modified: | 01 Jul 2026 01:00 |
| URI: | http://repository.its.ac.id/id/eprint/134163 |