“Perhitungan Biaya Dan Waktu Pelaksanaan Pembangunan Apartement The Grand Stand Surabaya Lantai 12-26 Dengan Metode Bekisting Aluminium Formwork Serta Penggunaan Aplikasi Bim (Revit)”

Nugroho, Achmad Syauqi Laksono (2022) “Perhitungan Biaya Dan Waktu Pelaksanaan Pembangunan Apartement The Grand Stand Surabaya Lantai 12-26 Dengan Metode Bekisting Aluminium Formwork Serta Penggunaan Aplikasi Bim (Revit)”. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111810010012-Undergraduate_Thesis.pdf] Text
10111810010012-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (22MB) | Request a copy

Abstract

Dalam Proyek Akhir yang berjudul “Perhitungan Biaya dan Waktu Pelaksanaan Pembangunan Apartement The Grand Stand Surabaya Lantai 12-26 dengan Metode Bekisting Aluminium Formwork serta Penggunaan Aplikasi Bim (Revit)”, objek bangunan yang ditinjau adalah Apartement The Grand Stand Surabaya berlokasi di Jl. Raya Darmo Permai Selatan No. 90, Surabaya. Gedung ini terdiri dari 4 lantai parkir, 1 lantai podium parkir, 1 lantai lobi, 1 lantai fasilitas umum, 22 lantai hunian, dan 1 lantai atap. Proyek ini memiliki luas lahan 4.781,58 m2 dan luas bangunan 1063,68 m2. Berdasarkan metode pelaksanaan pada proyek eksisting pembangunan Apartement The Grand Stand Surabaya, metode bekisting yang digunakan adalah bekisting konvensional. Namun, dalam proyek akhir ini metode yang digunakan untuk perhitungan kembali adalah metode bekisting aluminium formwork. Metode ini dipilih karena bangunan mempunyai lantai yang tipikal sehingga metode ini cocok untuk digunakan. Bekisting ini dapat digunakan kembali mulai dari 150 – 200 kali sehingga dapat mengurangi pengeluaran biaya yang dibutuhkan untuk membeli bahan bekisting serta dengan bentuk bekisting yang menyerupai puzzle mempermudah pemasangan sehingga dapat mempercepat pelaksanaan. Penyusunan proyek akhir ini dimulai dengan menyusun item pekerjaan, menyusun metode pelaksanaan, menghitung volume secara manual menggunakan aplikasi excel serta aplikasi Autodesk Revit sebagai pembanding antara kedua metode. Perhitungan tersebut untuk menentukan kebutuhan sumber daya, menghitung produktivitas, dan durasi item pekerjaan yang selanjutnya digunakan untuk menyusun penjadwalan. Dalam menyusun penjadwalan digunakan Precedence Diagram Method dengan penggunaan aplikasi Microsoft Project. Hasil dari analisa perhitungan dengan menggunakan metode bekisting aluminium formwork diperoleh total waktu pelaksanaan selama 240 hari kerja serta biaya pelaksanaan sebesar Rp 20.138.703.500,00. Sedangkan perbedaan hasil perhitungan secara manual dan perhitungan secara BIM (Revit) dari segi biaya selisih sebesar 1,8 % yaitu Rp. 325.738.776,00.
==============================================================================================================================
In the Final Project entitled "Calculation of Cost and Implementation Time for The Grand Stand Surabaya Apartment Development Floor 12-26 with Aluminum Formwork Method and Use of Bim Application (Revit)", the object of the building being reviewed is The Grand Stand Surabaya Apartment located on Jl. Raya Darmo Permai Selatan No. 90, Surabaya. This building consists of 4 parking floors, 1 parking podium floor, 1 lobby floor, 1 public facilities floor, 22 residential floors, and 1 roof floor. This project has a land area of 4,781.58 m2 and a building area of 1063.68 m2. Based on the implementation method in the existing project of The Grand Stand Surabaya Apartment development, the formwork method used is conventional formwork. However, in this final project the method used for recalculation is the aluminum formwork method. This method was chosen because the building has a typical floor so this method is suitable for use. This formwork can be reused from 150-200 times so that it can reduce the costs needed to buy formwork materials and the formwork shape that resembles a puzzle makes installation easier so that it can speed up implementation. The preparation of this final project begins with compiling work items, developing implementation methods, calculating volume manually using the excel application and the Autodesk Revit application as a comparison between the two methods. These calculations are to determine resource requirements, calculate productivity, and the duration of work items which are then used to arrange scheduling. In preparing the schedule, Precedence Diagram Method is used with the use of the Microsoft Project application. The results of the calculation analysis using the aluminum formwork method obtained a total implementation time of 240 working days and an implementation cost of Rp. 20,015,471,300,00. While the difference in the results of manual calculations and calculations by BIM (Revit) in terms of cost the difference is 1.8%, namely Rp. 325,738,776,00.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Estimasi Biaya, Estimasi Waktu, Bekisting Aluminium Formwork, Autodesk Revit, Penjadwalan, Microsoft Project. Cost Estimation, Time Estimation, Aluminum Formwork, Autodesk Revit, Scheduling, Microsoft Project.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Vocational > 22301-Civil Infrastructure Engineering (D4)
Depositing User: Mr. Marsudiyana -
Date Deposited: 10 Jul 2026 07:53
Last Modified: 13 Jul 2026 01:12
URI: http://repository.its.ac.id/id/eprint/134655