Analisis Biaya Dan Waktu Pelaksanaan Metode Alternatif Hollow Core Slab Pada Gedung Apartemen Grand Stand Surabaya

Tusadiyah, Shefina Yusmana (2022) Analisis Biaya Dan Waktu Pelaksanaan Metode Alternatif Hollow Core Slab Pada Gedung Apartemen Grand Stand Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111810010015-Undergraduate_Thesis.pdf] Text
10111810010015-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (20MB) | Request a copy

Abstract

Sistem beton pracetak merupakan salah satu alternatif metode konstruksi dalam perancangan struktur. Metode pracetak mulai banyak digunakan dalam konstruksi dikarenakan memiliki banyak kelebihan, diantaranya waktu pelaksanaan lebih cepat karena beton sudah keras, kualitas beton yang lebih terjamin karena kontrol mutu yang lebih baik, menjadikan tempat kerja lebih bersih, dan lebih produktif. Sistem pracetak untuk struktur pelat salah satunya adalah Hollow Core Slab, yaitu pelat pracetak pratekan yang terdapat rongga di dalamnya yang berguna untuk memperingan struktur. Penggunaan metode konvensional dalam proyek Apartemen Grand Stand menyebabkan biaya proyek yang cukup besar dan memerlukan bekisting kayu dengan volume yang cukup besar. Penyusunan proyek akhir terapan yang berjudul “Analisis Biaya dan Waktu Pelaksanaan Metode Alternatif Hollow Core Slab Pada Gedung Apartemen Grand Stand Surabaya” ini menggunakan data bangunan Gedung Apartemen Grand Stand Surabaya yang berlokasi di Jl. Raya Darmo Permai Selatan No. 90, Surabaya. Dalam proyek ini seluruh pekerjaan elemen struktur beton menggunakan metode cor konvensional (in situ). Sedangkan metode pelaksanaan yang digunakan dalam penyusunan proyek akhir terapan adalah dengan metode hollow core slab. Data yang ditinjau pada proyek akhir hanya struktur atas lantai 21 hingga lantai 30. Berdasarkan hasil analisis perhitungan dengan menggunakan bekisting sekali pakai diketahui waktu pelaksanaan proyek Apartemen Grand Stand Surabaya lantai 21-30 dengan metode alternatif hollow core slab mencapai 245 hari kerja dengan biaya total proyek sebesar Rp. 14,788,617,760.01. Sedangkan data perhitungan berdasarkan dokumen dari kontraktor untuk metode konvensional dengan lantai yang sama mencapai 247 hari kerja dengan biaya total proyek sebesar Rp. 14,108,921,393.67. Penggunaan hollow core slab bisa lebih ekonomis jika menggunakan bekisting 2-3 kali pakai. Biaya total dengan menggunakan bekisting 2-3 kali pakai adalah sebesar Rp. 12,388,437,000.00.
==============================================================================================================================
Precast concrete system is an alternative construction method in structural design. The precast method is starting to be widely used in construction because it has many advantages, including faster execution time because the concrete is hard, the quality of the concrete is more guaranteed due to better quality control, making the workplace cleaner, and more productive. One of the precast systems for slab structures is the Hollow Core Slab, which is a prestressed precast plate with a cavity inside which is useful for lightening the structure. The use of conventional methods in the Grand Stand Apartment project causes a fairly large project cost and requires a large volume of wood formwork. The preparation of the applied final project entitled "Analysis of Costs and Implementation Time of Alternative Hollow Core Slab Methods in the Grand Stand Surabaya Apartment Building" uses data from the Surabaya Grand Stand Apartment Building building located on Jl. Raya Darmo Permai Selatan No. 90, Surabaya. In this project all concrete structural elements work using the conventional cast method (in situ). While the implementation method used in the preparation of the applied final project is the hollow core slab method. The data reviewed in the final project is only the upper structure of the 21st floor to the 30th floor. Based on the results of the calculation analysis using single-use formwork, it is known that the implementation time of the Grand Stand Surabaya Apartment project on floors 21-30 with the alternative method of hollow core slab reaches 245 working days with a total project cost of Rp. 14,788,617,760.01. While the calculation data based on documents from the contractor for the conventional method with the same floor reached 247 working days with a total project cost of Rp. 14,108,921,393.67. The use of hollow core slabs can be more economical if the formwork is used 2-3 times. The total cost of using formwork 2-3 times is Rp. 12,388,437,000.00.

Item Type: Thesis (Diploma)
Additional Information: RSIS 692.5 Tus a-1 2022
Uncontrolled Keywords: Project Execution Time, Cost Calculation, Schedulling, and Hollow Core Slab. Waktu, Biaya Pelaksanaan, Penjadwalan, dan Hollow Core Slab.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Vocational > 22301-Civil Infrastructure Engineering (D4)
Depositing User: Mr. Marsudiyana -
Date Deposited: 10 Jul 2026 08:43
Last Modified: 13 Jul 2026 01:11
URI: http://repository.its.ac.id/id/eprint/134665

Actions (login required)

View Item View Item