Alternatif Perencanaan Dinding Penahan Tanah Pada Proyek Jalan Lintas Selatan Lot 7 Blitar Sta 12+025 – 12+109

Widiharsono, Enricho Sony (2022) Alternatif Perencanaan Dinding Penahan Tanah Pada Proyek Jalan Lintas Selatan Lot 7 Blitar Sta 12+025 – 12+109. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111810010032-Undergraduate_Thesis.pdf] Text
10111810010032-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (23MB) | Request a copy

Abstract

Proyek pembangunan Jalan Lintas Selatan (JLS) LOT 7 adalah proyek jalan nasional yang menghubungkan Desa Tambakrejo dan Desa Serang Kabupaten Blitar sepanjang 12,625 km. Geometri Jalan Lintas Selatan LOT 7 direncanakan akan memotong daerah perbukitan, sehingga dalam proses pembangunannya diperlukan pekerjaan galian dan timbunan. Salah satu pekerjaan galian adalah pada STA 12+025 – 12+109, yang pada akhirnya membentuk lereng tegak setinggi 4 m pada sisi bagian kanan dan kiri jalan sehingga direncakan pembangunan dinding penahan tanah bertipe gravity. Material dari dinding penahan tanah tipe gravity adalah beton f’c 20 MPa secara menyeluruh pada bagian dinding dengan dimensi ketinggian total mencapai 4,5 m dan lebar footing mencapai 2,5 m. Pada proyek akhir ini direncanakan tiga alternatif desain dinding penahan tanah untuk kondisi lereng seperti pada STA 12+025 – 12+109 yaitu gabion wall, crib wall dan soil nailing yang kemudian akan dibandingkan dari segi biaya material dan metode pelaksanaan pekerjaan. Pada Proyek ini analisis dilakukan dengan dua cara yaitu analisis secara manual dan analisis menggunakan program bantu. Untuk metode stabilitas lereng yang digunakan adalah metode Bishop dan metode Fellenius. Persyaratan yang digunakan mengacu pada SNI 8640:2017 tentang Persyaratan Perancangan Geoteknik. Analisis stabilitas lereng menggunakan program bantu FEM (Finite Element Method) yaitu Plaxis 8.6 dan LEM (Limit Equilibrium Method) yaitu GEO5. Hasil analisis untuk lereng dengan perkuatan dinding penahan tanah tipe gravity memiliki nilai safety factor rata-rata 2,6, dengan biaya material yang dikeluarakan untuk pembangunan sebesar Rp651,017,720.79. Kemudian, hasil analisis untuk perencanaan lereng dengan perkuatan Gabion Wall memiliki nilai safety factor rata-rata 1,6, dengan biaya material yang dikeluarkan untuk pembangunan sebesar Rp343,588,000.00. Selanjutnya, hasil analisis untuk perencanaan lereng dengan perkuatan Crib Wall memiliki nilai safety factor rata-rata 1,5, dengan biaya material yang dikeluarkan untuk pembangunan sebesar Rp216,848,000.00. Sedangkan, hasil analisis untuk perencanaan lereng dengan perkuatan Soil Nailing memiliki nilai safety factor rata-rata 2,1, dengan biaya material yang dikeluarkan untuk pembangunan sebesar Rp321,021,792.00. Dari hasil analisis diatas maka dinding penahan tanah yang paling ekonomis dari segi biaya materialnya adalah dinding penahan tanah tipe Crib Wall, dan dinding penahan tanah dengan metode pelaksanaan pekerjaan yang lebih mudah dan efisien adalah dinding penahan tanah tipe Crib Wall.
==============================================================================================================================
Trans South Java Roads (JLS) LOT 7 construction project is a national road project that connects Tambakrejo Village and Serang Village, Blitar Regency with a length of 12,625 km. The geometry of the Southern Cross Road LOT 7 is planned to cut the hilly area, so that in the construction process excavation and embankment work is needed. One of the excavation works was at STA 12+025 – 12+109, which in the end formed a 4 m high vertical slope on the right and left sides of the road, so it is planned to build a gravity type retaining wall. The material of the gravity type retaining wall is concrete f'c 20 MPa as a whole on the wall with a total height dimension of 4.5 m and a footing width of 2.5 m. In this final project, three alternative retaining wall designs are planned for slope conditions such as in STA 12+025 – 12+109, namely gabion wall, crib wall and soil nailing which will then be compared in terms of material costs and work implementation methods. In this project, analysis is carried out in two ways, manual analysis and analysis using auxiliary programs. For the slope stability method used is the Bishop method and the Fellenius method. The requirements used refer to SNI 8640:2017 concerning Geotechnical Design Requirements. Analysis of slope stability using the FEM (Finite Element Method) program, namely Plaxis 8.6 and LEM (Limit Equilibrium Method), namely GEO5. The results of the analysis for slopes with gravity type retaining walls have an average safety factor value of 2.6, with the material costs incurred for construction of Rp651,017,720.79. Then, the results of the analysis for slope planning with Gabion Wall reinforcement have an average safety factor value of 1.6, with material costs incurred for construction of Rp. 343,588,000.00. Furthermore, the results of the analysis for slope planning with Crib Wall reinforcement have an average safety factor value of 1.5, with the material costs incurred for construction of Rp. 216.848.000.00. Meanwhile, the results of the analysis for slope planning with Soil Nailing reinforcement have an average safety factor value of 2.1, with the material costs incurred for construction of Rp. 321,021,792.00. From the results of the analysis above, the most economical retaining wall in terms of material costs is the retaining wall of the Crib Wall type, and the retaining wall with an easier and more efficient method of carrying out the work is the Crib Wall type retaining wall.

Item Type: Thesis (Diploma)
Additional Information: RSIS 624.164 Wid a-1 2022
Uncontrolled Keywords: Stabilitas Lereng, Gravity Retaining Wall, Gabion Wall, Crib Wall,Soil Nailing, Plaxis, GEO5. Slope Stability, Gravity Retaining Wall, Gabion Wall, Crib Wall,Soil Nailing, Plaxis, GEO5.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Vocational > 22301-Civil Infrastructure Engineering (D4)
Depositing User: Mr. Marsudiyana -
Date Deposited: 13 Jul 2026 03:17
Last Modified: 13 Jul 2026 03:17
URI: http://repository.its.ac.id/id/eprint/134767

Actions (login required)

View Item View Item