Alimsyah, Fahrizal (2022) Analisis Estimasi Waktu Dan Biaya Berdasarkan Quantity Take- Off Menggunakan Metode Konvensional Dan Pengaplikasian Bim Pada Proyek Pembangunan Gedung 9 Lantai, Rumah Sakit Universitas Surabaya, Tenggilis Mejoyo. Diploma thesis, Institut Teknologi Sepuluh Nopember.
|
Text
10111810013072-Undergraduate_Thesis.pdf Restricted to Repository staff only Download (15MB) | Request a copy |
Abstract
Pesatnya perkembangan yang terjadi dalam dunia konstruksi dikarenakan sektor ini merupakan bagian yang penting dalam pembangunan suatu negara. Building Information Modelling (BIM) dapat memodelkan struktur, arsitek, dan MEP dalam satu kesatuan dengan konsep Virtual Building. Dalam tahap pra-konstruksi sebuah proyek, BIM dipercaya mampu untuk mempercepat proses konstruksi. Selain itu, BIM juga mampu untuk mengefisienkan biaya dan waktu yang digunakan pada konstruksi sebuah proyek. Quantity Take-Off merupakan salah satu upaya dari kontraktor dengan melakukan perhitungan volume, yang nantinya akan digunakan sebagai bahan untuk menyusun BoQ dalam tender dan nantinya juga dijadikan bahan untuk melakukan pengadaan material konstruksi. Metode dalam penelitian ini dilakukan dengan dua metode. Metode pertama yaitu dengan memodelkan gedung menggunakan BIM. Pemodelan Gedung dilakukan dengan dengan permodelan struktur. Output dari permodelan ini adalah volume tiap pekerjaan. Setelah itu baru akan muncul juga metode kedua yakni metode perhitungan konvensional. Metode konvensional membutuhkan bantuan Autocad dan Microsoft Excel. Selanjutnya dari dua metode itu akan didapatkan volume kebutuhan beton dan tulangan. Setelah itu dilanjutkan dengan perhitungan produktivitas. Dilanjutkan dengan melakukan perhitungan biaya dan rencana anggaran pelaksanaan. Setelah itu, akan dibuat Kurva S untuk menyusun waktu pekerjaan konstruksi. Dari kedua metode tersebut dibandingkan mana metode yang lebih efektif dan efisien. Dalam tugas akhir ini akan didapatkan bahwa perencanaan proyek menggunakan BIM lebih murah dan cepat dalam pelaksanaannya sebesar 1,36 % dalam segi biaya dan 1,20 % dari segi durasi dengan rincian total biaya sebesar Rp 53.961.000.000,00 dan waktu selama 496 hari. Dibandingkan dengan metode konvensional dengan total biaya sebesar Rp 54.709.000,00 dan waktu selama 502 hari. Perbedaan keduanya sebesar 5,81 % untuk beton, dan 6,72 % untuk kebutuhan tulangan yang menjadi dasar mengapa penggunaan BIM lebih murah dan cepat. Akan tetapi pengaplikasian BIM memerlukan ketelitian dan ketekunan dalam perencanannya, apalagi dengan gedung yang memiliki kekompleksan yang tinggi.
==============================================================================================================================
The rapid development that occurs in the construction world is because this sector is an important part in the development of a country. Building Information Modeling (BIM) can model structures, architects, and MEP in a single unit with the Virtual Building concept. In the pre-construction stage of a project, BIM is believed to be able to speed up the construction process. In addition, BIM is also able to streamline the costs and time used in the construction of a project. Quantity Take-Off is one of the contractors' efforts to calculate volume, which will later be used as material for preparing the BoQ in the tender and will also be used as material for procuring construction materials. The method in this study was carried out by two methods. The first method is to model the building using BIM. Building modeling is done by using the structure modeling. The output of this model is the volume of each job. After that, the second method will also appear, namely the conventional calculation method. This conventional method requires the help of Autocad and Microsoft Excel. Furthermore, from the two methods, the required volume of concrete and reinforcement will be obtained. After that, we will proceed to the calculation of productivity. Then proceed with calculating costs and implementing budget plans. After that, an S Curve will be created to arrange the construction work time. Of the two methods will be compared which method is more effective and efficient. In this final project, it will be found that project planning using BIM is cheaper and faster in its implementation by 1,36% in terms of cost and 1,20% in terms of duration with details of the total cost of Rp. 53.961.000.000,00 and time of 496 days. Compared with the conventional method with a total cost of Rp. 54.709.000,00 and a time of 502 days. The difference between the two is 5,81% for concrete, and 6,72% for reinforcement requirements, which is the basis why BIM is cheaper and faster. However, the application of BIM requires accuracy and diligence in planning, especially with buildings that have high complexity.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Produktivitas, Volume, Quantity Take-Off, Konvensional, Building Information Modelling (BIM). Productivity, Volume, Quantity Take-Off, Conventional, Building Information Modelling (BIM) |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Vocational > 22301-Civil Infrastructure Engineering (D4) |
| Depositing User: | Mr. Marsudiyana - |
| Date Deposited: | 14 Jul 2026 07:47 |
| Last Modified: | 14 Jul 2026 07:47 |
| URI: | http://repository.its.ac.id/id/eprint/134926 |
Actions (login required)
![]() |
View Item |
