PERENCANAAN ANGKUTAN BUS KORIDOR SURABAYA – SIDOARJO ( LEWAT JALAN AHMAD YANI )

IDETYAWAN, DANANG (2015) PERENCANAAN ANGKUTAN BUS KORIDOR SURABAYA – SIDOARJO ( LEWAT JALAN AHMAD YANI ). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
3112105030-Undergraduate_theses.pdf - Published Version
Restricted to Repository staff only

Download (2MB) | Request a copy

Abstract

Transportasi merupakan suatu kegiatan atau proses perpindahan orang atau barang. Kegiatan tersebut tentunya menghasilkan rute perjalanan dari asal menuju ke tujuan yang akan ditempuh. Dalam memenuhi pemindahan tersebut maka diperlukan adanya alat yang dapat memenuhi kebutuhan, akan perpindahan orang atau barang tersebut. Dalam kodisi jalur existing perencanaan didominasi oleh bis hijau, bison, dan mikrolet. Dikarenakan dalam satu jalur di dominasi oleh tiga jenis alat transportasi timbullah suatu keruwetan disaat menaikkan dan menurunkan penumpang. Ketiga alat transportasi tersebut berebut dalam hal diatas, dan pada akhirnya menghambat jalannya lalu lintas disekitar area penjemputan atau penurunan penumpang. Dengan adanya latar belakang diatas maka, Bagaimanakah Operasional angkutan Bus tersebut pada awal tahun rencana yaitu dilihat dari, Pembebanan, Frekuensi dan Headway koridor Surabaya – Sidoarjo ( lewat Jl. Ahmad Yani ) dan, bagaimanakah Operasional angkutan Bus tersebut setelah dilakukan forcest selama 5 dan 10 tahun rencana kedepan dilihat dari, Pembebanan, Frekuensi dan Headway. Untuk menentukan tujuan tersebut diatas digunakan analisa demand penumpang dari data survey lapangan yang diolah dengan kalibrasi occupancy analisa forecasting demand penumpang dengan cara Furness model menggunakan Perencanaan dan Pemodelan Transportasi Ofyar, Z Tamin. , analisa kapasitas kendaraan menggunakan Urban Public Transportation System and Technology. Vuchic, Vukan R, frekuensi, dan headway yang terjadi. Hasil perhitungan perencanaan Operasional awal tahun 2014 dan setelah dilakukan forcest selama 5, 10 tahun rencana kedepan. Dengan panjang rute 30 km, dibutuhkan 26 bus standart dengan kapasitas 65 (enam puluh lima) penumpang, headway 4 menit, dan frekuensi 16. ============================================================ Transportation is an activity or process of moving people or goods. These activities would generate travel route from origin to destination will be reached. In fulfilling its removal is necessary to have a tool that can meet the requirements, will be the movement of people or goods. In planning the existing line Events dominated by green bus, bison, and microbus. Due in one lane dominated by three types of transportation arises a complexity while raising and lowering the passenger. The third means of transportation scramble in the above, and ultimately impede the course of the traffic around the area of pick-up or drop in passengers. With the above background,, How The bus transport operations in the early years of the plan is viewed from, imposition, Frequency and Headway corridor Surabaya - Sidoarjo (via Jl. Ahmad Yani) and, how the bus transport operations after forcest for 5 and 10 year plan views of the future, Charging, Frequency and Headway. To determine the purpose of the above used passenger demand analysis of survey data were processed with the calibration field occupancy passenger demand forecasting analysis by means Furness model uses Transport Planning and Modeling Ofyar, Z Tamin. , Analysis using the vehicle capacity of Urban Public Transportation System and Technology. Vuchic, Vukan R, frequency, and the headway that happen. Operational planning calculation results beginning in 2014 and after forcest for 5, 10-year plan ahead. With a route length of 30 km, it takes 26 bus standard with a capacity of 65 (sixty-five) passengers, headway 4 minutes, and the frequency of 16.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 388.413 Ide p
Uncontrolled Keywords: Perencanaan Angkutan, Koridor Surabaya - Sidoarjo, Moda.
Subjects: T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > (S1) Undergraduate Theses
Depositing User: Mrs Anis Wulandari
Date Deposited: 06 Jan 2017 04:15
Last Modified: 06 Jan 2017 04:15
URI: http://repository.its.ac.id/id/eprint/1355

Actions (login required)

View Item View Item