Perancangan SCADA Proses Kanal Konektor Hingga Pompa Distribusi Pada Instalasi Pengolahan Air Minum (IPAM) Karang Pilang 3 PDAM Surabaya

Dwi Firmansyah, Dimas (2026) Perancangan SCADA Proses Kanal Konektor Hingga Pompa Distribusi Pada Instalasi Pengolahan Air Minum (IPAM) Karang Pilang 3 PDAM Surabaya. Project Report. [s.n.]. (Unpublished)

[thumbnail of 2042221050-Project_Report.pdf] Text
2042221050-Project_Report.pdf - Accepted Version
Restricted to Repository staff only

Download (5MB) | Request a copy

Abstract

Pemantauan distribusi air di Instalasi Pengolahan Air Minum (IPAM) Karangpilang 3 memerlukan antarmuka pemantauan cadangan (redundancy HMI) di tingkat lokal. Laporan ini membahas perancangan sistem Supervisory Control and Data Acquisition (SCADA) pendukung berbasis LabVIEW untuk area kanal konektor hingga stasiun pompa distribusi. Sistem ini mengakuisisi parameter ketinggian air (level), tekanan (pressure), dan kelistrikan pompa (power meter) menggunakan protokol Modbus TCP/IP. Karena pembatasan akses data lapangan, pengujian menggunakan kombinasi data aktual dan simulasi. Selain visualisasi real-time, sistem ini mengintegrasikan database SQLite untuk otomasi perekaman data (data logging) dan analisis tren masa lampau (historical data). Hasil pengujian sistem secara kontinu selama 6 jam menunjukkan bahwa seluruh data instrumen berhasil divisualisasikan dan direkam dengan sangat stabil tanpa kegagalan transmisi. SCADA LabVIEW ini terbukti andal sebagai sistem pendukung lokal untuk mempermudah evaluasi efisiensi operasional distribusi air secara prediktif.
=================================================================================================================================
Monitoring water distribution at the Karangpilang 3 Drinking Water Treatment Plant (IPAM) requires a backup monitoring interface (HMI redundancy) at the local level. This report discusses the design of a LabVIEW-based Supervisory Control and Data Acquisition (SCADA) support system for the area from the connector canal to the distribution pump station. This system acquires water level, pressure, and pump power meter parameters using the Modbus TCP/IP protocol. Due to field data access restrictions, testing utilized a combination of actual data and simulations. In addition to real-time visualization, the system integrates a SQLite database for automated data logging and historical trend analysis. Continuous system testing over a 6-hour period demonstrated that all instrument data was successfully visualized and recorded with high stability and no transmission failures. This LabVIEW SCADA system has proven reliable as a local support system to facilitate predictive evaluation of water distribution operational efficiency. Monitoring water distribution at the Karangpilang 3 Drinking Water Treatment Plant (IPAM) requires a redundant monitoring interface (HMI redundancy) at the local level. This report discusses the design of a LabVIEW-based Supervisory Control and Data Acquisition (SCADA) support system for the area from the connector canal to the distribution pump station. This system acquires parameters for water level, pressure, and pump electrical parameters.

Item Type: Monograph (Project Report)
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD233 Water consumption
T Technology > TD Environmental technology. Sanitary engineering > TD259.2 Drinking water. Water quality
T Technology > TD Environmental technology. Sanitary engineering > TD395 Reservoirs (water supply)
T Technology > TD Environmental technology. Sanitary engineering > TD433 Water treatment plants
Divisions: Faculty of Vocational > Instrumentation Engineering
Depositing User: Dimas Dwi Firmansyah
Date Deposited: 29 Jul 2026 08:34
Last Modified: 29 Jul 2026 08:34
URI: http://repository.its.ac.id/id/eprint/139208