Putri Kinanti, Aisyah (2026) Rekomendasi Instrumen Berbasis Rcfa dan Kpi Guna Optimalisasi Sistem Monitoring Level pada Demineralized Storage Tank PT. PLN NP UP Paiton Unit 1 2. Project Report. [s.n.]. (Unpublished)
|
Text
2042221024-Project_Report.pdf Restricted to Repository staff only Download (6MB) | Request a copy |
Abstract
Water Treatment Plant (WTP) berperan penting dalam menyediakan air demineralisasi sebagai air make-up pada siklus air dan uap pada Pembangkit Listrik Tenaga Uap (PLTU). Salah satu komponen utama dalam sistem ini adalah Demineralized Storage Tank (DST) yang memerlukan pemantauan level guna menjaga ketersediaan air dan mencegah overflow. Namun pada kondisi saat ini di PLN Nusantara Power UP Paiton Unit 1 & 2, pemantauan level DST masih menggunakan pressure gauge yang menginterpretasikan pressure sebagai level, dimana pressure gauge sendiri memerlukan observasi rutin secara manual sehingga overflow masih seringkali terjadi di jam sela observasi sehingga menimbulkan kerugian air. Penelitian ini merekomendasikan penggunaan Differential Pressure Transmitter (DPT) sebagai solusi pemantauan level secara kontinu. Alur masalah dianalisa dengan Root Cause Failure Analysis 5 Why 1 Solution dan pemilihan instrumen dilakukan dengan membandingkan beberapa alternatif berdasarkan aspek biaya, safety, dan instalasi menggunakan metode Key Performance Indicator (KPI). Hasil analisis menunjukkan bahwa DPT memperoleh nilai akhir KPI tertinggi sebesar 0.878, sehingga dapat direkomendasikan sebagai solusi untuk meningkatkan keandalan pemantauan level dan meminimalkan potensi overflow pada sistem WTP.
====================================================================================================================================
Water Treatment Plants (WTPs) play a crucial role in supplying demineralized water as makeup water for the water and steam cycle at coal-fired power plants (PLTU). One of the key components in this system is the Demineralized Storage Tank (DST), which requires level monitoring to ensure water availability and prevent overflow. However, under current conditions at PLN Nusantara Power UP Paiton Units 1 & 2, DST level monitoring still relies on pressure gauges that interpret pressure as level, and since these pressure gauges require routine manual observation, overflows frequently occur during the intervals between observations, resulting in water loss. This study recommends the use of a Differential Pressure Transmitter (DPT) as a solution for continuous level monitoring. The problem flow was analyzed using the Root Cause Failure Analysis 5 Why 1 Solution method, and instrument selection was conducted by comparing several alternatives based on cost, safety, and installation aspects using the Key Performance Indicator (KPI) method. The analysis results show that the DPT achieved the highest final KPI score of 0.878, making it the recommended solution for improving the reliability of level monitoring and minimizing the potential for overflow in the WTP system.
| Item Type: | Monograph (Project Report) |
|---|---|
| Uncontrolled Keywords: | Water Treatment Plant, Monitoring, Key Performance Indicator |
| Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3070 Automatic control T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK7878 Electronic instruments |
| Divisions: | Faculty of Vocational > Instrumentation Engineering |
| Depositing User: | Aisyah Putri Kinanti |
| Date Deposited: | 04 Aug 2026 07:18 |
| Last Modified: | 04 Aug 2026 07:18 |
| URI: | http://repository.its.ac.id/id/eprint/143714 |