Hidayat, Noor (2005) Studi Analisis Terhadap Estimasi Biaya Dan Usaha Proyek Pengembangan Aplikasi Produksi Minyak Di PT Caltex Pacific Indonesia. Masters thesis, Institut Teknologi Sepuluh Nopember.
|
Text
9103205822-Master_Thesis.pdf Restricted to Repository staff only Download (9MB) |
Abstract
Proyek pengembangan aplikasi-aplikasi yang digunakan dalam bisnis produksi minyak di PT Caltex Pacific Indonesia (PT CPI) mengacu pada metode Chevron-Texaco Project Development and Execution Process (CPDEP). Metode ini sebenarnya dikembangkan sebagai kerangka manajemen proyek secara umum di ChevronTexaco. Walaupun penerapannya untuk bidang Teknologi Informasi (TI) memerlukan beberapa penyesuaian sehingga disebut CPDEP for IT, dalam pelaksanaannya timbul beberapa kendala karena metode ini tidak menyediakan beberapa proses dan alat spesifik yang dibutuhkan dalam manajemen proyek pengembangan sebuah aplikasi komputer. Masalah yang paling mengemuka adalah estimasi usaha proyek (project effort) dan jadwal proyek (project schedule) yang disebabkan oleh tidak digunakannya proses dan alat yang mempunyai dasar serta metode yang baku. Dalam tesis ini, akan dilakukan analisis terhadap estimasi biaya dan usaha proyek pengembangan aplikasi produksi minyak di PT CPI yang memakai manajemen proyek CPDEP for IT sebagai dasar metodologi pengembangan aplikasi. Beberapa kendala yang dihadapi saat ini dengan pemakaian metodologi tersebut antara lain tidak akuratnya hasil estimasi, tidak adanya landasan perhitungan estimasi yang baku, tidak adanya konsistensi hasil estimasi untuk proyek dengan ukuran yang hampir sama, dan lain-lain. Untuk mengatasi kendala tersebut, disarankan untuk menggunakan model COCOMO II dalam perhitungan estimasi. Model COCOMO II ini diusulkan karena model ini sudah terbukti (proven), dapat memperhitungkan faktor lokal (localized), serta dapat dikalibrasi (calibrated) terhadap proyek-proyek lokal. Salah satu faktor lokal yang diperhitungkan dalam model COCOMO II ini adalah Capability Maturity Model (CMM). Oleh karena itu, dalam tesis ini juga akan dianalisis tingkat kematangan (CMM Level) dari organisasi IT di PT CPI. Selain analisis ini diperlukan dalam proses kalibrasi model COCOMO II, hasilnya juga dapat digunakan sebagai landasan untuk perbaikan tingkat kematangan, yaitu untuk mencapai tingkat kematangan yang lebih tinggi (higher CMM level). Akurasi dalam melakukan estimasi usaha dan jadwal proyek yang dibutuhkan dalam pengembangan aplikasi di PT CPI sangatlah penting. Hal ini sangat berkaitan dengan pengelolaan sumber daya manusia, karena cukup banyak pengembangan aplikasi yang dilakukan oleh PT CPI secara internal (in-house). Semakin akurat tingkat estimasi, maka semakin baik pula pengelolaan sumber daya manusia secara keseluruhan dalam portofolio proyek pengembangan aplikasi yang cukup banyak di PT CPI.
==================================================================================================================================
The project framework for application development used in oil production operations at PT Caltex Pacific Indonesia (PT CPI) refers to the Chevron-Texaco Project Development and Execution Process (CPDEP) methodology. This method was originally developed as a framework for general project management within ChevronTexaco. Although its implementation for Information Technology (IT) required some customization—resulting in what is called CPDEP for IT—in actual use, it raises some difficulties because the method does not provide specific tools and processes required in the management of computer application development projects. The most prominent issue concerns the estimation of project effort and project schedule, which are caused by the use of non-standard tools and processes. In this thesis, an analysis is conducted on the project cost and effort estimation of oil production application development at PT CPI that uses CPDEP for IT as its application development methodology framework. Several issues are faced today when using this methodology, such as inaccurate estimation results, no standard foundation for calculating estimates, inconsistent estimation results for projects of about the same size, and others. To overcome these issues, it is suggested to use the COCOMO II model for calculating estimations. This model is proposed because it is proven, can accommodate local factors, and can be calibrated to local projects. One of the local factors considered in the COCOMO II model is the Capability Maturity Model (CMM). Therefore, this thesis will also analyze the CMM level of the IT organization at PT CPI. Besides being needed in the process of calibrating the COCOMO II model, the results can also be used as the foundation for maturity level improvement to achieve a higher CMM level. The accuracy in estimating project effort and schedule is an important aspect needed in application development at PT CPI. This is closely related to human resource management since a large number of application developments are conducted in-house by PT CPI. The more accurate the estimation, the better the overall human resource management for the substantial portfolio of application development projects at PT CPI.
| Item Type: | Thesis (Masters) |
|---|---|
| Additional Information: | RTMT 658.404 Hid s |
| Uncontrolled Keywords: | manajemen proyek, pengembangan aplikasi, Capability Maturity Model (CMM), usaha proyek, jadwal proyek, COCOMO II, project management, application development, Capability Maturity Model (CMM), project effort, project schedule, COCOMO II. |
| Subjects: | T Technology > T Technology (General) > T56.8 Project Management |
| Divisions: | Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT) |
| Depositing User: | magang . |
| Date Deposited: | 16 Sep 2026 08:45 |
| Last Modified: | 16 Sep 2026 08:45 |
| URI: | http://repository.its.ac.id/id/eprint/144586 |