Harlianto, Pramudyana Agus (2006) Analisis Dan Desain Sistem Pendukung Keputusan Operasional Stasiun Pengumpul Pusat X. Masters thesis, Institut Teknologi Sepuluh Nopember.
|
Text
9103205826-Master_thesis.pdf Restricted to Repository staff only Download (46MB) |
Abstract
Stasiun Pengumpul Pusat X (SPP X) merupakan salah satu fasilitas produksi di permukaan tanah (surface production facility) yang berfungsi untuk mengumpulkan fluida dari sumur minyak, memisahkan air dari minyak, membersihkan air, dan melunakkan air. Data operasional SPP sudah dikelola oleh Software SPP. Software SPP ini masih terbatas pada pengelolaan data dan belum mengubah data menjadi informasi yang dapat digunakan untuk mendukung pengambilan keputusan. Di dalam tesis ini dilakukan analisis kebutuhan dan desain terhadap sistem pendukung keputusan operasional SPP X. Analisis dan desain dilakukan dengan menggunakan metode terstruktur. Hasil penelitian menunjukkan bahwa pengguna sistem pendukung keputusan ini terdiri atas 4 (empat) kelompok pengguna, yaitu Operator, Group Leader/Process Specialist, Facility Engineer, dan Pimpinan Team (Team Leader/Team Manager). Kebutuhan pengguna sudah berhasil didefinisikan. Data Flow Diagram sudah dibuat sampai dengan level 2. Desain perangkat lunak sudah berhasil dikerjakan, mencakup desain data, desain arsitektur, dan desain antarmuka. Terdapat 3 (tiga) tabel utama, yaitu 'tabel meter', 'tabel rekaman bacaan meter', dan 'tabel operator'. Arsitektur perangkat lunak memiliki jumlah nodes 37, kedalaman 7, dan lebar 15. Berdasarkan COCOMO II, waktu yang diperlukan untuk implementasi adalah 14,55 bulan, dengan biaya US$ 135.835 (asumsi, biaya manpower adalah US$ 1.000/bulan).
==================================================================================================================================
Central Gathering Station X (CGS X) is a surface production facility used to gather production fluid, separate oil from water, clean water, and soften water. CGS Software is a tool for managing operational data, but its functionality is still limited to data management. The software has no capability to convert data into information to support the decision-making process. This research is concerned with the analysis and design of a decision support system for CGS X operations. A structured method was selected for the analysis and design. In conclusion, there are 4 (four) user clusters: Operator, Group Leader/Process Specialist, Facility Engineer, and Team Leader/Team Manager. User requirements have been defined. Level 0, 1, and 2 of the Data Flow Diagram have been developed. Software design has been completed, including data design, architecture design, and user interface design. There are 3 (three) major tables: 'Meter table', 'Meter Reading Record table', and 'Operator table'. The software architecture has 37 nodes, a depth of 7, and a width of 15. Based on COCOMO II, the implementation phase will take 14.55 months and cost US$ 135,835 (assumption: manpower cost is US$ 1,000/month).
| Item Type: | Thesis (Masters) |
|---|---|
| Additional Information: | RTMT 658.403 Har a |
| Uncontrolled Keywords: | Analisis dan Desain~ Sistem Pendukung Keputusan, Operasional SPP X, Analysis & design, decision support system, CGS X Operation |
| Subjects: | T Technology > T Technology (General) > T58.62 Decision support systems |
| Divisions: | Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT) |
| Depositing User: | magang . |
| Date Deposited: | 17 Sep 2026 01:26 |
| Last Modified: | 17 Sep 2026 01:26 |
| URI: | http://repository.its.ac.id/id/eprint/144591 |