Laksana, Ambudi Putra (2009) Penentuan Prioritas Perawatan Gedung Produksi Biskuit (Studi Kasus PT Garudafood Putra Putri Java Biscuits Division Gresik). Masters thesis, Institut Teknologi Sepuluh Nopember.
|
Text
9107202901-Master_thesis.pdf Restricted to Repository staff only Download (15MB) |
Abstract
Perawatan bangunan merupakan salah satu kegiatan penting yang menjadi satu kesatuan dalam proses produksi. Hal ini dikarenakan tanpa adanya kondisi bangunan yang baik, proses produksi tidak akan berjalan sesuai harapan. Kegiatan perawatan bangunan salah satunya bertujuan untuk menjaga dan mempertahankan kondisi bangunan beserta elemen, bahan, dan peralatan di dalamnya sehingga berfungsi maksimal sesuai dengan yang telah ditentukan. Perawatan bangunan di PT Garudafood Putra Putri Jaya Gresik dilakukan secara rutin, namun tidak jarang perawatan dilakukan jika terjadi masalah pada bangunan tersebut. Belum ada teknik baku dalam penentuan prioritas perawatan gedung apabila terjadi masalah pada semua elemen bangunan. Untuk itu, penentuan prioritas perawatan gedung sangat diperlukan. Penelitian ini menggunakan metode survei dengan bantuan kuesioner yang diberikan kepada para manajer dan supervisor yang berwenang dalam perawatan gedung produksi biskuit di PT Garudafood Putra Putri Jaya Divisi Biskuit Gresik. Survei dilakukan sebanyak empat kali, yang terdiri dari survei pendahuluan yang bertujuan untuk mendapatkan kriteria dalam perawatan gedung produksi biskuit, lalu dilanjutkan dengan survei expert judgement terhadap Plant Manager selaku top management untuk memperoleh kesepakatan kriteria yang akan digunakan dalam perawatan gedung produksi. Survei selanjutnya, yaitu survei ketiga, bertujuan untuk mendapatkan perbandingan berpasangan (pairwise comparison) antar kriteria. Survei yang terakhir (keempat), yaitu survei direct rating, bertujuan untuk mendapatkan nilai tiap elemen bangunan pada semua kriteria di bangunan produksi Plant 1 dan Plant 2. Hasil penelitian menunjukkan bahwa terdapat enam kriteria yang akan digunakan dalam penentuan prioritas perawatan bangunan di PT Garudafood Putra Putri Jaya Gresik, yaitu keutamaan fungsi, efek terhadap pengguna, kondisi fisik, efek terhadap struktur, efektivitas biaya, dan efek ketentuan pelayanan. Sedangkan urutan alternatif (elemen bangunan) yang akan dilakukan perawatan untuk bangunan produksi Plant 1 yaitu lantai, atap, instalasi/sirkulasi, dan dinding, sedangkan untuk Plant 2 yaitu dinding, atap, lantai, dan instalasi/sirkulasi.
=================================================================================================================================
Building maintenance is one of the important activities as part of the production process. This is due to the fact that without good building conditions, the production process cannot run as expected. One of the goals of building maintenance activities is to maintain the building condition and its elements, materials, and equipment inside the building in order to function optimally as designed. Building maintenance at PT Garudafood Putra Putri Jaya Gresik is conducted regularly, but corrective repairs are carried out whenever there is a problem with the buildings. No standard is applied to determine priorities for building maintenance. Therefore, building maintenance priority determination is highly required. The research used a survey method by means of questionnaires distributed to managers and supervisors who are responsible for the maintenance of biscuit production buildings at PT Garudafood Putra Putri Jaya. The survey was conducted in four phases, consisting of an introductory survey aimed at obtaining criteria for building maintenance and an expert-judgment survey involving the Plant Manager as top management to obtain agreement on the criteria to be used for maintaining the production buildings. It was then continued with the third survey, which aimed to obtain pairwise comparisons between the criteria. The last survey involved direct rating, which aimed to obtain scores for each building element based on all criteria within Plant 1 and Plant 2 of the production buildings. The results of the research showed that there were six criteria to be used in determining building maintenance priorities at PT Garudafood Putra Putri Jaya Gresik, namely importance of usage, effect on users, physical condition, effect on structure, cost effectiveness, and effect on service provision. Meanwhile, the order of alternatives to be used for maintaining the production building in Plant 1 comprised floor, roof, installation/circulation, and walls; while in Plant 2, the order was walls, roof, floor, and installation/circulation.
| Item Type: | Thesis (Masters) |
|---|---|
| Additional Information: | RTMT 690.24 Lak p |
| Uncontrolled Keywords: | Prioritas, perawatan, gedung, Garudafood, kriteria, priority, maintenance, building, Garudafood, criteria |
| Subjects: | T Technology > TH Building construction > TH3351 Maintenance and repair |
| Divisions: | Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis |
| Depositing User: | magang . |
| Date Deposited: | 17 Sep 2026 04:05 |
| Last Modified: | 17 Sep 2026 04:05 |
| URI: | http://repository.its.ac.id/id/eprint/144630 |
Actions (login required)
![]() |
View Item |
