PT Tri Ratna Diesel (PT TRD) merupakan perusahaan manufaktur yang bergerak di bidang pembuatan mesin diesel dan pada tahun 2010 berencana meningkatkan target produksi mesin diesel seri D 700 dan D 2700 masing-masing sebanyak 500 unit per bulan. PT TRD memiliki Divisi CNC Machining (CNC) yang bertugas memproses komponen mesin diesel. Berdasarkan hasil analisis internal perusahaan, pembuatan crank case pada Divisi CNC memerlukan waktu paling lama dibandingkan dengan proses pembuatan komponen lainnya. Penelitian ini difokuskan pada Divisi CNC dengan objek penelitian berupa proses pembuatan crank case mesin diesel seri D 700 dan D 2700. Permasalahan yang dihadapi perusahaan adalah belum tersedianya fasilitas yang mampu memenuhi target produksi yang telah direncanakan. Usulan perbaikan didasarkan pada tingkat kebutuhan proses yang dikerjakan oleh setiap mesin. Jenis mesin yang diusulkan adalah double spindle milling machine, radial drill machine, dan vertical milling machine. Total biaya investasi selama 10 tahun dengan tingkat bunga 6,5%, berdasarkan komposisi alternatif mesin yang dipilih dan ditinjau dari nilai sekarang (present value), adalah sebesar Rp10.366.353.000,00. Penataan mesin menggunakan product layout karena urutan proses produksi yang diusulkan berlangsung secara berurutan, dimulai dari double spindle milling machine, radial drill machine, kemudian vertical milling machine. Pola aliran material yang digunakan adalah berbentuk S (S-shaped) karena dipengaruhi oleh bentuk dan pemanfaatan ruang yang tersedia secara maksimal. Luas area yang dibutuhkan adalah 12 × 20 m² dan terdapat tiga area berukuran 2 × 2 m² yang digunakan sebagai buffer storage. Jarak yang ditempuh material sejak awal masuk ke dalam rangkaian proses produksi hingga selesai diproduksi adalah 42,5 meter.
=================================================================================================================================
PT Tri Ratna Diesel (PT TRD) is a manufacturing company engaged in diesel engine production. In 2010, the company planned to increase its production target for the D 700 and D 2700 diesel engine series to 500 units per month for each series. PT TRD has a CNC Machining Division (CNC) responsible for processing diesel engine components. Based on the results of an internal company analysis, the production of the crank case in the CNC Division requires the longest processing time compared with the production of other components. This research focuses on the CNC Division, with the production process of crank cases for the D 700 and D 2700 diesel engine series as the research object. The problem faced by the company is the unavailability of facilities capable of meeting the planned production target. The proposed improvements are based on the processing requirements and the machines used to perform each process. The proposed machines are a double spindle milling machine, radial drill machine, and vertical milling machine. The total investment cost over a 10-year period at an interest rate of 6.5%, based on the selected machine alternative and calculated using present value, is Rp10,366,353,000.00. The machines are arranged according to a product layout because the proposed production sequence is arranged sequentially, beginning with the double spindle milling machine, followed by the radial drill machine, and then the vertical milling machine. The material flow pattern is S-shaped because it is influenced by the layout and the optimal utilization of the available space. The required area is 12 × 20 m², with three areas measuring 2 × 2 m² used as buffer storage. The total distance traveled by the material from the beginning of the production process until completion is 42.5 meters.

Item Type: Thesis (Masters)
Additional Information: RTMT 658.5 Sut a
Uncontrolled Keywords: tata letak mesin produksi, ekonomi teknik, production machine site system, economy of engineering.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis
Depositing User: magang .
Date Deposited: 21 Sep 2026 02:13
Last Modified: 21 Sep 2026 02:15
URI: http://repository.its.ac.id/id/eprint/144713

Actions (login required)

View Item View Item