Perencanaan Ulang Sistem Drainase Kecamatan Mojoroto Kediri

Salamun, Afifah Zahrah (2008) Perencanaan Ulang Sistem Drainase Kecamatan Mojoroto Kediri. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3304100017-Undergraduate_Thesis.pdf] Text
3304100017-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (24MB)

Abstract

Di Kota Kediri setiap terjadi hujan akan timbul genangan, terutama di Kecamatan Mojoroto, yang dapat mengakibatkan aktivitas masyarakat terganggu. Hal itu terjadi karena masih belum adanya sistem drainase yang memadai dan berkurangnya daerah resapan air hujan yang mempengaruhi penurunan kemampuan tanah untuk membantu peresapan air hujan. Tinggi genangan mencapai 15–45 cm dengan lama genangan mencapai 1–4 jam. Pada perencanaan ini dilakukan analisis hidrologi dengan PUH 10 tahun untuk saluran primer dan PUH 5 tahun untuk saluran sekunder serta analisis debit saluran dan gorong-gorong. Analisis tersebut akan dievaluasi terhadap kapasitas saluran yang ada. Dari hasil evaluasi dapat disimpulkan bahwa terdapat tujuh saluran yang perlu dilakukan rehabilitasi yaitu saluran 10–11, 17–18, 11–12, 29–30, 4–5, dan 8–9 serta dua gorong-gorong yaitu G2 dan G4 yang masing-masing terdapat pada saluran 10–11 dan 16–17 karena kapasitasnya tidak memadai. Adapun jumlah anggaran untuk perbaikan tersebut sebesar Rp 13.321.350.000,00.
=======================================================================================================================================
In the city of Kediri, when it is raining, some areas will be inundated. It happens because of decreasing the infiltration rate due to new buildings that have been built here. Stagnant height reaches 15–45 cm with stagnant time of about 1–4 hours. In this design, a frequency of 10 years for rainfall is made from primary channels and of 5 years for rainfall is made from secondary channels, and also analysis of flow channels and box culverts. Those analyses are conducted to evaluate the capacity of existing channels. Evaluation results can be concluded that there are seven channels, 10–11, 17–18, 11–12, 29–30, 4–5, and 8–9, and two box culverts, G2 and G4, that need rehabilitation because of their lack of capacity. The budget for those repairs is Rp 13,321,350,000.00.

Item Type: Thesis (Other)
Additional Information: RSL 627.54 Sal p
Uncontrolled Keywords: Perencanaan Ulang, Sistem Drainase, Banjir, Kecamatan Mojoroto, Redesign, Drainage system, Flood, Sflbdistrict of Mojoroto
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE215 Drainage
Divisions: Faculty of Civil Engineering and Planning > Environment Engineering > 25201-(S1) Undergraduate Thesis
Depositing User: Gunawan .
Date Deposited: 26 Oct 2026 03:34
Last Modified: 26 Oct 2026 03:34
URI: http://repository.its.ac.id/id/eprint/145852

Actions (login required)

View Item View Item