Wibowo, Sulistyono (2007) Analisa Pemilihan Keputusan Metode Pelaksanaan Erection Girder Tipe – 1 Dengan Metode Ahp (Studi Kasus: Causeway Jembatan Suramadu Sisi Madura). Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
3100100097-Undergraduate_Thesis.pdf Restricted to Repository staff only Download (37MB) |
Abstract
Proyek Pembangunan Causeway Jembatan Suramadu Sisi Madura Tahap II yang berlokasi di tengah laut menghadapi berbagai kendala dalam pelaksanaan pekerjaan erection girder. Kondisi pasang surut air laut dan angin kencang menjadi faktor yang menyebabkan pekerjaan tersebut sulit dilaksanakan. Selain itu, keterbatasan waktu dan biaya juga menjadi kendala dalam menentukan metode pelaksanaan yang tepat. Penelitian ini bertujuan untuk menentukan atribut beserta bobot prioritasnya dalam pemilihan metode erection girder, menentukan bobot prioritas alternatif metode pelaksanaan, serta menganalisis pengaruh perubahan atribut terhadap bobot prioritas alternatif pada Proyek Pembangunan Causeway Jembatan Suramadu Sisi Madura Tahap II. Alternatif metode yang dipertimbangkan meliputi metode floating crane, metode kura-kura (crawler crane yang dikombinasikan dengan winch roller), dan metode girder launcher. Tahapan penelitian meliputi identifikasi atribut kriteria dan alternatif melalui survei wawancara dengan metode kompromi, penentuan bobot prioritas atribut dan alternatif menggunakan pendekatan Analytic Hierarchy Process (AHP), serta analisis sensitivitas berupa dynamic sensitivity dengan bantuan perangkat lunak Expert Choice 2000. Berdasarkan hasil analisis terhadap empat responden secara terpisah, diperoleh bahwa dua responden, yaitu kepala proyek dari pihak kontraktor dan asisten teknik dari pihak pemilik proyek (owner), memiliki prioritas atribut utama yang sama, yaitu mutu dan waktu. Sementara itu, penilaian site office engineering dari pihak kontraktor menempatkan waktu sebagai atribut prioritas utama, sedangkan penilaian staff engineering dari pihak konsultan menempatkan mutu sebagai atribut prioritas utama. Dalam penentuan bobot prioritas alternatif, keempat responden secara terpisah menghasilkan keputusan yang sama, yaitu metode girder launcher sebagai alternatif dengan prioritas tertinggi untuk pelaksanaan erection girder. Berdasarkan analisis secara berkelompok, diperoleh bobot masing-masing atribut, yaitu mutu sebesar 0,2878, waktu sebesar 0,2776, biaya sebesar 0,1263, cara operasi sebesar 0,1124, dan risiko sebesar 0,1960. Adapun bobot prioritas alternatif metode erection girder adalah metode floating crane sebesar 0,3152, metode kura-kura sebesar 0,1062, dan metode girder launcher sebesar 0,5787. Hasil analisis sensitivitas secara berkelompok menunjukkan bahwa metode girder launcher sebagai alternatif dengan prioritas tertinggi tidak sensitif terhadap perubahan atribut mutu, biaya, cara operasi, dan risiko, tetapi sensitif terhadap perubahan atribut waktu.
=================================================================================================================================
The Suramadu Bridge Causeway Construction Project on the Madura Side, Phase II, is located offshore and faces several challenges in girder erection. Tidal fluctuations and strong winds make girder erection one of the most difficult construction activities to carry out. In addition, time and budget constraints pose further challenges in selecting an appropriate construction method. This study aims to determine the criteria attributes and their priority weights for selecting a girder erection method, establish the priority weights of the alternative methods, and analyze the effects of changes in the attributes on the priority weights of the alternatives for the Suramadu Bridge Causeway Construction Project on the Madura Side, Phase II. The alternatives considered are the floating crane method, the turtle method, which combines crawler cranes with winch rollers, and the girder launcher method. The research stages include identifying criteria attributes and alternatives through interviews using a compromise approach, determining the priority weights of the attributes and alternatives using the Analytic Hierarchy Process (AHP), and conducting dynamic sensitivity analysis using Expert Choice 2000 software. Based on the separate assessments of four respondents, two respondents the project manager representing the contractor and the engineering assistant representing the project owner identified quality and time as the main priority attributes. Meanwhile, the site office engineer representing the contractor ranked time as the highest-priority attribute, whereas the engineering staff member representing the consultant ranked quality as the highest-priority attribute. Regarding the priority weights of the alternative methods, all four respondents independently identified the girder launcher method as the highest-priority alternative for girder erection. The group analysis yielded the following attribute weights: quality, 0.2878; time, 0.2776; cost, 0.1263; operating method, 0.1124; and risk, 0.1960. The priority weights for the alternative girder erection methods were 0.3152 for the floating crane method, 0.1062 for the turtle method, and 0.5787 for the girder launcher method. The results of the group dynamic sensitivity analysis indicate that the girder launcher method remains the highest-priority alternative despite changes in the quality, cost, operating method, and risk attributes, but its priority is sensitive to changes in the time attribute.
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | RSS 658.403 Wib a 2007 |
| Uncontrolled Keywords: | Jembatan Suramdu, AHP, erection girder, Bridge Suramdu, AHP. erection girder |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD30.23 Decision making. Business requirements analysis. |
| Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
| Depositing User: | magang . |
| Date Deposited: | 27 Oct 2026 07:07 |
| Last Modified: | 27 Oct 2026 07:07 |
| URI: | http://repository.its.ac.id/id/eprint/145897 |
Actions (login required)
![]() |
View Item |