Evaluasi Kinerja Simpang Lima, Jl. Raya By Pass–Jl. Jayanegara–Jl. Jabon–Jl. Meri Kabupaten Mojokerto dengan Metode MKJI 1997

Putra, Handrian Prana (2008) Evaluasi Kinerja Simpang Lima, Jl. Raya By Pass–Jl. Jayanegara–Jl. Jabon–Jl. Meri Kabupaten Mojokerto dengan Metode MKJI 1997. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3107040017-Undergraduate_thesis.pdf] Text
3107040017-Undergraduate_thesis.pdf
Restricted to Repository staff only

Download (74MB)

Abstract

Kondisi persimpangan Jl. Raya By Pass–Jl. Jayanegara–Jl. Jabon–Jl. Meri Kabupaten Mojokerto dengan Metode MKJI 1997 masih sering terjadi antrian panjang kendaraan, terutama pada saat jam-jam sibuk yaitu pada waktu pagi, waktu siang dan waktu sore yang akhirnya mengarah pada kemacetan dan jumlah antrian yang cukup panjang. Evaluasi kinerja persimpangan yaitu mengevaluasi pelayanan persimpangan jalan terhadap volume kendaraan yang melintas pada persimpangan Jl. Raya By Pass–Jl. Jayanegara–Jl. Jabon–Jl. Meri Kabupaten Mojokerto. Dari data survey volume kendaraan dan hasil survey geometrik di lokasi persimpangan tersebut, ditentukan alternatif dan solusi pemecahannya yang berdasarkan metode MKJI 1997 dengan analisa simpang bersinyal kemudian dilanjutkan dengan perubahan geometrik persimpangan dan perubahan cycle time atau perubahan fase. Hasil analisa pengaturan arus lalu lintas berdasarkan pada metode MKJI 1997 untuk kondisi existing simpang Jl. Raya By Pass mendapatkan LOS F, Jl. Jayanegara mendapatkan LOS F, Jl. Jabon mendapatkan LOS F, dan Jl. Meri mendapatkan LOS F, maka diperlukan pelebaran geometrik jalan dan perubahan cycle time di setiap persimpangan, dan diperlukan perubahan kinerja fase. Selanjutnya dari hasil analisa tersebut didapatkan Level of Service adalah Jl. Raya By Pass mendapatkan LOS C, Jl. Jayanegara mendapatkan LOS C, Jl. Jabon mendapatkan LOS C, dan Jl. Meri mendapatkan LOS C. Untuk jangka waktu 5 tahun (2013) dengan perubahan geometrik dan perubahan cycle time ternyata pada tahun ke-4 (2012) hasil dari analisa sudah tidak dapat menampung kapasitas kendaraan dengan masih didapatkan hasil sebagai berikut yaitu dengan Level of Service Jl. Raya By Pass F, Jl. Jayanegara F, dan Jl. Jabon F. Jadi pada tahun 2012 persimpangan Jl. By Pass–Jl. Jayanegara–Jl. Jabon harus mengevaluasi ulang kinerja tersebut.
==========================================================================================================================================
Condition of Intersection Raya By Pass–Jayanegara–Jabon–Meri roads, Mojokerto Regency, Method with MKJI 1997, still often be happened by the long queue of vehicle, especially at the time of the rush hour, that is when morning, day time and evening time, which finally instruct at stagnation and sum up queue which long enough. Evaluate intersection performance that is evaluate service of intersecting street about vehicle volume rush by Intersection Raya By Pass–Jayanegara–Jabon–Meri roads, Mojokerto Regency. From data survey vehicle volume and result of geometric survey in location the Intersection, determined by alternative and solution resolving which pursuant to method MKJI 1997 with analysis digress bersinyal later then be continued with change of geometrik intersection and change cycle time or phase change. Result of analysis of arrangement of current of traffic of pursuant to at method MKJI 1997 for condition digress existing Raya By Pass–Jayanegara–Jabon–Meri roads get LOS F. Hence be needed by enlargement roads geometric and change cycle time every Intersection, and needed by change of phase performance. Hereinafter from got the analysis result Level of Service is Raya By Pass–Jayanegara–Jabon–Meri roads get LOS C. For duration 5 year (2013) with change of geometrik and change of cycle time really in the year to 4 (2012) result from analysis have cannot accommodate vehicle capacities with still be got the following result that is with Level of Service Raya By Pass–Jayanegara–Jabon–Meri roads get LOS F. Become in the year 2012 intersection Raya By Pass–Jayanegara–Jabon–Meri roads have to reevaluate the performance.

Item Type: Thesis (Other)
Additional Information: RSS 388.413 12 Put e
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: magang .
Date Deposited: 28 Oct 2026 02:39
Last Modified: 28 Oct 2026 02:39
URI: http://repository.its.ac.id/id/eprint/145923

Actions (login required)

View Item View Item