Optimasi produksi tiang Pancang Bulat Beton Dengan Linear Programming (Studi Kasus:PT. Wijaya Karya Beton)

Mardianto, Farid (2007) Optimasi produksi tiang Pancang Bulat Beton Dengan Linear Programming (Studi Kasus:PT. Wijaya Karya Beton). Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3101100094-Undergraduate_thesis.pdf] Text
3101100094-Undergraduate_thesis.pdf
Restricted to Repository staff only

Download (40MB)

Abstract

Manusia selalu dihadapkan pada permasalahan dalam menentukan suatu keputusan. Hal ini juga terjadi pada perusahaan manufaktur, khususnya dalam menentukan jumlah produksi pada mesin yang memiliki kapasitas produksi berbeda. Dalam memilih alternatif produksi, para pengambil keputusan perlu mempertimbangkan kendala-kendala yang dapat memengaruhi kegiatan operasional produksi. Tugas akhir ini bertujuan untuk mengidentifikasi data-data yang akan dijadikan variabel fungsi tujuan dan variabel batasan (constraint) dalam pemodelan pemrograman linier, menyelesaikan perhitungan model pemrograman linier untuk memperoleh keuntungan produksi maksimum berdasarkan kapasitas produksi yang tersedia, serta mengimplementasikan hasil perhitungan produksi optimal menggunakan pemrograman linier dan membandingkannya dengan hasil produksi aktual (produksi riil) pada PT Wijaya Karya Beton. Untuk membahas permasalahan tersebut, disusun suatu model pemrograman linier yang terdiri atas variabel fungsi tujuan dan variabel fungsi pembatas (constraint). Perhitungan model pemrograman linier dilakukan dengan menggunakan program bantu Microsoft Excel Solver. Selanjutnya, hasil perhitungan yang diperoleh dibandingkan dengan kondisi aktual kegiatan produksi perusahaan. Berdasarkan hasil analisis perhitungan pemrograman linier dengan menggunakan program bantu Microsoft Excel Solver, diperoleh total keuntungan produksi pada tahun 2005 sebesar Rp34.141.344.649,69, dengan rata-rata keuntungan per bulan sebesar Rp2.845.112.054,14. Sementara itu, hasil perbandingan antara perhitungan pemrograman linier dan kondisi aktual kegiatan produksi perusahaan menunjukkan bahwa tidak terdapat perbedaan yang signifikan.
==================================================================================================================================
Every company faces challenges in improving its performance and resolving technical problems that arise during production processes. In manufacturing companies, one of these challenges is determining the optimal production quantities for machines with different production capacities. When selecting production alternatives, decision-makers must consider the constraints that may affect operational activities. The objectives of this final project are to identify the data required as objective function variables and constraint variables in a linear programming model, solve the model to determine the maximum production profit based on available production capacities, and implement the optimal production results obtained through linear programming by comparing them with the actual production results of PT Wijaya Karya Beton. To address these issues, a linear programming model was developed consisting of an objective function and constraint functions. Microsoft Excel Solver was used to perform the linear programming calculations. The results were then compared with the company's actual production conditions. Based on the analysis using Microsoft Excel Solver, the total production profit in 2005 was calculated at Rp34,141,344,649.69, with an average monthly profit of Rp2,845,112,054.14. Meanwhile, the comparison between the linear programming results and the company's actual production activities showed no significant differences.

Item Type: Thesis (Other)
Additional Information: RSS 658.403 Mar o 2007
Uncontrolled Keywords: Optimasi, Linear programming, Tiang pcmccmg, Optimalization, Linear programming. Concrete pile
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.23 Decision making. Business requirements analysis.
T Technology > T Technology (General) > T57.74 Linear programming
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: magang .
Date Deposited: 28 Oct 2026 03:19
Last Modified: 28 Oct 2026 03:19
URI: http://repository.its.ac.id/id/eprint/145943

Actions (login required)

View Item View Item