Prasetyo, Hanung (2026) Pemilihan Model Kemitraan SPKLU Antara PLN Electricity Services Dan PT TransJakarta Dengan Analisis Benefit Cost Ratio-AHP. Masters thesis, Institut Teknologi Sepuluh Nopember.
|
Text
6032242023-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (3MB) | Request a copy |
Abstract
Pesatnya pertumbuhan penggunaan kendaraan bermesin pembakaran dalam di DKI Jakarta telah meningkatkan kemacetan lalu lintas dan emisi gas rumah kaca. Sebagai strategi mitigasi, Pemerintah Provinsi DKI Jakarta menargetkan penyediaan 10.207 unit transportasi publik listrik pada tahun 2030 melalui PT TransJakarta, yang membutuhkan dukungan infrastruktur Stasiun Pengisian Kendaraan Listrik Umum (SPKLU). PT PLN Electricity Services (PLN ES) melihat peluang strategis dalam penyediaan infrastruktur SPKLU untuk PT TransJakarta melalui dua alternatif skema kemitraan, yaitu Build Operate Transfer (BOT) dan kontrak Engineering, Procurement, and Construction (EPC). Kedua skema tersebut mencerminkan orientasi strategis yang berbeda, dengan model BOT menempatkan PLN ES sebagai investor, sedangkan model EPC menempatkan PLN ES sebagai kontraktor. Oleh karena itu, penelitian ini bertujuan untuk menentukan skema yang paling tepat agar PLN ES dapat mengoptimalkan sumber daya yang dimiliki dalam menghadapi lingkungan bisnis yang semakin bergejolak, tidak pasti, kompleks, dan ambigu (Volatility, Uncertainty, Complexity, and Ambiguity atau VUCA). Penelitian ini membandingkan kedua skema dari perspektif bisnis untuk menentukan alternatif terbaik menggunakan metode Multi Criteria Decision Making (MCDM), khususnya pendekatan Benefit Cost Risk (BCR) yang diintegrasikan dengan Analytical Hierarchy Process (AHP). Hasil penelitian menunjukkan bahwa skema EPC lebih tepat dibandingkan skema BOT bagi PLN ES, sebagaimana ditunjukkan oleh kinerja yang lebih unggul dalam evaluasi Benefit Cost Risk (BCR) berbasis AHP. Model EPC secara konsisten menunjukkan kinerja yang lebih baik dibandingkan model BOT, baik sebelum maupun setelah faktor risiko diperhitungkan. Temuan ini menunjukkan bahwa skema EPC memiliki efisiensi dan ketahanan yang lebih baik secara keseluruhan dalam mendukung pengambilan keputusan investasi dan kemitraan bisnis PLN ES.
=====================================================================================================================================
The rapid growth of combustion engines in DKI Jakarta has increased traffic congestion and greenhouse gas emissions. As a mitigation strategy, Govern-ment of DKI Jakarta will provide 10.207 electric public transport units by 2030 through PT TransJakarta, which requires Public Electric Vehicle Charging Sta-tions (SPKLU). PLN Electricity Services identifies a strategic opportunity in the provision of SPKLU infrastructure for PT TransJakarta through two alter-native partnership schemes, Build Operate Transfer (BOT) and Engineering, Procurement, and Construction (EPC) contracts. These two schemes reflect contrasting strategic orientations, with the BOT model positioning PLN ES as an investor and the EPC model as a contractor. Accordingly, this study aims to determine the most appropriate scheme that enables PLN ES to optimize the resources in the context of an increasingly volatile, uncertain, complex, and ambiguous (VUCA) environment. This study aims to compare the two schemes from a business perspective then decide the best scheme using a Multi Criteria Decision Making (MCDM) specifically Benefit Cost Ratio AHP. The findings reveal that the EPC scheme is more appropriate than the BOT scheme for PLN ES, as evidenced by its superior performance in the AHP-based Benefit Cost Risk (BCR) evaluation. The EPC model consistently outperforms the BOT model, both prior to and following the inclusion of risk considerations, indicating greater overall efficiency and robustness.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | Charging Station (SPKLU), Build Operate Transfer (BOT), Engineering Procurement Construction (EPC), Multi Criteria Decision Making (MCDM), Analytical Hierarchy Process (AHP). |
| Subjects: | T Technology > T Technology (General) > T58.62 Decision support systems |
| Divisions: | Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT) |
| Depositing User: | Hanung Prasetyo |
| Date Deposited: | 20 Nov 2026 05:53 |
| Last Modified: | 20 Nov 2026 05:53 |
| URI: | http://repository.its.ac.id/id/eprint/146078 |
Actions (login required)
![]() |
View Item |
