MANAJEMEN RISIKO PEMBANGUNAN JACKET STRUCTURE: Studi Kasus di PT. PAL INDONESIA

WIBOWO, TRI ARY (2014) MANAJEMEN RISIKO PEMBANGUNAN JACKET STRUCTURE: Studi Kasus di PT. PAL INDONESIA. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
4310100088-Undergraduate_Theses.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

Penyedia jasa EPC (Engineering, Procurement dan Construction) selalu dipenuhi risiko dalam pelaksanaan proyek. Risiko yang terjadi salah satunya pembangunan Jacket Platform Banuwati-K Gas Compressor di PT. PAL Indonesia dengan lingkup dampak risiko pada kinerja waktu. Risiko yang akan diteliti adalah pada fase desain engineering, fase procurement, dan fase construction, yang menyebabkan proyek diselesaikan terlambat dari waktu yang direncanakan. Hasil penelian dari tugas akhir ini yang dibantu dengan uji persamaan persepsi Kruskal-Wallis untuk mendapatkan persamaan persespi dan Matriks risiko untuk mendapakan level risiko. Dari 3 variabel yang dianalisis terdapat 22 sub variabel yang mempunyai persepsi sama dari tiap respoden. Dari 22 sub variabel tersebut terdapat tiga sub variabel yang memiliki level risiko tinggi dan sangat tinggi yaitu: Ketidakcocokan desain dengan pelaksanaan dengan nilai probability= 0,600 dan nilai impact = 0,213, Sering terjadi re-design/rework dengan nilai probability= 0,667 dan nilai impact = 0,408, Perubahan spesifikasi oleh owner work dengan nilai probability= 0,633 dan nilai impact = 0,375, Keterlambatan pasokan material/bahan dengan nilai probability= 0,600 dan nilai impact = 0,367 , dan Perubahan desain yang cukup sering terjadi dengan nilai probability= 0,617 dan nilai impact = 0,400. Kelima sub variabel tersebut dilakukan mitigasi risiko untuk mengurangi dampak terhadap waktu. Strategi mitigasi yang digunakan adalah: koordinasi, komitmen, dan memperjelas lingkup kontrak dengan owner. ============================================================================================== Service providers EPC (Engineering, Procurement and Construction) always filled risks in project implementation. The risk happens at Platform Jacket Banuwati-K Gas Compressor project at PT. PAL Indonesia and the scope of the impact of risk base on time. Risk to be studied is the engineering design phase, procurement phase, and construction phase, which causes the project late from the time has been planned. The results of the study presented this final project is helped by the Kruskal-Wallis test to get same perception from each expert judgement and the risk matrix to get risk level. From three variables that were analyzed contained 22 sub-variables that have the same perception from each expert judgement. From 22 sub-variables, there are five sub-variables that have a high and very high risk levels, those are: Incompatibility the design with implementation with probability score = 0.600 and impact score = 0.213, redesign/rework often happens with probability score = 0.667 and impact score = 0.408, specification changes by the owner with a probability score = 0.633 and impact score = 0.375, delay in supply of materials / equipment with a probability score = 0.600 and impact score = 0.367, and design changes are quite often with a probability score = 0.617 and impact score = 0,400. These five sub-variables is reduce the impact on time by risk mitigation. Mitigation strategies are: coordination, commitment, and clarify the scope of the contract with the owner.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Banuwati-K Gas Compressor, Kruskal-Wallis, Matriks Risiko, Mitigasi
Subjects: T Technology > T Technology (General)
T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Faculty of Marine Technology > Ocean Engineering > (S1) Undergraduate Theses
Depositing User: Mr. Fandika aqsa
Date Deposited: 13 Jan 2017 06:52
Last Modified: 13 Jan 2017 06:52
URI: http://repository.its.ac.id/id/eprint/1548

Actions (login required)

View Item View Item