Optimasi Biaya Penggunaan Alat Berat Pada Proyek Pembangunan Underpass Mayjen Sungkono Surabaya

Notoprasetio, Denny Dwiputra (2017) Optimasi Biaya Penggunaan Alat Berat Pada Proyek Pembangunan Underpass Mayjen Sungkono Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3114106051-Undergraduated_Theses.pdf]
Preview
Text
3114106051-Undergraduated_Theses.pdf - Published Version

Download (4MB) | Preview

Abstract

Alat berat memegang peranan penting karena dapat mempermudah dan membantu pekerja dalam menyelesaikan proyek terutama untuk proyek dengan skala besar. Alat berat yang akan digunakan pada suatu proyek harus diperhatikan karena berpengaruh terhadap waktu dan biaya pelaksanaan proyek. Penelitian ini bertujuan untuk melakukan optimasi biaya penggunaan alat berat yang akan dianalisa pada pekerjaan tanah proyek underpass Mayjen Sungkono Surabaya.
Pemilihan alat berat dilakukan dengan menghitung masing-masing biaya dan jumlah alat berat pada pekerjaan galian, timbunan dan pemadatan tanah pada proyek pembangunan underpass mayjen sungkono Surabaya, dan dipilih berdasarkan batasan-batasan yang ada yaitu batasan biaya, batasan waktu, batasan jumlah alat berat, dan batasan produksi alat berat. Batasan ini akan digunakan sebagai kendala dalam penganalisaan Penelitian ini. Analisa yang digunakan untuk menentukan jumlah masing-masing alat berat adalah dengan menggunakan program linier metode simpleks.
Dari hasil analisa alat berat menggunakan program linier metode simpleks didapatkan alat berat yaitu, 2 buah Excavator, 2 buah Bulldozer, 1 buah Motor Grader dan 1 buah Vibratory Roller, dengan biaya Rp.791.164 /jam untuk pekerjaan galian, Rp.1.544.688 /jam untuk pekerjaan timbunan. ===== Heavy equipment plays an important role because it can facilitate and assist employees in completing the project, especially for projects in a large scale. Heavy equipment which is used in a project must be considered because it affects the time and cost of the project. This research aims to optimize the costs of using the heavy equipment that will be analyzed for the underpass project in Mayjen Sungkono Surabaya.
The selection of heavy equipment was done by calculating the respective costs and the amount of heavy equipment excavation work, pile and soil compaction on development projects in underpass Mayjen Sungkono Surabaya, and selected based on the boundaries that exist which limit costs, time constraints, limits the number of heavy equipment, and limit the production of heavy equipment. These limits will be used as an obstacle in analyzing this thesis. The analysis which is used to determine the number of each machine is linear program.
From the analysis tool by using the linear program obtained heavy equipment, namely, two excavators, two bulldozers, one Motor Graders and one Vibratory Rollers, at a cost of Rp.791.164 / hour in excavation work, and Rp.1.544.688 / hour in embankments work.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Optimasi; alat berat; program linier; optimization; heavy equipment; linear programming
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TE Highway engineering. Roads and pavements > TE7 Transportation--Planning
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: - DENNY DWIPUTRA NOTOPRASETIO
Date Deposited: 29 Mar 2017 08:14
Last Modified: 29 Mar 2017 08:17
URI: http://repository.its.ac.id/id/eprint/2257