Analisis waktu dan biaya pelebaran jalan Turen – Batas kab. Lumajang menggunakan perkerasan lentur kabupaten Malang Provinsi Jawa Timur

Rosidy, Agus Renanto (2017) Analisis waktu dan biaya pelebaran jalan Turen – Batas kab. Lumajang menggunakan perkerasan lentur kabupaten Malang Provinsi Jawa Timur. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3114105053-Undergraduate-Theses.pdf]
Preview
Text
3114105053-Undergraduate-Theses.pdf - Published Version

Download (2MB) | Preview

Abstract

Pelebaran Jalan Turen-Batas Lumajang merupakan untuk peningkatan layanan jalan guna memperlancar mobilisasi . Karena dengan berjalannya waktu dan masa pelayanan jalan, maka kondisi jalan ini akhirnya akan mengalami penurunan kekuatan dan kurangnya ruas jalan untuk menampung kendaraan yang lewat. Pada jalan akses Turen – Batas Lumajang diperkirakan berapa tahun kedepan akan sebagai jalan utama penghubung antara kedua kabupaten .Untuk mengatasi kepadatan dan demi kelancaran lalu lintas maka pada ruas Jalan Turen-Batas Lumajang tersebut pemerintah diperlukan peningkatan jalan yaitu pelebaran ruas jalan. PT Ridlatama Bahtera Construction adalah kontraktor yang menjadi pelaksana untuk menjalankan proyek pelebaran jalan ini. Pelebaran jalan ini pelebaran jalan dengan perkerasan aspal. Didalam pelaksanaan terdapat berbagai aktivitas pekerjaan yang setiap pekerjaan dilakukan perhitungan produktivitas dan biayanya. Dan mengetahui risiko kecelakaan kerja yang mungkin terjadi selama pelaksanaan proyek yang dapat mempengaruhi waktu dan biaya proyek. Berdasarkan perhitungan produktivitas dan analisa biaya dari semua pekerjaan didalam sumber daya yang dibutuhkan didapatkan hasil Rencana Anggaran Biaya sebesar Rp 31.275.127.727 . Dan waktu pelaksanaan proyek dengan menggunakan PDM dapat dilaksanakan dengan waktu 244 hari kalender kerja. Kemudian didapat dari survei dilapangan untuk hasil risiko kecelakaan kerja yang sering terjadi selama pelaksanaan proyek yaitu pekerja tertabrak alat berat dan tertabrak kendaraan lalu lintas dilokasi pekerjaan.

=================================================================================

Road Widening Turen-Lumajang is to increase the
services in order to facilitate the mobilization. Because with the passage of time and a service road, then the condition of this road will eventually experience a decrease in strength and lack of roads to accommodate the passing vehicles. On the access of road Turen - Lumajang estimated many years later will be as the main road link between the two districts. To overcome the density and for smooth traffic on Jalan TurenLumajang government needs to improve the road widening. PT Ridlatama Bahtera Contruction is the contractor who became executor to carry out the road widening project. Widening this road widening roads with asphalt pavement. There are various activities in the implementation of the work that every
job is done calculation of productivity and costs. And knowing the risk of accidents that may occur during the execution of the project that may affect the time and cost of the project. Based on the calculation of productivity and cost analysis of all jobs within the required resources is obtained Budget Plan
amounting to Rp 31,275,127,727. And project implementation time by using PDM can be implemented with a time of 244 calendar days of employment. Then obtained from the field survey for the results of work hazard that often occur during the execution of the project, namely employees hit by heavy equipment and was hit by vehicle traffic in location work.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Produktivitas; Biaya; Pelebaran Jalan; Risiko Kecelakaan Kerja; Productivity; Cost; Road Widening; Work Accident Risks
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: - AGUS RENANTO ROSIDY
Date Deposited: 02 Mar 2017 01:36