Optimasi Dan Analisa Keekonomian Distribusi LNG Ke Pembangkit Di Wilayah Papua

Antara, Gede Bagus Dwi Suasti (2017) Optimasi Dan Analisa Keekonomian Distribusi LNG Ke Pembangkit Di Wilayah Papua. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 9114201412_MASTER THESES.pdf]
Preview
Text
9114201412_MASTER THESES.pdf - Published Version

Download (3MB) | Preview

Abstract

Pengembangan dan pembangunan infrastruktur diharapkan dapat menopang pertumbuhan ekonomi di Indonesia. Pengembangan infrastruktur terkait logistik dan energi menjadi prioritas utama untuk mencapai pertumbuhan sebesar 8% berdasarkan rencana pengembangan dan pembangunan di Indonesia di tahun 2016. PLN melalui RUPTL tahun 2016 – 2025 melaporkan rencana pengembangan 25 pembangkit listrik bermesin/berbahan bakar gas (PLTG/MG) di wilayah Papua. PLTG/MG akan beroperasi dengan suplai gas bumi dari Kilang Tangguh yang memproduksi gas alam cair atau LNG (Liquefied Natural Gas). LNG dari Kilang Tangguh akan didistribusikan dengan menggunakan kapal pengangkut LNG (LNG Vessel) menuju terminal penerima (Receiving Terminal) yang melayani pembangkit listrik di wilayah Papua. Pada penelitian ini dilakukan perancangan distribusi LNG dari kilang LNG di Tangguh dengan kapal pengangkut LNG menuju terminal penerima yang melayani pembangkit listrik tenaga gas yang berada di wilayah Papua. Optimasi distribusi LNG dilakukan dengan menggunakan Algoritma Greedy dan Pemrograman Linear dengan fungsi keputusan meminimalkan biaya transportasi. Variabel masukan berupa kebutuhan LNG dari terminal penerima, kapal dengan variasi kapasitas muat, kecepatan kapal, jarak distribusi dan biaya transportasi akan menjadi masukan dalam optimasi yang akan dilakukan. Hasil optimasi distribusi LNG menunjukan terdapat kapal 10,000 m3 yang melayani rute Tangguh-Bintuni-Rajaampat-Fakfak-Kaimana-Timika-Merauke-Tangguh dengan total biaya transportasi per tahun sebesar US $ 15,361,609 dan kapal dengan ukuran 23,000 m3 melayani rute Tangguh-Sorong-Manokwari-Nabire-Serui-Biak-Sarmi-Jayapura-Tangguh dengan total biaya transportasi per tahun sebesar US $20,064,451. Analisa Keekonomian menunjukan bahwa investasi dikategorikan layak secara finansial jika margin harga penjualan LNG sekurang-kurangnya sebesar US$ 4 per mmbtu yang menghasilkan payback period 10 tahun, IRR 7.8% dan NPV positif sebesar US$ 5,711,318 diakhir tahun ke 20.
=========================================================
=========================================================
Sustainable Development of infrastructure are expected to increase economic growth in Indonesia. Based on Development plan of Indonesian government on 2016, logistics and energy-related infrastructures are the main priority to meet 8% economic growth. PLN through RUPTL 2016-2025 reported the development plan of 25 gas-fired power plant (PLTG/MG) in Papua area. PLTG/MG designed to operate by burning natural gas which supplied from Tangguh LNG Plant. LNG from Tangguh will be transported using LNG vessel to each receiving terminal that serving several PLTG/MG. This research proposed LNG distribution network from Tangguh LNG plant to receiving terminals in Papua area. Optimization of LNG distribution done by using Greedy Algorithm and Linear Programming with minimum transportation cost as the objective function. Variable input for the optimization namely power plant LNG demand, vessel capacity, vessel speed, matix distance and transportation cost. Optimization results showed there are two vessels should utilized for optimum LNG Distribution. 1st vessel with capacity 10,000 m3 serving for LNG distribution routes from Tangguh-Bintuni-Rajaampat-Fakfak-Kaimana-Timika-Merauke-Tangguh with total transportation costs US $ 15,361,609 per year and the 2nd vessel with 23,000 m3 serving LNG distribution routes from Tangguh-Sorong-Manokwari-Nabire- Serui-Biak-Sarmi-Jayapura-Tangguh with total transportation costs US $ 20,064,451 per year. Economical analysis shows to keep the investment feasible, the LNG sells margin should not less than US $ 4 per mmbtu. This margin will give payback period of 10 years, IRR 7.8%, a positive NPV of $ 5,711,318 at the end of 20th years investment duration.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Optimization, LNG Distribution, Greedy algorithm, Linear Programming, Economic Analysis, LNG Receiving Terminal, Papua.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: 61101-Magister Management Technology
Depositing User: GEDE BAGUS DWI SUASTI ANTARA
Date Deposited: 10 Apr 2017 02:03
Last Modified: 05 Mar 2019 01:52
URI: http://repository.its.ac.id/id/eprint/2955

Actions (login required)

View Item View Item