Analisa Teknis dan Ekonomis Pembangunan Galangan Kapal untuk Produksi FPU (Floating Production Unit)

Latif, Samsul (2017) Analisa Teknis dan Ekonomis Pembangunan Galangan Kapal untuk Produksi FPU (Floating Production Unit). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4112100012-Undergraduate-Theses.pdf]
Preview
Text
4112100012-Undergraduate-Theses.pdf

Download (4MB) | Preview

Abstract

Potensi sumber daya minyak dan gas nasional saat ini cukup besar, namun hingga kini
ketersediaan kapal untuk menunjang kegiatan operasi pengeboran minyak dan gas bumi di
Indonesia masih sangat minim, padahal kebutuhannya sangat besar dari tahun ke tahun. Salah
satu kebutuhan kapal penunjang tersebut adalah FPU (Floating Production Unit). Tujuan
dari tugas akhir ini adalah menganalisa secara teknis dan ekonomis pembangunan galangan
kapal untuk produksi FPU. Pertama dilakukan analisa peluang pasar FPU. Kedua dilakukan
analisa pada aspek teknis untuk menentukan fasilitas yang dibutuhkan serta tata letak
galangan kapal untuk memproduksi FPU. Ketiga dilakukan analisa pada aspek ekonomis
untuk mengukur kelayakan pembangunan galangan kapal. Dari hasil analisa yang telah
dilakukan, didapatkan perencanaan galangan di Desa Sidokelar, Paciran, Lamongan dengan
ukuran 350 m x 200 m. Sarana pokok galangan kapal yang dibutuhkan untuk menunjang
proses produksi berupa slipway dan skidway (transfer lift system) yang digunakan untuk
proses load out topside processing module ke hull FPU melalui jetty pada galangan.
Pembangunan galangan kapal untuk produksi FPU memerlukan biaya sekitar 336, 289 milyar
rupiah dan perkiraan investasi kembali pada tahun ke-8 bulan ke-9 dengan nilai Return on
Investment sekitar 11,754 milyar rupiah. Nilai Internal Rate of Return sebesar 11,07 % lebih
besar dari bunga bank yang telah ditetapkan yakni 10,25%. Sehingga investasi pembangunan
galangan untuk produksi FPU layak dilakukan.
=========================================================================================================
The potential of national oil and gas resources are currently quite large, but until now
the availability of ships to support drilling operations of oil and gas in Indonesia is still low,
whereas the need is great year after year. The one of ships needed to support drilling
operation is FPU (Floating Production Unit). The objective of this final project is to analyze
the technical and economical of shipyard development specifically for FPU. Firstly, potential
market of FPU was analyzed. Secondly, analysis of technical aspects to determine the
facilities needed for the shipyard was performed. Thirdly, analysis of economical aspects and
feasibility of shipyard development was estimated. From the analysis, obtained that the
shipyad will be located in Sidokelar, Paciran, Lamongan Regency, where its area is 350 m x
200 m. Main facilities to support the production process are slipway and skidway (transfer lift
system) to load out topside processing module to FPU hull through jetty at the shipyard. The
shipyard development requires an investment cost about 336,289 billion rupiah and payback
period will be in year 8 and in month 11. The value of Return on Investment is about 11,754
billion rupiah and Internal Rate of Return is 11.07% greater than the determined interest
10.25%. These results show that this shipyard development is feasible.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: FPU, industry, investment, shipyard
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: Mr. Fandika aqsa
Date Deposited: 15 Mar 2017 01:50
Last Modified: 15 Mar 2017 01:50
URI: http://repository.its.ac.id/id/eprint/41185