PT. Semen Padang sebagai salah satu produsen semen terbesar di kawasan Indonesia bagian barat, seiring dengan perkembangan industri semen PT. Semen Padang melakukan penambahan pabrik baru Indarung VI untuk menunjang proses produksi. Dengan penambahan beban muncul permasalahan pada sistem kelistrikannya, yaitu sering terjadi kegagalan proteksi pada trafo utama yang ada di GI Semen Padang pada saat terjadi gangguan, sehingga kontinuitas daya ke beban terganggu dan mengakibatkan pemadaman yang lebih luas. Melalui tugas akhir ini dilaksanakan studi koordinasi proteksi pada PT. Semen Padang yang tepat dalam mendeteksi dan mengisolir gangguan sehingga tidak mengganggu sistem yang sedang berjalan dan mencegah kemungkinan terjadinya kerusakan peralatan listrik.Dari hasil plot koordinasi kurva arus waktu kondisi existing setting koordinasi rele arus lebih fasa masih ada kesalahan koordinasi sehingga perlu dilakukan evaluasi ulang untuk mendapatkan hasil resetting yang bisa direkomendasikan sebagai setting rele pengamannya. Melalui hasil analisis dan perhitungan manual direkomendasikan penyetelan pick up rele arus lebih dan penyetelan grading time . Rele yang disetel ulang adalah rele arus lebih gangguan fasa (overcurrent relay). ================================================================================================================== PT . Semen Padang as one of the largest cement plant in the weastern of Indonesia , Along with development cement industry PT. Semen Padang planning to add new plants Indarung VI to support the production process. With the addition of load, problems occur in the electrical system, the failure protection often occur in GI Semen Padang during a fault, so the continuity of power is being interrupted. Through this final project carried out the correct studies on the coordination of electrical system protection in order to detecting and isolating the fault so the running system is not disturbed and prevent damage to electrical equipment. The results of time current curve in exisiting conditions can be seen that there are misscoordination more phase relay current so that need to re-evaluate to get resetting result which can be reommmended as relay security setting. Through the analysis and manual calculation result, give the recommendation to reset pick up setting and grading time of overcurrent relays. Relays that need to be reset are phase fault overcurrent relays.

Item Type: Thesis (Undergraduate)
Additional Information: RSE 621.317 Sin e
Uncontrolled Keywords: Gangguan, koordinasi proteksi, rele arus lebih gangguan fasa.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK201 Electric Power Transmission
Divisions: Faculty of Industrial Technology > Electrical Engineering > (S1) Undergraduate Theses
Depositing User: Users 13 not found.
Date Deposited: 05 Jun 2017 03:56
Last Modified: 27 Dec 2018 07:46
URI: http://repository.its.ac.id/id/eprint/41482

Actions (login required)

View Item View Item