Maghfiroh, Silsilatil (2016) Pengembangan Software Economic Dispatch (ED) Menggunakan Approximation Methods dengan Memperhitungkan Rugi-rugi Transmisi. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
2213106050-Undergraduate-Theses.pdf Download (1MB) | Preview |
Abstract
Permasalahan economic dispatch pada pembangkit yaitu
mengenai perubahan permintaan daya. Perubahan beban yang berubah
setiap periode waktu tertentu menyebabkan perubahan perhitungan
economic dispatch untuk setiap harga tertentu. Selain perubahan
permintaan daya, pertimbangan lain yang perlu diperhatikan yaitu
mengenai rugi – rugi transmisi. Approximation Methods digunakan
untuk meminimalkan biaya pembangkitan dengan permintaan total
pembebanan yang berbeda di setiap unit pembangkitan. Approximation
Methods ini merupakan metode perkiraan (non-convex) dari fungsi biaya
pembangkitan yang dikembangkan untuk menyelesaikan permasalahan
dengan rugi – rugi transmisi. Metode ini akan diterapkan pada aplikasi
pemrograman, serta referensi plant akan digunakan sebagi uji coba
aplikasi software perhitungan ED yang menjadi tujuan dari pembuatan
tugas akhir. Hasil dari simulasi tugas akhir diperoleh bahwa untuk biaya
pembangkitan bisa lebih murah +/- 370 $/HR.
==================================================================================
Economic dispatch problems at the reactor which is the power
change demand .Change the load that it is changing every a certain
period of time causing change economic dispatch calculation for every a
certain price .In addition to demand change resources , other
consideration that need to be considered which is the compensation
compensation transmission .Approximation methods used to minimize
the cost stirring up with the demand total imposition of differing in
every unit the generation of .Approximation methods this is a method of
approximate ( non-convex ) of the function of the cost of the generation
of being developed to solve problems with the transmission of
compensation compensation .This method to be applied on the
application programming , as well as reference plant will be used for the
trial of a software application calculation ed be a goal for the end of the
manufacture of duty . The result of the end of the simulation duty
obtained that for the cost of the generation of can it be cheaper + / - 370
$/HR.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSE 621.319 21 Mag p |
Uncontrolled Keywords: | Economic dispatch; Rugi-rugi Transmisi; Approximation Methods; Economic Dispatch; Transmission Losses; Approximation Methods |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK5105 Data Transmission Systems |
Divisions: | Faculty of Industrial Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis |
Depositing User: | Anis Wulandari |
Date Deposited: | 06 Jun 2017 04:59 |
Last Modified: | 27 Dec 2018 02:47 |
URI: | http://repository.its.ac.id/id/eprint/41506 |
Actions (login required)
View Item |