Lu`aili, Faizah (2015) Analisis pengambilan keputusan multikriteria berdasarkan penilaian kinerja irigasi menggunakan metode fuzzy AHP dan VIKOR. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
1211100006-Undergraduated_Thesis.pdf - Accepted Version Download (2MB) | Preview |
Abstract
Salah satu penyebab kebutuhan bahan pangan penduduk
tidak dapat dipenuhi adalah menurunnya potensi jaringan
irigasi. Oleh karena itu dibutuhkan adanya perbaikan
pada daerah irigasi (DI) yang mempunyai kinerja rendah.
Dalam penentuan prioritas DI membutuhkan beberapa
kriteria. Penilaian dengan banyak kriteria membutuhkan
suatu metode MCDM. Pada Tugas Akhir ini, diterapkan
perpaduan metode fuzzy AHP dan VIKOR dalam penentuan
prioritas DI berdasarkan penilaian kinerja irigasi. Metode
AHP digunakan untuk pembentukan bobot kriteria melalui
matriks perbandingan berpasangan. Fuzzy berguna untuk
memperbaiki kelemahan AHP yaitu input utamanya berupa
persepsi seorang ahli yang mengandung beberapa vagueness
dalam melakukan penilaian. Sedangkan Metode VIKOR
digunakan untuk menentukan prioritas alternatif. Pada
Tugas Akhir ini, terpilih kriteria yang paling berpengaruh
dalam penentuan prioritas DI adalah kriteria bangunan
utama. Sedangkan dari sembilan alternatif yang ada, terpilih
DI Sangiran yang menjadi prioritas utama untuk diperbaiki.
===========================================================================================================
One reason of unfulfilled food demand in population
is declining of network irrigation potential. Therefore
required the improvement of the Irrigation Area (IA) of low
performance. The determination of IA priorities needs several
criteria. Hence in evaluating within multi criteria problem
needs a method of MCDM. In this paper, integrated methods
of Fuzzy AHP and VIKOR in IA priorities determination is
applied, based on the evaluation of irrigation performance.
AHP method is applied to determine the weights of criteria
by pairwise comparison matrix. The use of Fuzzy in this
paper will improve weakness of AHP, main input by expert
perception who has vagueness in conducting evaluation. In the
other hand, VIKOR method is applied to determine alternative
priorities. Most influential criteria in priority determining in
this paper is main building criteria. Among nine alternatives,
Sangiran IA is the top priority that needs improvement.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSMa 658.403 Lu`a a |
Uncontrolled Keywords: | fuzzy AHP; Kinerja Irigasi; Prioritas; VIKOR |
Subjects: | Q Science > QA Mathematics Q Science > QA Mathematics > QA248_Fuzzy Sets |
Divisions: | Faculty of Mathematics and Science > Mathematics > 44201-(S1) Undergraduate Thesis |
Depositing User: | Mr. Fandika aqsa |
Date Deposited: | 09 Jun 2017 02:52 |
Last Modified: | 09 Jun 2017 02:52 |
URI: | http://repository.its.ac.id/id/eprint/41547 |
Actions (login required)
View Item |