Ulya, Yulia Uswatun and Camilia, Zuliva Rachma (2017) Perhitungan Anggaran Dan Waktu Pelaksanaan Pada Struktur Utama Dengan Mengganti Pelat Metaldeck Menjadi Metode Konvensional Pada Proyek Transmart Carrefour Rungkut Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
3114030009-3114030014-Non-Degree.pdf - Published Version Download (7MB) | Preview |
Abstract
Proyek Pembangunan Transart Carrefour Rungkut - Surabaya memerlukan penjadwalan pelaksanaan yang ditinjau dari perhitungan waktu dan biaya pelaksanaan. perencanaan anggaran biaya dan waktu dihitung sesuai di lapngan yaitu berdasarkan harga satuan HSPK, survey dan brosur. Sedangkan sumber referensi buku dan Analisa (cara modern) Anggaran Biaya Pelaksanaan karangan Ir. A. Soedrajat S, dan buku referensi untuk kontraktor karangan PT.PP, Tb.K
Pada Pengerjaan proyek ini, kami mengubah metode pelaksanaan pada struktur pelat yang semula menggunakan metaldeck diganti menggunakan pelat secara konvensional. pengubahan metode struktur pelat ini, dikarenakan kami ingin mengetahui hasil kerugian/keuntungan secara waktu dan biaya dengan di gantinya metode secra konvensional. analisa yang dilakukan yaitu perhitungan volume tiap pekerjaan, metode pelaksanaan yang digunakan, kebutuhan sumber daya seperti pekerja, material, dan alat berat yang digunakan, produktivitas pekerjaan. setelah analisa sudah didapatkan maka dapat menghitung waktu dan biaya yang diperlukan dengan menggunakan pelat metode konvensional.
Hasil yang diperoleh berdasarkan analisa perhitungan didapatkan waktu pelaksanaan selama 12 bulan dengan biaya pelaksanaan ebesar Rp 43.276.144.099,30. Sedangkan pelaksanaan pada proyek dengan menggunakan pelat metaldeck menghabiskan biaya Rp 43.680.337.364
================================================================
The transmart Carrefour Rungkut - Surabaya development project requires scheduling of implementation in terms of cost and time calculation. Budget planning time and cost calculated according to the field that is based on unit price HSPK, survey and brochure. While the reference book is from the Analysis (the modern way). Budget implementation arrangements Ir. A. Soedrajat S, and reference book for essay contractor PT.PP (Persero), Tb.k
In this project, we changed the execution method on the plate structure which was originally using metaldeck replaced using a conventional plate. Changing methods on this plate structure, because we want to know the result of loses / profits in time and cost with conventional method instead. Analyzes are the calculation of the volume of each job, the implementation method used, the resource needs sucs as workers, matrials, and heavy equipment used, work producity. Once the analysis has been obtained then it can calculate the time and cost required by using conventional method plates.
The results obtained based on the calculation analysis obtained 12-month implementation time of 365 dayswith the cost of implementation of Rp 43.276.144.099,30. But on the project by using metaldeck plate cost RP 43.680.337.364.
Item Type: | Thesis (Diploma) |
---|---|
Additional Information: | RSS 692.5 Uly p |
Uncontrolled Keywords: | Waktu dan Biaya, Plat Metaldeck, Plat Konvensional |
Subjects: | T Technology > TH Building construction > TH437 Building--Cost control. |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3 |
Depositing User: | Yulia Uswatun Ulya |
Date Deposited: | 06 Sep 2017 04:17 |
Last Modified: | 05 Mar 2019 03:59 |
URI: | http://repository.its.ac.id/id/eprint/42574 |
Actions (login required)
View Item |