Studi Koordinasi Proteksi Pabrik Ammurea II PT. Petrokimia Gresik

Saadah, Shofia Kholisatus (2017) Studi Koordinasi Proteksi Pabrik Ammurea II PT. Petrokimia Gresik. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2215105014_Undergraduate_Theses.pdf]
Preview
Text
2215105014_Undergraduate_Theses.pdf - Published Version

Download (5MB) | Preview

Abstract

Dalam rangka mendukung program pemerintah untuk meningkatkan produksi pertanian dan ketahanan pangan Nasional, PT. Petrokimia Gresik sebagai produsen pupuk yang cukup besar di Indonesia haruslah meningkatkan kualitas dan kuantitas produksinya. Salah satu inovasi yang dilakukan adalah dengan mendirikan sebuah pabrik baru, yaitu Pabrik Ammonia Urea II (Ammurea II) dengan suplai listrik dari pembangkit baru pula yaitu GGCP (Gresik Gas Cogeneration Plant) 1x26,8 MW. Salah satu hal yang perlu dipertimbangkan pada pembangunan sebuah pabrik baru adalah sistem kelistrikannya. Tidak menutup kemungkinan bahwa pada sistem kelistrikan tersebut terjadi gangguan short circuit, overload, dan gangguan lainnya yang akan menyebabkan peralatan – peralatan listrik yang terpasang menjadi rusak dan membuat sistem kelistrikan menjadi kurang handal. Oleh karena itu, untuk menanggulangi hal – hal tersebut, perlu dilakukan studi koordinasi proteksi pada Pabrik Ammurea II. Untuk melakukan studi koordinasi proteksi ini perlu dilakukan pemodelan sistem kelistrikan dengan menggunakan software ETAP 12.6.0, kemudian menganalisa arus hubung singkat minimum dan maksimum. Dan selanjutnya dilakukan setting rele overcurrent dan rele groundfault yang disimulasikan di software ETAP 12.6.0. Grading time yang dipergunakan adalah 0,2 s. Sehingga dihasilkan sebuah desain koordinasi proteksi yang benar sesuai standart IEEE-242.
========================================================================================================================
In order to support government’s programs to increase agricultural production and national food security, PT. Petrokimia Gresik as a leading fertilizer company had to increase it’s quality and quantity. One of innovation that have been done is building a new plant, Ammonia Urea II (Ammurea II) plant which is supplied by a new power plant GGCP (Gresik Gas Cogeneration Plant) 1x26,8 MW. One thing that need to be considered for constructing a new plant is the electrical system. It is possible that on the electrical system there are some failures, such as short circuit, overload, and the others that would damaged the installed electrical equipments and make the electrical system less reliable. Therefore, to avoid that, it is necessary to do protection coordination study on Ammurea II plant of PT. Petrokimia Gresik. First step is modeling the electrical system of Ammurea II Plant PT. Petrokimia Gresik using ETAP 12.6.0 software. Second, analyzing the minimum short circuit (line to line 30 cycle) and the maximum short circuit (3 phase 4 cycle). And the third is set the overcurrent and groundfault relay as a protective electrical equipment. This setting obtained from the manual calculation and then simulated in software ETAP 12.6.0. The grading time that used is 0,2 s. So, we get the right and correct coordination protection according to IEEE-242 standard.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Proteksi, Rele Overcurrent, Rele Groundfault
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK201 Electric Power Transmission
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Faculty of Industrial Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Shofia Kholisatus Sa'adah
Date Deposited: 23 Aug 2017 08:22
Last Modified: 05 Mar 2019 04:32
URI: http://repository.its.ac.id/id/eprint/42642

Actions (login required)

View Item View Item