Analisis Dampak Lalu Lintas Akibat Pembangunan Apartemen Gunawangsa Tidar Surabaya

Rijal, Fikri Maulana (2017) Analisis Dampak Lalu Lintas Akibat Pembangunan Apartemen Gunawangsa Tidar Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113041098-Undergraduate_Theses.pdf]
Preview
Text
3113041098-Undergraduate_Theses.pdf - Published Version

Download (9MB) | Preview

Abstract

Rencana pembangunan Apartement Gunawangsa yang berada di Jl. Tidar No.350 Surabaya, akan menimbulkan bangkitan yang berdampak pada penurunan kinerja ruas jalan dan simpang di sekitar kawasan tersebut. Untuk itu perlu dilakukan Analisis Dampak Lalu Lintas (Andalalin) pada pembangunan Apartemen Gunawangsa Tidar, agar dapat meminimalisir penurunan kinerja jaringan jalan dan simpang, serta dapat memberikan solusi pemecahan masalah lalu lintas yang terjadi akibat pembangunan apartemen tersebut.
Metode yang digunakan pada penelitian ini didasarkan pada Manual Kapasitas Jalan Indonesia (MKJI 1997) dan peraturan terkait lainnya. Tahapan andalalin ini diawali dengan melakukan survei lalu lintas. Tahap selanjutnya memperkirakan bangkitan perjalanan dan menetapkan klasifikasi andalalin. Setelah itu, menganalisa kinerja lalu lintas pada kondisi eksisting dan menganalisa peramalan lalu lintas tanpa dan dengan pembangunan kawasan, menganalisa kebutuhan dan ketersediaan ruang parkir, serta menyusun rekomendasi penanganan dampak lalu lintas akibat pembangunan apartemen tersebut.
Hasil penelitian ini menunjukkan hasil terburuk bahwa kondisi eksisting pada simpang bersinyal Jl. Arjuno – Jl. Tidar dengan nilai LOS F dengan tundaan rata-rata terburuk 74,41 det/smp pada jam puncak sore. Sedangkan simpang tak bersinyal Jl. Tembok Sayuran - Jl. Tidar memiliki nilai LOS F dengan nilai DS sebesar 1,162 pada periode rabu jam puncak sore. Dan untuk segmen jalan di Jl. Pacuan Kuda memiliki nilai LOS E dengan DS sebesar 0,983 pada periode rabu jam puncak sore. Kemudian dilakukan perbaikan pada simpang tersebut dengan beberapa kombinasi alternatif yaitu pelebaran geometrik jalan serta pengaturan waktu hijau sehingga didapatkan tingkat pelayanan yang lebih baik dari kondisi sebelum perbaikan.
=================================================================
Construction plan of Gunawangsa Tidar Apartment located on Jl. Tidar No.350 Surabaya, will cause a rise that will impact on the decrease of road and intersection performance around the are. So that’s why it is necessary to do Traffic Impact Analysis on the construction of Gunawangsa Tidar Apartment, In order to minimize the decline in road and intersection network performance, and can provide solutions to traffic problems that occur due to the construction of the apartment.
The method used in this study is based on Manual Kapasitas Jalan Indonesia (MKJI 1997) and related regulations. This project stage begins with a traffic survey. The next stage estimates the trip generation and sets the andalalin classification. After that, analyze the traffic performance on the existing condition and analyze the traffic forecasting without and with the development of the area, analyze the needs and availability of parking spaces, and prepare recommendations for handling traffic impacts due to the construction of the apartment.
The results of this study show the worst result that the existing condition at the intersection of Jl. Arjuno - Jl. Tidar with LOS F with the worst average delay of 74.41 det /smp during peak hour of the afternoon. While the intersection is not signaled Jl. Tembok Sayuran - Jl. Tidar has an LOS F value with a DS value of 1.162 on the Wednesday afternoon peak hour period. And for the road segment on Jl. Pacuan Kuda has a value of LOS E with DS of 0.983 on the period Wednesday afternoon peak hour. Then performed improvements on the intersection with some alternative combinations of geometric widening of the road as well as setting the green time so that the service level is better than the condition before the repair.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Analisis Dampak Lalu Lintas, Apartemen Gunawangsa Tidar Surabaya, MKJI 1997, LOS, DS, Traffic Impact Analysis, Gunawangsa Tidar Apartment
Subjects: H Social Sciences > HE Transportation and Communications > HE355 Traffic engineering
T Technology > TE Highway engineering. Roads and pavements > TE7 Transportation--Planning
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Fikri Maulana Rijal
Date Deposited: 30 Oct 2017 07:19
Last Modified: 05 Mar 2019 07:37
URI: http://repository.its.ac.id/id/eprint/43121

Actions (login required)

View Item View Item