Evaluasi Drainase Saluran Diversi Gunungsari Ruas Pakal – Benowo Sub Sistem Surabaya Barat Kota Surabaya

Harianto, Jovin Ilham and Hidayat, Bisma Ilham (2017) Evaluasi Drainase Saluran Diversi Gunungsari Ruas Pakal – Benowo Sub Sistem Surabaya Barat Kota Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3114030003-Non_Degree.pdf] Text
3114030003-Non_Degree.pdf
Restricted to Repository staff only

Download (35MB) | Request a copy

Abstract

Berdasarkan hasil peninjauan lapangan oleh Dinas Pekerjaan Umum Bina Marga Kota Surabaya dan juga hasil survey yang dilakukan oleh penulis, Wilayah Pakal dan Benowo dan sekitarnya merupakan kawasan rawan bencana banjir.
Saluran Diversi Gunungsari Ruas Pakal – Benowo merupakan Saluran Sekunder, saluran ini mengalir dari Pakal sampai Kandangan. Di Sepanjang alirannya terdapat 2 pintu air yang mengalirkan menuju saluran primer. Untuk Ruas Pakal Saluran Primernya adalah Kali Sememi dan untuk Ruas Benowo saluran primernya adalah Kali Kandangan. Kali Sememi dan Kali Kandangan mengalir ke Kali Lamong selanjutnya mengalir ke laut. Panjang Saluran Diversi Gunungsari Ruas Pakal - Benowo±5 km.
Dimana yang di normalisasi hanya dimensi saluran. Perhitungan pada pengendalian banjir ini dibagi manjadi dua tahap yaitu perhitungan hidrologi dan perhitungan hidrolika. Pada perhitungan hidrologi, metode yang digunakan pada distribusi curah hujan yaitu dengan metode log Pearson III dan perhitungan waktu konsentrasi menggunakan rumus Kirpich formula, untuk menghitung intensitas hujan menggunakan Metode Mononobe. Sedangkan pada perhitungan hidrolika yaitu dengan menghitung kapasitas saluran eksisting dan dibandingkan dengan debit banjir rencana, untuk mendapatkan debit banjir rencana menggunakan metode rasional.
Alternatif pemecahan masalah untuk menangulangi banjir dengan melakukan normalisasi dengan redesign box culvert atau dengan u-ditch.
Kapasitas saluran eksisting Saluran sekunder diversi Gunungsari Ruas Pakal setelah di normalisasi dengan lebar saluran 2,5 m, Kedalaman Saluran 2,5 m, kemiringan dasar saluran 0,003 dan panjang saluran 2635 m debit yang direncanakan terbesaarnya adalah 21,20 m3/det. Kapasitas saluran eksisting Saluran sekunder diversi Gunungsari Ruas Benowo setelah di normalisasi dengan lebar saluran 2,5 m, Kedalaman Saluran 2,5 m, kemiringan dasar saluran 0,001 dan panjang saluran 3200 m adalah 11,67 m3/det.
==========================================================================================
Based on the results of a review by public works field Bina Marga Surabaya city and also the results of a survey conducted by the authors, the territory of Pakal and Benowo and surrounding flood-prone areas.
Diversion channels Gunungsari Pakal Segment – the secondary Channel is Benowo, the channel is flowing from Pakal until Kandangan. Along the flow, there are two floodgates that drain toward the primary channel. For the segments of the primary Channels Pakal is the Times and to Sections Sememi Benowo primary channel is Home Time. Sememi times and Times Kandangan flows into the Times the next sea flows into Lamong. Line length of Internode Gunungsari Pakal-Versioned Benowo ± 5 km.
The drainage system in the area only the normalization of Benowo and Surabaya Pakal. Where the only dimensional normalization in the channel. Calculation on flood control is divided into two stages, namely calculation of hydrology and hydraulic calculations. On calculation of hydrology, the methods used in the distribution of precipitation that is by the method of log Pearson III and the calculation of the time of concentration using the formula of Kirpich formula, to calculate the intensity of rain using the method "Mononobe". Whereas, in the calculation of hydraulics i.e. by calculating the capacity of existing channels and compared with debit flood plan, to get debit flood plan using the rational method
An alternative workaround for menangulangi flood by performing normalization with redesign box culvert or with u-ditch.
The capacity of the existing secondary Channels tunnel versioned Gunungsari Pakal Segment after the normalization of the channel width 2.5 m, 2.5 m Channel Depth, slope of the base channels and channel lengthy 0.003 2635 m 21.20 m3/sec. existing secondary Channels funnel Capacity versioned Gunungsari Benowo Segment after the normalization of the channel with a width of 2,5 m, the depth of the channel 2,5 m, the slope of the base channels 0.003 and line length 3200 m is 11,67 m3/sec.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Flood, drainage channel Gunungsari, box culvert, banjir, saluran Gunungsari
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: Jovin Ilham Harianto
Date Deposited: 04 Oct 2017 08:10
Last Modified: 03 Jan 2018 03:44
URI: http://repository.its.ac.id/id/eprint/44062

Actions (login required)

View Item View Item