Ali, Ahmad Mahrus (2017) Perencanaan Sistem Drainase Kampus ITS Sukolilo Bagian Selatan. Other thesis, Institut Teknologi Sepuluh Nopember Surabaya.
Preview |
Text
3115105008_Ungraduated_Thesis.pdf Download (6MB) | Preview |
Abstract
Perubahan-perubahan fungsi lahan semakin memperbesar koefisien pengaliran yang pada akhirnya juga akan memperbesar debit limpasan permukaan, hal inilah yang sering kali mengakibatkan terjadinya banjir di kampus ITS Sukolilo.Salah satu kawasan banjir di kampus ITS Sukolilo adalah pada Sistem Drainase kampus ITS Sukolilo bagian selatan yang berpembuang akhir ke sungai Kali Bokor. Berdasarkan hasil surve yang telah dilakukan tinggi genangan yang terjadi Berdasarkan survei yang telah dilakukan terdapat beberapa lokasi terjadinya genangan yang terdapat pada kampus ITS bagian selatan. Tinggi genangan yang terjadi rata rata berkedalaman 20 cm. Penyebab banjir yang terjadi di sub-sistem drainase kampus ITS pada umumnya di karenakan oleh kurangnya daya tampung kapasitas saluran, saluran yang kurang memadahi atau rusak, baik dikarenakan oleh banyaknya sedimen ataupun dimensi saluran yang kurang lebar. Selain itu juga dikarenakan pada beberapa titik lokasi saluran tidak terhubung dengan pembuang akhir sehingga mengakibatkan genangan. Analisa yang dilakukan pada Tugas Akhir ini meliputi analisa hidrologi, analisa hidrolika, dan analisa pompa. Analisa Hidrologi memperrhitungkan curah hujan rencana dengan distribusi Log Pearson Type III periode ulang dua, lima dan sepuluh tahun, serta perhitungan debit banjir rencana menggunakan metode rasional. Untuk perhitungan analisa hidrolika dilakukan untuk mengetahui kapasitas eksisting penampang saluran. Hasil dari evaluasi dilakukan dengan membandingkan debit eksisting dengan debit banjir rencana. Berdasarkan analisa perhitungan diperoleh hasil beberapa dimensi saluran eksisting yang tidak dapat menampung debit banjir rencana yaitu saluran SIII Perumdos 27, SIII Perumdos 32, SII A, SII O, SII T dan saluran SII X. Untuk cara menanggulanginya dilakukan redisain saluran. Selain itu terdapat beberapa perencanaan saluran baru pada beberapa wilayah sistem drainase ITS bagian selatan yang pada kondisi eksisting tidak memiliki saluran drainase, diantaranya yaitu saluran SIII Sawah 1, SIII Sawah 5, SIII Boezem 2 dan SIII Boezem 3. Dari hasil evaluasi kapasitas kolam tampung / boezem ada beberapa kolam tampung yang tidak dapat menampung debit inflow, yaitu kolam tampung 5 dan kolam tampung 6. Pada evalusi kolam tampung 5 saluran outflow dari kolam tampung mampu menampung debit yang dialirkan. Sedangkan pada kolam tampung 6 debit outflow dialirkan melalui pompa air kesaluran buangan akhir yaitu Kali Bokor. Dari hasil perhitungan analisa pompa pada kolam tampung 6, pompa direncanakan sebanyak tiga buah dengan kapasitas masing-masing 0,5 m³/det.
=================================================================================================================================
Changes in land uses will increase the runoff coefficient, that eventually will also increase surface runoff discharges, which is often involve flood in Sukolilo ITS campus. One of the flood areas at the Sukolilo ITS campus is on the southern part of Sukolilo ITS Drainage System which ends on the Kali Bokor river. Based on the survey results that have been done, the height of the inundation that occur is about 20 cm depth. The causes of flooding in the ITS campus drainage sub-system are generally due to lack of capacity of channel, poorly or damaged channel, due to the large number of sediments or narrow channel dimensions. In addition, because at some point the location of the channel is not connected to the last channel so that involve the inundation. The analysis that conducted on this Final Project is including hydrological analysis, hydraulics analysis, and pump analysis. The Hydrological Analysis calculates the rainfall plan using the distribution of the Pearson Type III Logs of two, five and ten years return periods, and also the calculation of the flood discharge plan using the rational method. The hydraulic analysis calculation is conducted to determine the capacity of existing channel cross section. The result of the evaluation is done by comparing the existing discharge to the flood discharge plan. Based on the calculation analysis, there are several dimensions of the existing channel that can not accommodate the flood discharge plan, namely SIII Perumdos 27, SIII Perumdos 32, SII A, SII O, SII T and SII X channel. For how to handle it is by redesign the channel. In addition there are several new channel design in some areas of the southern ITS drainage system which in existing condition does not have drainage line, such as SIII Sawah 1, SIII Sawah 5, SIII Boezem 2 and SIII Boezem 3. From the reservoir capacity evaluation , there are several reservoir that can’t accommodate the inflow discharge, as the 5th reservoir and the 6th reservoir . In the 5th reservoir evaluation, the outflow discharge can streamed by gravity. While on the 6th boezem, the outflow discharge is streamed pass by water pump to the final sewage channel, Kali Bokor. From calculation result of the pump analysis on the 6th pool, it’s planned 3 pump with 0.5 m³ / s capacity.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Perencanaan Ulang, Drainase, Debit Banjir Redesign, Drainage system, Flood discharge |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | - Ahmad Mahrus Ali |
Date Deposited: | 17 Jul 2024 03:44 |
Last Modified: | 17 Jul 2024 06:08 |
URI: | http://repository.its.ac.id/id/eprint/44488 |
Actions (login required)
View Item |