Perencanaan Sistem Drainase Apartemen Grand Dharma Husada Lagoon, Surabaya

astriawati, . (2017) Perencanaan Sistem Drainase Apartemen Grand Dharma Husada Lagoon, Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113100003_undergraduate_theses.pdf]
Preview
Text
3113100003_undergraduate_theses.pdf - Published Version

Download (4MB) | Preview

Abstract

Pembangunan Apartemen Grand Dharma Husada Lagoon yang berlokasi di Jalan Raya Mulyosari mengakibatkan terjadinya perubahan tata guna lahan dimana yang awalnya merupakan daerah resapan air menjadi daerah limpasan air. Perubahan ini mengakibatkan debit limpasan meningkat sehingga kawasan apartemen harus direncanakan sistem drainasenya dengan baik agar tidak membebani saluran kota.
Pada tugas akhir ini dilakukan perencanaan sistem drainase Apartemen Grand Dharma Husada Lagoon yang diawali dengan melakukan analisis hidrologi untuk mendapatkan debit banjir rencana. Setelah itu dilakukan analisis hidrolika untuk merencanakan dimensi saluran yang dapat mengalirkan air hujan dan limbah domestik yang dihasilkan oleh Apartemen. Sebelum dibuang menuju saluran kota, air hujan dan limbah domestik dari sebagian kawasan apartemen di tampung terlebih dahulu pada kolam tampung yang bertujuan untuk mengatur debit pembuangan agar tidak membebani saluran kota. Perencanaan diakhiri dengan analisa backwater pada akhir saluran kawasan apartemen menuju saluran kota.
Hasil dari perhitungan diperoleh, debit limpasan kawasan sebelum apartemen di bangun adalah sebesar 0,337 m3/detik dan setelah dibangun meningkat menjadi 0,879 m3/detik. Dimensi saluran dalam kawasan yangperlukan adalah 0,4 x 0,4m, 0,5 x 0,5m, 0,6 x 0,6, dan 0,8 x 0,8m. Saluran dalam kawasan apartemen dialirkan menuju kolam tampung yang direncanakan dengan luas 992 m2 dan kedalam 2,5m dengan tinggi jagaan 0,5m. Kolam tampung ini mampu menampung volume maksimal sebesar 2637 m3. Air didalam kolam tampung dialirkan menuju saluran kota dengan bantuan dua buah pompa berkapasitas 0,1 m3/detik. Setelah adanya kolam tampung ini, debit outflow dari kawasan apartemen menuju saluran kota turun menjadi 0,271 m3/detik. Pada saluran outlet direncanakan pintu air yang berfungsi untuk menjaga agar tidak terjadi nya backwater dengan lebar pintu 0,8 m, tinggi pintu 0,5 m, dan tinggi bukaan pintu 0,4 m.

================================================================

The construction of Grand Dharma Husada Lagoon Apartment, which is located on Jalan Raya Mulyosari, has changed the land-use from water catchment area into water runoff area. This condition will increase the surface runoff that needs to be drained from the apartment. In order to prevent the city canal from overloading, drainage system in the apartment area should be designed properly.
The first step in planning the apartment's drainage system was conducting hydrological analysis, which resulted the flood discharge. Secondly, performing hydraulic analysis in order to accomodate surface runoff and also domestic waste from the Apartment towers. Before drained to the city canal, discharge from rainrall and domestic waste from several parts of the apartment are retained in the boezem. The planning was concluded with backwater analysis at the end of the channel of the apartment area, right before the city canal.
Based on the calculation results, discharge of the runoff area before the construction was 0.337 m3 / sec, then escalated up to 0.879 m3 / sec after the construction. The channel dimension in the apartment area are 0,4 x 0,4m, 0,5 x 0,5m, 0,6 x 0,6m and 0,8 x 0,8m. The boezem is designed with area of 992 m2, 2,5m in depth with safety height of 0,5m. The boezem is able to accommodate the maximum volume of 2637m3, and is complemented with two pumps with capacity of 0,1m3/s each to flow the discharge to the city canal. By functioning the pond facility, it is found that the outflow discharge from the apartment to the city channel has decreased to 0,271 m3/sec. A water gate is designed at the end of outlet channel to avoid the backwater from the city canal. It is 0,8m wide, with the height of 0,5 m, and opened space of 0,4m.

Item Type: Thesis (Undergraduate)
Additional Information: KPS 690.831 4 Ast p
Uncontrolled Keywords: Drainase, Apartemen, Kolam Tampung
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Astriawati . .
Date Deposited: 08 Nov 2017 07:14
Last Modified: 08 Mar 2019 03:39
URI: http://repository.its.ac.id/id/eprint/45176

Actions (login required)

View Item View Item