Metode Pelaksanaan Proyek Embung Kalisat II Kecamatan Rembang, Kabupaten Pasuruan

Widyananda, Oxy and Fikri, Muhammad Nashir Fajrul (2017) Metode Pelaksanaan Proyek Embung Kalisat II Kecamatan Rembang, Kabupaten Pasuruan. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3114030039-3114030019-Non_Degree.pdf - Published Version

Download (8MB) | Preview

Abstract

Embung atau waduk kecil adalah suatu kolam penampungan air pada musim hujan dan dimanfaatkan pada musim kemarau. Istilah embung berasal dari Nusa Tenggara Timur yang memiliki arti danau kecil. Embung sebagai waduk kecil hanya memiliki tinggi maksimum 15 meter dan volume tampungan airnya kurang dari 500.000 m3. Pada umumnya, embung hanya melayani kebutuhan air untuk satu desa saja dan pencanangan untuk pembangunan embung diusulkan oleh masyarakat setempat. Pada proyek Pembangunan Embung Kalisat II, owner yaitu PU Provinsi Jawa Timur memberikan desain berupa gambar perencanaan kepada kontraktor. Namun pada gambar perencanaan tidak dijelaskan mengenai metode pelaksanaan konstruksi sehingga kontraktor harus membuat “Panduan” cara mewujudkan gambar teknis perencanaan tersebut menjadi pekerjaan/kegiatan yang nyata di lapangan. Metode yang digunakan penulis dalam pembuatan panduan pelaksanaan proyek Embung Kalisat II berdasarkan suvey di lapangan yang dilakukan ketika penulis sedang menjalani kerja praktik. Penulis melakukan wawancara terhadap kontraktor dan pihak yang terkait untuk mendapatkan informasi mengenai realisasi pelaksanaan proyek pembangunan embung. Selain itu, penulis menggunakan studi literatur sebagai dasar teori untuk beberapa item pekerjaan di lapangan. Dalam pelaksanaan pembangunan Embung Kalisat di Desa Kalisat, Kecamatan Rembang, proses pengukuran menggunakan theodolit untuk memudahkan pembagian sudut As embung dan area potongan embung. Untuk proses penimbunan, tanah timbunan diperoleh dari lokasi proyek dan pemadatannya menggunakan vibrating roller sebanyak 6 lintasan dengan ketebalan hamparan 40 cm per layer. Sedangkan untuk proses pengecoran secara keseluruhan, menggunakan beton mutu K-175. ========================================================================================= A small dam or reservoir is a water storage ponds in the rainy season and utilized during the dry season. The term dam comes from East Nusa Tenggara meaning small lake. As a small reservoir dam only has a maximum height of 15 meters and the water catchment of the volume less than 500,000 m3. In General, the dam only serves the needs of water for one village alone and the groundbreaking for the construction of the dam was proposed by local people. On the construction of the Dam Kalisat II, owner i.e. PU East Java province gives the design form of the planning picture to the contractor. But on the image of planning not described about the method of implementation of the construction so that the contractor should make a "instructions" how to realize technical drawings of planning becomes a real job/activity in the field. The method used by the authors in making the implementation guide of Embung Kalisat II project based on survey in the field done when the author is undergoing practical work. The authors conducted interviews with contractors and related parties to obtain information on the realization of embung development project implementation. In addition, the authors used literature studies as theoretical basis for some work items in the field. In the implementation of Kalisat dam construction in Kalisat Village, Rembang District, the measurement process uses theodolite to facilitate the distribution of dam angle As and cut area of dam. For the landfilling process, the embankment soil is obtained from the project site and compaction using a vibrating roller of 6 trajectories with a thickness of a stretch of 40 cm per layer. As for the casting process, using K-175 quality concrete.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Kata kunci : Metode pelaksanaan, Embung
Subjects: T Technology > TH Building construction
Divisions: Faculty of Vocational > Civil Infrastructure Engineering
Depositing User: Muhammad Nashir Fajrul Fikri
Date Deposited: 11 Oct 2017 07:00
Last Modified: 08 Mar 2019 02:12
URI: http://repository.its.ac.id/id/eprint/45437

Actions (login required)

View Item View Item