Handarweni, Revinda Niola Dwi (2017) Perhitungan Biaya dan Waktu serta Metode Pelaksanaan Penggunaan Half Slab Precast pada Hotel Amaris, Jl. Bintoro Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
3113041058_RevindaNiolaDwiHandarweni.pdf - Published Version Download (27MB) | Preview |
Abstract
Pada dunia konstruksi khususnya untuk struktur plat lantai telah mengalami perkembangan mulai dari metode pengecoran yang dipakai, maupun material yang digunakan. Precast halfslab merupakan salah perkembangan metode yang ada saat ini dan sudah mulai banyak digunakan untuk proyek gedung tinggi karena dianggap memiliki waktu pelaksanaan yang lebih cepat serta dapat mereduksi kebutuhan bekisting.Pembangunan Hotel Amaris merupakan bangunan gedung tinggi dengan jumlah lantai 11 lantai meliputi satu lantai semi basement, 8 lantai hotel, satu lantai EQP dan satu lantai Atap. Data sekunder yang diperoleh dari pihak pelaksana yaitu beruba gambar struktur meliputi standard detail, denah pondasi, denah pembalokan, detail semi basement, pile cap balok dan sloof, kolom, tangga. Pada proyek pembangunan hotel Amaris semua pekerjaan beton struktur menggunakan metode pengecoran in situ sedangkan dalam perhitungan ini struktur pelatnya menggunakan metode Half Slab precast dan untuk pekerjaan beton struktur lainnya menggunakan metode cast in situ.Perhitungan biaya dan waktu dilakukan dengan menghitung volume tiap-tiap item pekeerjaan yang telah ditentukan serta menentukan metode pelaksanaan masing-masing item pekerjaan untuk menghitung produktivitas baik alat, material maupun tenaga manusia, sehingga diperoleh biaya dan durasi pelaksanaan.Perhitungan biaya dan waktu meliputi pekerjaan struktur bawah dan pekerjaan struktur atasDari perhitungan yang telah dilakukan diperoleh hasil yaitu biaya pekerjaan senilai Rp. 9.707.173.844,- dengan waktu pelaksanaan 391 hari kalender. Perhitungan diatas merupakan perhitungan khusus untuk struktur bangunannya saja.
=================================================================
In construction, structures keep developing, especially slab structure starts from concrete casting method and material that used. Precast halfslab is one of method’s development which is exist now and already use frequently for high building project, because it considers as having execution time faster and can reduce formwork requirement.Amaris Hotel construction is a high building that has total 11 story that include one semi-basement floor, 8 hotel hotel floor, one EQP floor and one roof floor. Secondary data which achieved from constructor are structure drawing, such as details, foundation site plan, beam site plan, semi basement detail, pile cap beam and sloof, column, staircase. In Amaris Hotel construction, all concrete structure work using in situ concrete casting method, in fact the slab structure’s estimation is using precast half slab and other concrete structure work is using cast in situ concrete casting method.Cost and time estimation is done by calculating every volume per work’s item that has been determined also determine execution method each works’ items for estimating tool, material, and worker productivity, also cost and duration. Cost and time estimation covers upper and bottom structure.From the estimation that has been done, the result is Rp. 9.707.173.844,- with implementation time 391 calender days. The estimation above is only for the structure.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | waktu pekerjaan, precast half slab, biaya, Implementation Time, Precast Half Slab, Cost |
Subjects: | T Technology > T Technology (General) > T56.8 Project Management T Technology > TH Building construction > TH437 Building--Cost control. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D3) |
Depositing User: | Revinda Niola Dwi Handarweni |
Date Deposited: | 15 Nov 2017 07:08 |
Last Modified: | 08 Mar 2019 03:43 |
URI: | http://repository.its.ac.id/id/eprint/45469 |
Actions (login required)
View Item |