Monitoring Dan Setting Relay Satu Fasa Terhadap Gangguan Over Current

Nubli, Abi (2017) Monitoring Dan Setting Relay Satu Fasa Terhadap Gangguan Over Current. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2214038009-Non_Degree.pdf]
Preview
Text
2214038009-Non_Degree.pdf - Published Version

Download (4MB) | Preview

Abstract

Sistem kelistrikan di Indonesia saat ini di atur oleh perusahaan BUMN yang bernama PT. PLN Persero. Jadi untuk segala hal yang berkaitan dengan kelistrikan termasuk proteksi pada jaringan listrik di Indonesia yang mengurusi adalah pegawai – pegawai dari PLN. Pada proteksi jaringan listrik ini menggunakan relai dan relai ini akan bekerja bila arus yang melewati sensor relai besarnya melebihi arus yang di atur pada relai, sehingga kontak relai menutup dan mengirimkan sinyal pada coil PMT untuk memerintahkan PMT bekerja.
Relai ini biasa di pasang pada setiap jaringan listrik yang perlu di proteksi dan dibutuhkan koordinasi yang tepat agar relai tidak trip secara bersamaan. Untuk memberikan setting pada relai dan memantau kondisinya, operator juga harus menuju ke tempat relai itu berada agar bisa diberikan setting yang diperlukan.
Pada Tugas Akhir ini kami telah membuat dua buah digital relai untuk simulasi trip pada jaringan listrik satu fasa beserta koordinasinya agar tidak trip secara bersamaan pada saat terjadi gangguan pada salah satu saluran listrik. Relai ini dibuat digital agar mudah untuk melihat kondisinya secara langsung, karena terdapat LCD pada relainya yang akan menampilkan beberapa kondisi relai tersebut.
Dan agar operator tidak repot memberikan setting pada relai dan memantau kondisi relainya dengan datang langsung ke tempat relai itu berada, maka kami juga membuat sebuah program untuk memberikan setting pada kedua relai ini oleh satu komputer saja dengan jarak yang cukup jauh. Jarak ini bisa menjangkau kurang lebih 1200 meter, karena kami menggunakan media pengiriman RS485. Program ini dibuat menggunakan software Lazarus dengan komunikasinya dengan kedua relai menggunakan protokol Modbus.
=================================================================================================
Electrical system in Indonesia is currently set by a company called PT. PLN Persero. So for all things related to electricity, including protection on electric power grid in Indonesia who take care is the employees of PLN. On this electric power protection using relays and relays will work when the current through the relay sensor is larger than the current set on the relay, so the relay contact closes and sends a signal to the PMT coil to order the PMT to work.
These relays are commonly installed on any power grid that needs to be protected and proper coordination is needed so that the relays do not trip simultaneously. To provide settings to the relays and monitor conditions, the operator must also go to where the relay was located in order to be given the necessary settings.
In this Final Project we have made two digital relays for trip simulation on single-phase electric power line along with its coordination so as not to trip simultaneously in the event of interference on one power line. This relay is made digital so it is easy to see its condition directly, because there is LCD in relainya which will show some condition of the relay.
And so that the operator does not bother to provide settings on relays and monitor the condition of the relay by coming directly to where the relay is located, then we also create a program to provide settings on both relays by a single computer with a considerable distance. This distance can reach approximately 1200 meters, because we use RS485 delivery media. This program was created using Lazarus software with its communication with both relays using Modbus protocol.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: proteksi jaringan listrik, digital relai, koordinasi relai, pengaturan jarak jauh relai, pemantauan relai
Subjects: T Technology > T Technology (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK5105 Data Transmission Systems
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK5101 Telecommunication
Divisions: Faculty of Industrial Technology > Electrical Engineering > 20401-(D3) Diploma 3
Depositing User: Abi Nubli .
Date Deposited: 24 Nov 2017 02:14
Last Modified: 08 Mar 2019 01:48
URI: http://repository.its.ac.id/id/eprint/45804

Actions (login required)

View Item View Item