Waktu dan biaya pelaksanaan metode open cut (cut and cover) pembangunan underpass simpang mandai makassar sulawesi selatan

Septiawan, Rahmat Yuna (2017) Waktu dan biaya pelaksanaan metode open cut (cut and cover) pembangunan underpass simpang mandai makassar sulawesi selatan. Undergraduate thesis, Institut Teknologi Sepuluh November.

[thumbnail of TA_3115040607-Rahmat Yuna Septiawan.pdf]
Preview
Text
TA_3115040607-Rahmat Yuna Septiawan.pdf - Published Version

Download (24MB) | Preview

Abstract

Di dalam pembangunan suatu proyek khususnya pada proyek pembangunan underpass Simpang Mandai yang berlokasi ditengah-tengah lalu lintas yang padat diperlukan metode pelaksanaan yang tepat dengan menggunakan metode open cut (cut and cover) sebagai platform serta pengendalian waktu pelaksanaan dan biaya pelaksanaan. Proyek ini membahas tentang metode pelaksanaan dengan menggunakan metode open cut (cut and cover) dalam pembangunan underpass ini. Analisa yang dilakukan pada proyek ini adalah perhitungan volume pada tiap-tiap jenis pekerjaan, biaya sewa peralatan, dan kebutuhan bahan yang diperlukan. Biaya konstruksi yang dihitung secara manual didapatkan sebesar Rp.103.826.879.058 dan waktu pelaksanaanya adalah 562 hari.

============================================================================

In the construction of a project, especially in the construction project underpass Intersection of Mandai located in the middle of heavy traffic, it is necessary to implement the right method by using open cut method as a platform and control the implementation time and implementation cost. This project discusses the implementation method using open cut (cut and cover) method in the construction of this underpass. Analyzes undertaken on this project are volume calculations on each type of work, equipment rental costs, and material requirements required. The calculated manually calculated construction cost is Rp.103.826.879.058 and the execution time is 562 days.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Underpass simpang Mandai, Waktu dan Biaya, Metode Pelaksanaan
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Rahmat Yuna Septiawan
Date Deposited: 02 Feb 2018 01:44
Last Modified: 08 Mar 2019 02:45
URI: http://repository.its.ac.id/id/eprint/46409

Actions (login required)

View Item View Item