Rencana Distribusi Dan Operasi Air Bersih Dari Embung Kalisat Untuk Masyarakat Desa Kalisat Kecamatan Rembang Kabupaten Pasuruan

Aji, Bangkit Widya (2017) Rencana Distribusi Dan Operasi Air Bersih Dari Embung Kalisat Untuk Masyarakat Desa Kalisat Kecamatan Rembang Kabupaten Pasuruan. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113041005-Undergraduate_Theses.pdf]
Preview
Text
3113041005-Undergraduate_Theses.pdf - Published Version

Download (4MB) | Preview

Abstract

Air mempunyai peranan penting dalam kehidupan manusiadan makhluk lainnya di alam ini. Tidak ada satupun kehidupan didunia ini yang tidak membutuhkan air. Pertumbuhan penduduk harus diikuti dengan ketersediaan air bersih yang sehat dancukup. Air tersebut dapat berasal dari atas permukaan tanah,bawah maupun dari tanah (misalnya air sungai, air danau da nlain sebagainya) yang sebelum digunakan harus diolah terlebih dahulu.
Saat ini di Desa Kalisat telah dibangun embung yang tujuan awalnya untuk memenuhi kebutuhan air bersih di Desa Kalisat. Namun hingga saat ini tidak ada sistem pendistribusian air bersih dari Embung Kalisat tersebut.
Perencana menargetkan proyeksi pelayanan air bersih padatahun 2041 sebesar 251 m3/hari terpenuhi dari Embung Kalisatyang berada di Desa Kalisat Kecamatan Rembang Kabupaten Pasuruan dengan volume kapasitas embung sebesar 57000 m3.Dalam perencanaan ini, diprediksikan penduduk yang
akan mendapatkan layanan 6084 orang.
==============================================================================================
Water takes essential role for human being and othercreature on earth. There is no subsistence of life if there is nowater. In hand with the huge growth of citizen, should be chasedby the availability of health and clean water. Moreover, there aremany supplies of water that can be found, such as ground surfacewater source, under ground water (lake, river) That need to be processed first.
In this moment. Kalisat village has built a dam in order to maintaint production of clean water for daily life for itscitizens. Unfortunately, There is no good and settle system to distribute and maintaining the stream of water for confinedcitizen.
Planners are targeting the projection clean water services onknown 2041 of 251 m3/day are met from the dam in the Village of Kalisat district Rembang Pasuruan region. The volume capacity of the dam 57000 m3 and in this plan, will suplay water for 6084 villager.

Item Type: Thesis (Undergraduate)
Additional Information: RSIS Aji r-1
Uncontrolled Keywords: Distribution, Dam, Water
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering > TC1680 Offshore structures
T Technology > TC Hydraulic engineering. Ocean engineering > TC812 Irrigation
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4
Depositing User: Aji Bangkit Widya
Date Deposited: 06 Dec 2017 01:37
Last Modified: 06 Mar 2019 06:28
URI: http://repository.its.ac.id/id/eprint/46638

Actions (login required)

View Item View Item