Desain Kapal Pembangkit Listrik Menggunakan Tenaga Gelombang Air Laut Untuk Daerah Papua

Devara, Bimo Taufan (2017) Desain Kapal Pembangkit Listrik Menggunakan Tenaga Gelombang Air Laut Untuk Daerah Papua. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4113100072-Undergraduate_Thesis.pdf]
Preview
Text
4113100072-Undergraduate_Thesis.pdf - Published Version

Download (2MB) | Preview

Abstract

Kondisi kelistrikan di Indonesia belum merata, bahkan untuk wilayah Indonesia bagian Tengah dan Timur, pasokan listrik masih jauh dari cukup. Kondisi ini disebabkan karena beberapa hal, yang salah satunya adalah kurang meratanya pembangunan pada daerah-daerah Indonesia bagian tengah dan timur . Papua adalah provinsi yang memiliki tingkat elektrifikasi terendah di Indonesia dimana dari keseluruhan wilayahnya hanya 47% yang sudah teraliri listrik. Dalam Tugas Akhir ini akan didesain kapal pembangkit listrik dengan tenaga gelombang air laut sebagai unit pembantu pada Kota Serui, dengan daya yang dihasilkan adalah 36 MWh. Kebutuhan listrik yang ideal dari Kota Serui adalah sebesar 8,4 MW, sedangkan daya yang telah terpasang adalah 5,6 MW sehingga kekurangan daya adalah sebesar 2,8 MW. Desain kapal pembangkit listrik diawali dengan pemilihan alat-alat pembangkit listrik tenaga gelombang air laut, yaitu floats, inverter dan baterai. Dibutuhkan dua buah kapal untuk memenuhi seluruh kebutuhan listrik Kota Serui dengan masing-masing menggunakan 18 baterai dengan masing-masing daya sebesar 2 MW dan 20 floats dengan masing-masing daya sebesar 0.2 MW. Setelah itu dibuat Layout awal untuk mencari ukuran utama awal kapal. Ukuran Utama Kapal yang didapatkan adalah L = 95,89 m, B = 18,5 m, H = 5,2 m, T = 3,75 m. Dari ukuran utama kapal ini bisa dihitung perhitungan teknis, dan dibuat Lines Plan, General Arrangement dan 3D Modeling.

=================================================-===============

Electricity condition in Indonesia as a whole is still spread not evenly, even for the region of Central and Eastern part of Indonesia, the electricity supply is still far from sufficient. This condition is caused by several reason, and one it is the uneven development in the areas of central and eastern Indonesia. Papua is a province that has lowest level of electrivity in Indonesia, as a whole area only have 47% electricity. In this Final Project will be designed Power Plant Ship as an support unit in Serui City, with the generated power is 36 MWh. The ideal electrical needs of the Serui City approximatedly 8.4 MW, while power is 5.6 MW have been installed so that the power shortage is 2,8 MW. Power Plant Ship design begins with the selection item for producing electricity, such as floats, inverter and battery. Needed two ships for fulfilling the power shortage with each ships used 18 battery with each power of 2 MW and 20 floats with each power of 0.2 MW. After that initial layout was made to find the size of the initial main dimension. Main dimension of the vessel is L = 95.89 m, B = 18.5 m, H = 5.2 m, T = 3.75 m. From this main dimension can be calculated technical calculations and made Lines Plan, General Arrangement and 3D Modeling Design.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Kapal Pembangkit Listrik, Tenaga Gelombang Air Laut, Papua, Kota Serui
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: Bimo Taufan Devara
Date Deposited: 25 Oct 2017 07:06
Last Modified: 05 Mar 2019 08:45
URI: http://repository.its.ac.id/id/eprint/47670

Actions (login required)

View Item View Item